Recent Job Requests for Install or Replace a Bathtub Contractors in Leander, Texas:
Project Location:
Leander,
TX
78641
Date: 06/16/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: The bathtub shower combo in this bathroom is very old and needs to be replaced and updated.
Project Location:
Leander,
TX
78641
Date: 04/2013
Type of tub install: Shower / tub combo
Bathtub: Install a new bathtub (No existing bathtub)
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Part of larger remodel: Yes
Property Owner: Yes
Comment: took the old bathtub out and need help installing a new one.
Project Location:
Leander,
TX
78641
Date: 03/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Comment: Replace shower tub surround, replace fossit and clear drain
Project Location:
Leander,
TX
78645
Date: 02/2013
Type of tub install: Free-standing (clawfoot, legged)
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: Removal of fiberglass surround for small condo bathroom. Install porcelain bathtub
Project Location:
Leander,
TX
78641
Date: 01/2013
Type of tub install: Soaking
Bathtub: Replace or move existing bathtub
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Project Location:
Leander,
TX
78641
Date: 07/2012
Type of tub install: Walk in (special needs)
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Project Location:
Leander,
TX
78641
Date: 07/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Less than 2 months
Comment: The bathroom tub needs to be taken out and roll in ADA accessible shower needs to be put in.
Project Location:
Leander,
TX
78641
Date: 05/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Both
Desired Completion Date: More than 2 months
Comment: replace plastic insert with enclosed stone shower
Project Location:
Leander,
TX
78645
Date: 05/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Comment: Installation of new shower head, handler and tile.
Project Location:
Leander,
TX
78641
Date: 05/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Timing is flexible
Comment: I desire to make my tub/shower area more handicapped assessable for my future senior years.
Project Location:
Leander,
TX
78641
Date: 05/2012
Comment: I am looking to add an extra bathtub in my bathroom. I have already ordered the bathtub, but I need a plumber to hook it up, install all of the piping and drains necessary for the bathtub.
Project Location:
Leander,
TX
78645
Date: 03/2012
Type of tub install: Whirlpool / jetted tub
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: need to replace bathtub and surrounding tile
Project Location:
Leander,
TX
78641
Date: 03/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Less than 2 months
Comment: turn tub too a walk in shower with a half wall and full slideing glass door
Project Location:
Leander,
TX
78641
Date: 03/2011
Bathtub: Replace or move existing bathtub
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Comment: take out fiberglass bathtub/ install tile shower