
Get matched with top wood paneling installers or repairers in Faribault, MN
Enter your zip and get matched with up to 3 pros
Matching on HomeAdvisor
Find Wood paneling installers or repairers in Faribault

UB Hardwoods LLC
UB Hardwoods LLC
UB Hardwoods is a complete flooring company established in 2001. Based in Golden Valley and Plymouth, Minnesota we work throughout the Minneapolis/St. Paul Metro and surrounding areas, including Minneapolis, Milwaukee, and Chicago using our special dustless equipment that doesn’t pollute your home. We have built an excellent reputation and have many references from customers that have experienced the quality of our work and our dustless system. We work 7 days a week to accommodate your schedule. Additional DBA - UB Hardwoods Installation.
"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."
Justin D on September 2022
UB Hardwoods is a complete flooring company established in 2001. Based in Golden Valley and Plymouth, Minnesota we work throughout the Minneapolis/St. Paul Metro and surrounding areas, including Minneapolis, Milwaukee, and Chicago using our special dustless equipment that doesn’t pollute your home. We have built an excellent reputation and have many references from customers that have experienced the quality of our work and our dustless system. We work 7 days a week to accommodate your schedule. Additional DBA - UB Hardwoods Installation.
"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."
Justin D on September 2022
Home Techniques, Inc.
Home Techniques, Inc.
Our company is staffed by an electrical engineer, two experienced IT professionals and experienced carpenters, cabinet makers and computer geeks. We use subcontractors on rare occasions when specific licensing is required, such as plumbing and commercial electrical.
Our company is staffed by an electrical engineer, two experienced IT professionals and experienced carpenters, cabinet makers and computer geeks. We use subcontractors on rare occasions when specific licensing is required, such as plumbing and commercial electrical.
ROBERTS' RESIDENTIAL REMODELING, INC
ROBERTS' RESIDENTIAL REMODELING, INC
10 EMPLOYEES. USES SUBS FOR ELECTRICAL, PLUMBING, MASONRY, & CONCRETE WORK. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. ADDITIONAL SERVICE AREAS: RICE & SIBLEY COUNTIES.
10 EMPLOYEES. USES SUBS FOR ELECTRICAL, PLUMBING, MASONRY, & CONCRETE WORK. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. ADDITIONAL SERVICE AREAS: RICE & SIBLEY COUNTIES.
STUMNE-ROVICK CONSTRUCTION
STUMNE-ROVICK CONSTRUCTION
5 EMPLOYEES. NO SUBS. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. NO SERVICE FEE. LICENSE #20511473 MAY CONTACT THROUGH EMAIL. ACCEPTS PAYMENT VIA PAYPAL.
5 EMPLOYEES. NO SUBS. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. NO SERVICE FEE. LICENSE #20511473 MAY CONTACT THROUGH EMAIL. ACCEPTS PAYMENT VIA PAYPAL.
Jewel Metal Restoration
Jewel Metal Restoration
Architectural Metal Restoration
Architectural Metal Restoration

Lofgren Construction LLC
Lofgren Construction LLC
We are a full service contractor that has over 20 years of construction experience. We offer free estimates and are very detailed oriented. We offer quality workmanship at an affordable price.
We are a full service contractor that has over 20 years of construction experience. We offer free estimates and are very detailed oriented. We offer quality workmanship at an affordable price.

