Skill & Integrity Builders, Inc.

P.O. Box 72, Port Orchard, WA 98366
(360) 895-0940
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Bremerton

CREDENTIALS

State Licensing

Trade:

License #: SKILLIB022JT

Expiration: Thu Apr 28 18:00:00 MDT 2016

BUSINESS OVERVIEW

At Skill & Integrity Builders, Inc., our name is our claim to fame! From installing readymade cabinets, to whole house renovation, we are on time on budget and no job is done unless you are 100% satisfied. When you call us to do your next project, we will be doing your work from now on. Call us today and watch your project woes fly away!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Port Orchard, WA:


Project: Renovate or Repair a Home
Date: 06/18/2019
Project Description: Major home repair project
Project Type: Both
Work included: Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: I would like to get an estimate for manufactured home double wide put together

Project: Renovate or Repair a Home
Date: 06/18/2019
Project Description: Major home repair project
Project Type: Both
Work included: Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: I would like to get an estimate for manufactured home double wide put together

Project: Remodel a Kitchen
Date: 06/18/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Update my kitchen with flooring, cabinets, counter top, sink.

Project: Remodel a Bathroom
Date: 06/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Nee tub and tile behind the tub also a new sink in bathroom.

Project: Remodel or Renovate One or More Rooms
Date: 06/17/2019
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Bedroom(s), Living room, Dining room, Other
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: In our 2-story house that was built in 1991: 1) Raise or open interior walls between entryway, living room and dining room to create a more open floor plan. 2) Update the staircase from fully carpeted steps to hardwoods. 3) Convert two upstairs bedrooms into one.

Project: Build an Addition
Date: 06/15/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bedroom(s)
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Want to add onto my 1970s rambler. Expand the master bedroom and 2nd bedroom by 4’

Project: Build an Addition
Date: 06/15/2019
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: Full home remodel with addition

Project: Remodel a Bathroom
Date: 06/13/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Add a bathroom in existing space. Move laundry area to garage.

Project: Remodel a Bathroom
Date: 06/12/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Remodel a Bathroom
Date: 06/12/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Total bathroom remodel. Remove popcorn ceilings. New flooring. Remove walls