Company Logo

Thomas R. Moran Construction Company, Inc.

417 Virginia St., Marietta, OH 45750
(740) 374-2362
5.0 | 2 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Marietta

CREDENTIALS

State Licensing

Trade:

License #: WV001906

Expiration: Wed Dec 30 17:00:00 MST 2009

BUSINESS OVERVIEW

Having been in business since 1977, it should be easy to know what company will take care of you the best. We want to make sure that all your expectations are met, so attention to detail is a must!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

Thomas R. Moran Construction Company, Inc.
Showing 1-2 of 2
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
5.0   |  
Review by in Huntington, WV
I was very pleased.
Was this review helpful?  
5.0   |  
Review by in Parkersburg, WV
Project: Repair Drywall
He was here when he said he would be. The job was finished quicker than expected. I am very satisfied with the outcome.
Showing 1-2 of 2
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Marietta, OH:


Project: Renovate or Repair a Home
Location: Marietta, OH
Date: 07/15/2019
Project Description: Other
Project Type: Exterior
Work included: Roofing, Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: SHINGLES, EASTSPOUT , FACIA

Project: Build an Addition
Location: Marietta, OH
Date: 07/10/2019
Project Description: Build - Use existing architectural drawings
Type of Addition: Second story addition
Rooms Included:: Deck/Porch
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: WIND TORE DOWN EASTSPOUT AND FACIA, AND WOOD BEHIND IT

Project: Renovate or Repair a Home
Location: Marietta, OH
Date: 07/09/2019
Project Description: Major home repair project
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Ant damaged walls

Project: Remodel a Bathroom
Location: Marietta, OH
Date: 07/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Build an Addition
Location: Marietta, OH
Date: 06/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bedroom(s)
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: We're wanting to add an additional bedroom to our house. Ideally, we'd like part of an existing bedroom converted to a hallway leading to the new bedroom. We also would like a closet moved, so that both the new and existing bedroom will have at least one window.

Project: Build an Addition
Location: Marietta, OH
Date: 06/2019
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: I want to extend my kitchen 10 feet out

Project: Remodel a Kitchen
Location: Marietta, OH
Date: 06/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Remodel a Basement
Location: Marietta, OH
Date: 06/2019
Basement Features: Game Room
Design Preparation: Sketches of basic idea of project
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Marietta, OH
Date: 06/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Location: Marietta, OH
Date: 06/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: We need to install a shower in 1st floor bath, install drywall, replace sink and put doors on existing shelves. In the upstairs bath we may need the flooring replaced and will need a shower installed.