Kendall Woodworks Inc
Kendall Woodworks Inc
Kendall Woodworks Inc., and Kenmill LLC exist to provide unsurpassed design, custom cabinetry, furniture and moldings that exemplify pride in craftsmanship and exceed expectations. It is our goal to bring into reality the dream that is yours.
"We hired Joel and his exceptional team to design the remodel of our kitchen and build our cabinets. They were very collaborative and patient with us as we continued to revise the plan until we found the design that worked best for us. We went from an enclosed 1990’s kitchen to an open concept with double islands. The cabinets well exceeded our expectations. They are stunning! Their attention to detail i in cabinet-making is first-class. The cabinet doors, drawer fronts and, trim are perfect. The custom-drawer inserts are spacious, clever and functioning. The whole team went above and beyond for us as we did our own contracting. They gave us lots of good advice and coaching along the way. We highly recommend them if you are looking for custom cabinets that are unique, functional and a work of arts"
Robin B on December 2023
Kendall Woodworks Inc., and Kenmill LLC exist to provide unsurpassed design, custom cabinetry, furniture and moldings that exemplify pride in craftsmanship and exceed expectations. It is our goal to bring into reality the dream that is yours.
"We hired Joel and his exceptional team to design the remodel of our kitchen and build our cabinets. They were very collaborative and patient with us as we continued to revise the plan until we found the design that worked best for us. We went from an enclosed 1990’s kitchen to an open concept with double islands. The cabinets well exceeded our expectations. They are stunning! Their attention to detail i in cabinet-making is first-class. The cabinet doors, drawer fronts and, trim are perfect. The custom-drawer inserts are spacious, clever and functioning. The whole team went above and beyond for us as we did our own contracting. They gave us lots of good advice and coaching along the way. We highly recommend them if you are looking for custom cabinets that are unique, functional and a work of arts"
Robin B on December 2023
Bannochie Builders Inc.
Bannochie Builders Inc.
Bannochie builders Inc we supply quality employees and sub contractors,work with home owner with designers and architects and planning.
"It went great. Complete tear down to the studs remodel. The build was done with care and along the way Gary made suggestions and that improved the overall outcome and didn't pick my pocket to do it."
Tom C on October 2018
Bannochie builders Inc we supply quality employees and sub contractors,work with home owner with designers and architects and planning.
"It went great. Complete tear down to the studs remodel. The build was done with care and along the way Gary made suggestions and that improved the overall outcome and didn't pick my pocket to do it."
Tom C on October 2018
David Heide Design Studio
David Heide Design Studio
David Heide Design Studio is a full-service architecture, interior design, and historic restoration firm.
David Heide Design Studio is a full-service architecture, interior design, and historic restoration firm.
The Faribault, MN homeowners’ guide to wood paneling installs or repairs
From average costs to expert advice, get all the answers you need to get your job done.

Budget for the cost of trim installation based on factors such as material, finishing, trim type, labor, project size, and more.

Estimate your budget with our guide to trim repair costs covering key factors like damage severity, trim varieties, material selection, and local labor rates.

If you plan to install new crown molding, you’ll need to budget based on the material, size of the room, and local labor rates.

Baseboards are both stylish and functional. If you’re ready to add them to your space, explore the cost to install baseboards and start budgeting here.

Learn what goes into framing a house, including key materials, methods, and tips to help you make informed decisions and build a strong foundation for your future home.

Use this guide to budget for the cost to replace deck railings based on factors such as railing material, labor, permits, and more.
- Carpentry Framing - Install
- Carpentry Framing - Repair
- Closet - Build
- Fireplace Mantel - Install
- Wood Stairs and Railings - Install or Replace
- Interior Trim and Decorative Moldings - Repair
- Interior Trim and Decorative Moldings - Install
- Wood Stairs and Railings - Repair
- Wainscoting - Install
- Exterior Shutters - Install or Replace
- Arbor, Pergola or Trellis - Build Custom
- Birmingham
- Phoenix
- Tucson
- Fresno
- Long Beach
- Los Angeles
- Modesto
- Sacramento
- San Diego
- San Francisco
- San Jose
- Denver
- Hartford
- Washington DC
- Fort Lauderdale
- Jacksonville
- Miami
- Orlando
- Tampa
- Atlanta
- Chicago
- Indianapolis
- Louisville
- New Orleans
- Baltimore
- Boston
- Detroit
- Grand Rapids
- Minneapolis
- Saint Paul
- Kansas City
- Saint Louis
- Las Vegas
- Albany
- New York
- Asheville
- Charlotte
- Greensboro
- Raleigh
- Winston Salem
- Cincinnati
- Cleveland
- Columbus
- Oklahoma City
- Portland
- Harrisburg
- Philadelphia
- Pittsburgh
- Providence
- Memphis
- Nashville
- Austin
- Dallas
- El Paso
- Fort Worth
- Houston
- San Antonio
- Salt Lake City
- Norfolk
- Richmond
- Virginia Beach
- Seattle
- Madison
- Milwaukee