cba architecture & consulting LLC
cba architecture & consulting LLC
Architectural and Interior Design Services
Architectural and Interior Design Services

Architectural and Interior Design Services
Architectural and Interior Design Services
Payments requested by Paypal, cash, or money order. 1/2 down balance upon completion. Employees on staff include plumbers, painters, electricians and roofers. Employees based on size of project. 5% off on jobs over $500.00
"The service provided was outstanding. I would definitely recommend to anyone who is need of repairs."
Jessica F on January 2021
Payments requested by Paypal, cash, or money order. 1/2 down balance upon completion. Employees on staff include plumbers, painters, electricians and roofers. Employees based on size of project. 5% off on jobs over $500.00
"The service provided was outstanding. I would definitely recommend to anyone who is need of repairs."
Jessica F on January 2021
Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!
"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"
Tom M on February 2019
Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!
"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"
Tom M on February 2019

Techno Metal Post engineered helical pile foundation system is the solution you have been waiting for to implement on your next project! Eliminate excavation, the hassle and costs of concrete, and weather delays while increasing your construction efficiency. Most installations only require hours to install, you can start framing the same day. Techno Metal Post Helical Piles are ideal for solid and easy foundations for decks, additions, sheds, houses, docks, boardwalks, steel buildings, cabins, greenhouses and homes. Our piles are installed by certified installers and have a 25 year guarantee. Our engineering department is available for more complicated builds and can provide documents to make the permit process easier. Techno Metal Post Helical Piles install quickly and can be sized to support over 50,000 pounds per pile while minimally impacting the environment. Custom mounting/embedment solutions can be engineered by Techno Metal Post in-house to meet the requirements of any project!
Techno Metal Post engineered helical pile foundation system is the solution you have been waiting for to implement on your next project! Eliminate excavation, the hassle and costs of concrete, and weather delays while increasing your construction efficiency. Most installations only require hours to install, you can start framing the same day. Techno Metal Post Helical Piles are ideal for solid and easy foundations for decks, additions, sheds, houses, docks, boardwalks, steel buildings, cabins, greenhouses and homes. Our piles are installed by certified installers and have a 25 year guarantee. Our engineering department is available for more complicated builds and can provide documents to make the permit process easier. Techno Metal Post Helical Piles install quickly and can be sized to support over 50,000 pounds per pile while minimally impacting the environment. Custom mounting/embedment solutions can be engineered by Techno Metal Post in-house to meet the requirements of any project!

Affordable Services works with you through the entire project, from the initial idea to the finished result. We are a family owned and operated company that has relied on referrals from our satisfied customers for over 30 years. Give us a call if you need commercial and residential electrical, plumbing, heating & ac, carpentry, room additions, renovation services. We offer a 10% discount for Seniors & Veterans. Affordable Services accepts all major credit cards.
Affordable Services works with you through the entire project, from the initial idea to the finished result. We are a family owned and operated company that has relied on referrals from our satisfied customers for over 30 years. Give us a call if you need commercial and residential electrical, plumbing, heating & ac, carpentry, room additions, renovation services. We offer a 10% discount for Seniors & Veterans. Affordable Services accepts all major credit cards.
30-35 Employees, we accept Visa, MasterCard and Discover, Typically Net 30 on invoicing. For larger jobs, financing may be available
30-35 Employees, we accept Visa, MasterCard and Discover, Typically Net 30 on invoicing. For larger jobs, financing may be available
Complete remodeling services - no job too big or small - any area or aspect of your home. Now accepting credit card payments.
Complete remodeling services - no job too big or small - any area or aspect of your home. Now accepting credit card payments.

Green Acres Ironworks, Inc. based out of Merrillville, IN and providing service throughout Northwest IN and Chicago, specializes in creating custom ornamental iron stairs, railings, fences, gates, steel framed decks/porches, window guards, railing / stair / deck restoration, and custom fabrication. Erik Dworak, president of Green Acres, has a Construction Engineering and Management degree from Purdue University, and over 20 years’ experience working with structural steel and ornamental metals. Our services include, but are not limited to: • Metal Railings • Wrought Iron Railings • Existing Iron Railing Repair • Stairs • Gates • Fences • Steel Framed Decks • Roof Decks • Balconies • Steel Ladders • Window and Door Guards (security bars) • Custom Metal Furniture • Architectural Metal Work • Specialty Parts • Chicago Code Repairs / Replacement to Existing Structures • Metal Repair and Restoration • Design, Design Assist, Consulting • Fabrication in Steel, Iron, Stainless Steel, Brass, and Copper At Green Acres Ironworks, Inc. we will work with you from conception to completion to insure that your project is finished with your design and style in mind. Most projects are entirely unique so call Green Acres Ironworks, Inc. today to discuss your project!
Green Acres Ironworks, Inc. based out of Merrillville, IN and providing service throughout Northwest IN and Chicago, specializes in creating custom ornamental iron stairs, railings, fences, gates, steel framed decks/porches, window guards, railing / stair / deck restoration, and custom fabrication. Erik Dworak, president of Green Acres, has a Construction Engineering and Management degree from Purdue University, and over 20 years’ experience working with structural steel and ornamental metals. Our services include, but are not limited to: • Metal Railings • Wrought Iron Railings • Existing Iron Railing Repair • Stairs • Gates • Fences • Steel Framed Decks • Roof Decks • Balconies • Steel Ladders • Window and Door Guards (security bars) • Custom Metal Furniture • Architectural Metal Work • Specialty Parts • Chicago Code Repairs / Replacement to Existing Structures • Metal Repair and Restoration • Design, Design Assist, Consulting • Fabrication in Steel, Iron, Stainless Steel, Brass, and Copper At Green Acres Ironworks, Inc. we will work with you from conception to completion to insure that your project is finished with your design and style in mind. Most projects are entirely unique so call Green Acres Ironworks, Inc. today to discuss your project!

Additional DBA - ZSC Insurance Restoration Services LLC. Additional contact name - Anna Oles.
Additional DBA - ZSC Insurance Restoration Services LLC. Additional contact name - Anna Oles.
Small family owned painting bus. dedicated to quality work at a affordable price. No Subs. Free Est. Cost determined by job. Deal direct with owner. No job to small
Small family owned painting bus. dedicated to quality work at a affordable price. No Subs. Free Est. Cost determined by job. Deal direct with owner. No job to small
From average costs to expert advice, get all the answers you need to get your job done.

Composite fencing costs range depending on the fence height and length, materials, and location. Difficult terrain can increase fencing costs as well as additional features like gates.

Find out who to hire to replace porch columns, when to call carpenters or masons, what it costs, and how pros get it done.

Learn how to find and hire the right deck carpenter or contractor for your next project with our hiring guide!

Wondering who builds decks? Learn which deck contractors to hire, other pro options, and costs so you can plan and hire with confidence.

Learn how much it costs to seal a deck, exploring factors like its size, materials, sealant type, prep work required, and local labor rates.

Learn the top factors that affect Ipe decking costs, including the material brand, project size, labor rates, add-ons, and permit fees.