
In business since 2007
Free estimates
"Work done timely and cleaned up as promised"


In business since 2007
Free estimates
"Work done timely and cleaned up as promised"

In business since 1986
Free estimates
10 employees. Uses subs for roofing & gutters.

In business since 2005
Free estimates
Emergency services offered
"They were wonderful. Chad was very thorough, professional and a man of his word." It looks great and we are thrilled."

In business since 2001
Free estimates
"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."

In business since 1950
Emergency services offered
"They did a great job and converted a distressed into a really nice space."
In business since 1992
Free estimates
Established in 1992,Pricing varies per project,New Home Design and Drafting, Preliminary designs, Remodeling, Basement finishing, Stock plans available, Meeting with a design professional at our office by appointment only.
In business since 1980
Free estimates
Warranties offered
10 EMPLOYEES. USES SUBS FOR ELECTRICAL, PLUMBING, MASONRY, & CONCRETE WORK. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. ADDITIONAL SERVICE AREAS: RICE & SIBLEY COUNTIES.
Free estimates
Emergency services offered
Warranties offered
Here at Creative Home Concepts we don't just work for you, we work with you. We have decades of experience in landscape and design. Our team has the skills necessary to complete every aspect of your project from start to finish, at the highest standards possible. We have mastered the landscape construction process to ensure we get the job done right the first time.

In business since 2012
Free estimates
Emergency services offered
"Sunflake did a great job getting my 1940s home up to code for rental certification. They had great suggestions to keep it affordable and everything turned out great. Would highly recommend."
In business since 2010
Free estimates
Emergency services offered
"Excellent to work with."
From average costs to expert advice, get all the answers you need to get your job done.

Composite fencing costs range depending on the fence height and length, materials, and location. Difficult terrain can increase fencing costs as well as additional features like gates.

Find out who to hire to replace porch columns, when to call carpenters or masons, what it costs, and how pros get it done.

Learn how to find and hire the right deck carpenter or contractor for your next project with our hiring guide!

Wondering who builds decks? Learn which deck contractors to hire, other pro options, and costs so you can plan and hire with confidence.

Learn how much it costs to seal a deck, exploring factors like its size, materials, sealant type, prep work required, and local labor rates.

Learn the top factors that affect Ipe decking costs, including the material brand, project size, labor rates, add-ons, and permit fees.