Top-rated refrigerator installers or repairers.

Get matched with top refrigerator installers or repairers in Manhattan, IL

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Refrigerator installers or repairers in Manhattan

Harper Construction

No reviews yet

Harper Construction

No reviews yet

River West Construction

No reviews yet

River West Construction

No reviews yet
38 years of experience

My business career to date originated with River West Construction which is a family owned and operated business that started in 1987. Our business specializes in interior and exterior construction. During the length of my career, with River West Construction, I have built over 50 custom made homes and Commercial buildings including the following: Taco Bell, KFC, Qdoba (owned by Jack in the Box), Casey Muffler and Brake, Lime Light Night Club, and Badger Murphy. Recently, our family business has down sized as an owner operated construction business in order to efficiently meet the needs of our customers and provide them with the skills and expertise that we are equipped with, allowing us to handle any job. We are now able to focus on our customers' individual needs and meet those needs to our best abilities, providing high quality customer satisfaction. Through our owner operated business we can successfully take on home repairs, small jobs, or complete remodels. Upon transitioning to a smaller owner operated business, we are pleased to see a high turnover rate due to continued support and customer referrals.

My business career to date originated with River West Construction which is a family owned and operated business that started in 1987. Our business specializes in interior and exterior construction. During the length of my career, with River West Construction, I have built over 50 custom made homes and Commercial buildings including the following: Taco Bell, KFC, Qdoba (owned by Jack in the Box), Casey Muffler and Brake, Lime Light Night Club, and Badger Murphy. Recently, our family business has down sized as an owner operated construction business in order to efficiently meet the needs of our customers and provide them with the skills and expertise that we are equipped with, allowing us to handle any job. We are now able to focus on our customers' individual needs and meet those needs to our best abilities, providing high quality customer satisfaction. Through our owner operated business we can successfully take on home repairs, small jobs, or complete remodels. Upon transitioning to a smaller owner operated business, we are pleased to see a high turnover rate due to continued support and customer referrals.


Avatar for Geek Squad - Best Buy

Geek Squad - Best Buy

4.00(
2
)

Geek Squad - Best Buy

4.00(
2
)
Customers say: Super punctual
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Local Expert Geek Squad Agents can fix your Appliance or TV regardless of where purchased. 90-day warranty along with professional, quick, and clean services. Check us out online, by phone, or at over 1,100 Best Buy stores.

Local Expert Geek Squad Agents can fix your Appliance or TV regardless of where purchased. 90-day warranty along with professional, quick, and clean services. Check us out online, by phone, or at over 1,100 Best Buy stores.


Avatar for American Backflow & Fire Prevention, Inc.

American Backflow & Fire Prevention, Inc.

3.50(
2
)

American Backflow & Fire Prevention, Inc.

3.50(
2
)
Customers say: Quality work
76 years of experience

We are a small family owned operation, with 12 employees and have been in business since 1949. We strive to be the most reliable, and competitive service provider in the industry.

We are a small family owned operation, with 12 employees and have been in business since 1949. We strive to be the most reliable, and competitive service provider in the industry.


Eichele and Valene Remodeling

2.25(
4
)

Eichele and Valene Remodeling

2.25(
4
)
Customers say: Terrific value
13 years of experience

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019


Payne's Rehab & Repair

4.00(
2
)

Payne's Rehab & Repair

4.00(
2
)
Customers say: Terrific value
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Payments requested by Paypal, cash, or money order. 1/2 down balance upon completion. Employees on staff include plumbers, painters, electricians and roofers. Employees based on size of project. 5% off on jobs over $500.00

"The service provided was outstanding. I would definitely recommend to anyone who is need of repairs."

Jessica F on January 2021

Payments requested by Paypal, cash, or money order. 1/2 down balance upon completion. Employees on staff include plumbers, painters, electricians and roofers. Employees based on size of project. 5% off on jobs over $500.00

"The service provided was outstanding. I would definitely recommend to anyone who is need of repairs."

Jessica F on January 2021


Chicago Glass and Mirror

4.74(
38
)

Chicago Glass and Mirror

4.74(
38
)
Customers say: Quality work
Recommended by 92% of Angi customers
Recommended by 92% of HomeAdvisor customers

We are your one stop shop to all of your glass needs. We specialize in all interior glass applications. Everything from Shower Doors/Mirrors to custom glass backslashes. We are a family-owned and operated company of about 20 employees and have been in the industry for over 25 years. DBA BathWorks Design

We are your one stop shop to all of your glass needs. We specialize in all interior glass applications. Everything from Shower Doors/Mirrors to custom glass backslashes. We are a family-owned and operated company of about 20 employees and have been in the industry for over 25 years. DBA BathWorks Design


Samuel and Son Plumbing

No reviews yet

Samuel and Son Plumbing

No reviews yet
Free onsite estimate

Why Choose Us? We are: Insured, Certified, Licensed, 24/7 emergency service, Same-day service offered, 100% guaranteed work, Professional technicians, Environmentally conscious, Factory trained and authorized.

Why Choose Us? We are: Insured, Certified, Licensed, 24/7 emergency service, Same-day service offered, 100% guaranteed work, Professional technicians, Environmentally conscious, Factory trained and authorized.


d and b heating and air

No reviews yet

d and b heating and air

No reviews yet
Free onsite estimate

D & B HEATING & AIR Is focused on providing high-quality service and customer satisfaction - we will do everything we can to meet your expectations. EPA CERTIFIED with a variety of offers to choose from. We're sure you'll be happy working with us. We have no service call fee, if we don't fix it, we don't charge you!!! Look around our website and if you have any questions or comments, please feel free to contact us at: (224) 522-2690

D & B HEATING & AIR Is focused on providing high-quality service and customer satisfaction - we will do everything we can to meet your expectations. EPA CERTIFIED with a variety of offers to choose from. We're sure you'll be happy working with us. We have no service call fee, if we don't fix it, we don't charge you!!! Look around our website and if you have any questions or comments, please feel free to contact us at: (224) 522-2690


Mix Remodeling & Construction

No reviews yet

Mix Remodeling & Construction

No reviews yet
...
Showing 1-10 of 1001
FAQs for refrigerator install or repair projects in Manhattan, IL

Most fridges last 10 to 15 years on average, but careful owners can see 20 years—and sometimes even up to 27—before needing to replace them with a new model. Staying on top of professional tune-ups and everyday fridge maintenance ensures the compressor operates efficiently, protects food safety, and safeguards your investment.

As a general rule, stick with a repair if the quote comes in at 50% or less of a new unit’s price. Spending $100 to $300 on a repair keeps the fridge you already know running, extends its life, and costs far less than buying a brand new replacement.

When a control board starts to fail, you’ll begin to notice erratic temps, flashing error codes, dim displays, or controls that won’t respond. Plan on spending $80 to $800 for the fix—about $440 on average—and call a professional right away to get cooling back on track and prevent food from spoiling.

Give your fridge a quick once-over every few months: vacuum the coils, wipe the door gasket, and keep plenty of space for airflow. These small tasks prevent minor issues from escalating into costly breakdowns and help the appliance last longer. If anything seems off, schedule a pro visit sooner rather than later.

The Manhattan, IL homeowners’ guide to refrigerator installs or repairs

From average costs to expert advice, get all the answers you need to get your job done.