Kitchen Bath And Glass Center
Kitchen Bath And Glass Center
General Contractor, Supplying : Frameless Showers, cabinets, counter tops, tile mirrors, shelving, kitchen and bath remodeling, whole house restoration, and remodeling, water and fire damage, electrical and plumbing services, we carry plumbing fixtures and hardwood flooring, carpentry, baseboards, crown molding
"In the past 5 years we have re-done our entire house - replaced all windows & doors to meet hurricane code, Mater Bathroom, front entry, pool, patio, back deck, carpet and finally the kitchen using a number of contractors - Chris Fuller, owner of Kitchen Bath and Glass Center is the worst contractor, HANDS DOWN. We spent >$30K with him on cabinets, counter tops, sink, and a center island quartz top. We were told the project would take "4-6 weeks" and actually took >15 weeks to complete and the delays are due to inferior workmanship, poor quality cabinets and outright mistakes made by Kitchen Bath and Glass, here are the facts: Chris Fuller never once set foot in our house prior to, or during the renovation project - even after all of problems started. When they did start, he initially took our phone calls but soon reverted to having his employees respond. Kitchen Bath and Glass Center ordered the wrong Quartz material for the island and it took two weeks to replace it. When it finally arrived it couldn't be installed because " the cabinets weren't square". His cabinet installer didn't line up the cabinets properly. The Kitchen Bath and Glasss Center countertop and cabinet subcontractors work required both of them to make numerous return visits to fix visually obvious defects - both subcontractors were criticized by the other installers, electricians, plumbers, tile guys, etc. One said, "I haven't seen this shabby of cabinet work in 18 years on the job". Another subcontractor from Orlando said, "Brevard county construction work is not very good but this counter top is terrible". The countertop subcontractor measured and made the wrong cuts - and didn't order the replacement product until 3 weeks later; nobody at Kitchen Bath and Glass bothered to check into this until we complained. When it was finally ordered we were told it was "out of stock in the state of Florida" and wouldn't be in for at least 3 weeks. Kitchen Bath and Glass Center ordered the wrong cabinets - we wanted a drawer capable of holding hanging files; they "forgot". The workmanship of the cabinets was shoddy - we have warped cabinet doors and three different portions of cabinets didn't have internal hardware installed or was only partially installed. The project is now complete thanks to multiple shims, glue, and faux pieces of trim. We are not satisfied with the outcome. My recommendation: Avoid Kitchen Bath and Glass COMPLETELY - You can easily find a better contractor than Chris Fuller for ANY project to be done on your house."
Gary H on February 2018
General Contractor, Supplying : Frameless Showers, cabinets, counter tops, tile mirrors, shelving, kitchen and bath remodeling, whole house restoration, and remodeling, water and fire damage, electrical and plumbing services, we carry plumbing fixtures and hardwood flooring, carpentry, baseboards, crown molding
"In the past 5 years we have re-done our entire house - replaced all windows & doors to meet hurricane code, Mater Bathroom, front entry, pool, patio, back deck, carpet and finally the kitchen using a number of contractors - Chris Fuller, owner of Kitchen Bath and Glass Center is the worst contractor, HANDS DOWN. We spent >$30K with him on cabinets, counter tops, sink, and a center island quartz top. We were told the project would take "4-6 weeks" and actually took >15 weeks to complete and the delays are due to inferior workmanship, poor quality cabinets and outright mistakes made by Kitchen Bath and Glass, here are the facts: Chris Fuller never once set foot in our house prior to, or during the renovation project - even after all of problems started. When they did start, he initially took our phone calls but soon reverted to having his employees respond. Kitchen Bath and Glass Center ordered the wrong Quartz material for the island and it took two weeks to replace it. When it finally arrived it couldn't be installed because " the cabinets weren't square". His cabinet installer didn't line up the cabinets properly. The Kitchen Bath and Glasss Center countertop and cabinet subcontractors work required both of them to make numerous return visits to fix visually obvious defects - both subcontractors were criticized by the other installers, electricians, plumbers, tile guys, etc. One said, "I haven't seen this shabby of cabinet work in 18 years on the job". Another subcontractor from Orlando said, "Brevard county construction work is not very good but this counter top is terrible". The countertop subcontractor measured and made the wrong cuts - and didn't order the replacement product until 3 weeks later; nobody at Kitchen Bath and Glass bothered to check into this until we complained. When it was finally ordered we were told it was "out of stock in the state of Florida" and wouldn't be in for at least 3 weeks. Kitchen Bath and Glass Center ordered the wrong cabinets - we wanted a drawer capable of holding hanging files; they "forgot". The workmanship of the cabinets was shoddy - we have warped cabinet doors and three different portions of cabinets didn't have internal hardware installed or was only partially installed. The project is now complete thanks to multiple shims, glue, and faux pieces of trim. We are not satisfied with the outcome. My recommendation: Avoid Kitchen Bath and Glass COMPLETELY - You can easily find a better contractor than Chris Fuller for ANY project to be done on your house."
Gary H on February 2018