Rick A Debernard Excavating, Incorporated

186 Fisher Ln, Fredericksburg, VA 22405
(540) 371-0962
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Excavation

SERVICE AREA

Washington

BUSINESS OVERVIEW

Rick A Debernard Excavating, Incorporated- 40 plus years experience- high quality equipment

Get Quotes
From up to 3 Prescreened
Excavation Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Excavation Contractors in Fredericksburg, VA:


Project: Remove a Water or Fuel Tank
Date: 05/20/2019
Kind of Tank: Above ground
Material Stored in Tank: Heating oil
How Long Since Tank Was Used: Don't Know
Leakage Details: No
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: stopped using oil heat.

Project: Excavate or Grade the Slope of the Grounds
Date: 05/20/2019
Purpose of Excavation: Other
Request for Commercial Location: No
Site surveyed for underground utility lines: No
Request Stage: Ready to Hire
Desired Completion Date: More than 2 weeks
Property Owner: Yes
Comment: I have a 21' round swimming pool, which I need an area for a 22'sq feet box. The ground has to be leveled - 9" at front and raised + 9" at the back.

Project: Excavate or Grade the Slope of the Grounds
Date: 05/13/2019
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Excavate or Grade the Slope of the Grounds
Date: 05/12/2019
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Excavate or Grade the Slope of the Grounds
Date: 05/10/2019
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Clear Land and Prepare Building Site
Date: 05/09/2019
Reason for Clearing: Other
Trees/Structures to Remove: Trees, Tree Stumps
Topography: Flat, Slightly sloped
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Financing Requested: No
Property Owner: Yes
Comment: clearing, and clean look

Project: Clear Land and Prepare Building Site
Date: 05/08/2019
Reason for Clearing: Landscaping
Trees/Structures to Remove: Trees, Other
Topography: Flat
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Financing Requested: No
Property Owner: Yes
Comment: The back of our residential lot is partially wooded. A strip, about 20' deep by 150' in length containing mainly low ground growth (bushes, vines, and small trees) needs to be cleared. We would like to keep the large trees and hope to plant grass once complete. We do have some poison intermixed with the growth. There is also remnants of an old vehicle from many years back (mostly rotted away) right on the edge of the property line. Google Earth will give you an overhead shot of the property: 5800 South Cedar Ridge Ln, Fredericksburg VA 22407.

Project: Excavate or Grade the Slope of the Grounds
Date: 05/08/2019
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: I would like to get an estimate for

Project: Clear Land and Prepare Building Site
Date: 05/03/2019
Reason for Clearing: Landscaping
Trees/Structures to Remove: Trees
Topography: Slightly sloped
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Financing Requested: No
Property Owner: Yes
Comment: Need to have trees removed that are currently down on property.

Project: Excavate or Grade the Slope of the Grounds
Date: 04/2019
Purpose of Excavation: Small outbuilding (shed), Driveway, Other
Request for Commercial Location: No
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks