Top-rated interlocking pavers for patios, walks & steps installers.

Get matched with top interlocking pavers for patios, walks & steps installers in San Leandro, CA

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Interlocking pavers for patios, walks & steps installers in San Leandro

Avatar for Kerri Landscape Services
Kerri Landscape Services
4.8(
45
)

Serving San Leandro, CA and surrounding areas

In business since 1994

Free estimates

Credit card accepted

"Rich and his crew were fantastic. They went above and beyond in many areas, and were always terrific with communication about all of the aspects of the project. They fully landscaped our front yard, including abundant lighting, and replaced the sprinkler system throughout the property. They were a pleasure to work with and the end product is the envy of the neighborhood."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by95%of homeowners
Avatar for Green Bay Remodeling Inc
Green Bay Remodeling Inc
4.8(
70
)

Serving San Leandro, CA and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"Bathroom Remodel – Disappointed I am very disappointed with the performance of Green Bay Remodeling (GB) on my bathroom remodel. Fundamentally the problems were: poor workmanship, blatant errors, lack of attention to detail by work supervisors and project management, and an inability to recognize problems and/or report them to me in a timely manner. Some examples are described below. This impacted schedule, cost (for GB, not me), the end product, and my overall mental health. There was a continuing pattern of doing poor quality work, assuming it was okay, and then fixing it when I complained. Mistakes (tile, grout, grab bar, temperature limit stop damage, cleanliness, etc.) were never admitted, and apparently it was hoped I did not notice them. This reduced my confidence in GB as the job progressed. The estimate to complete was 3-4 weeks but ended up 11 weeks. A major issue on this project was that I had a poor work crew that was replaced after 5 ½ weeks. But there are, in my opinion, as you will see, other underlying issues that compounded problems and created problems of their own. Based on my experience, the problem Is not just one worker, or a single crew, or a single manager, but more systemic in nature. Green Bay: I like their business model. You sign a contract and they commit to price before they see the complete design. I purchased and designed almost everything independently and GB installed it. They do have a large showroom from which you can purchase. They were no price-related issues throughout the contract. No hassle, no back and forth, etc. Plus you get a 1-year labor warranty for returning the completion survey! After receiving the initial contract to sign I nearly quit and went elsewhere. This was because the contract was a nine-page “pilot” which was poorly written, with many typos, really not an enforceable document. It even had language that contradicted our initial discussions, in my favor. Scary. I spoke with one of their current clients and requested the same format, 2-page contract, and I was satisfied with it. Some of the reasons for the delays were: - Workers did not show up for entire days or only worked a couple hours a day - Did not pass two city inspections, had to redo and await a total of two days for the inspectors to revisit - Two holiday weekends - The crew was changed after 5 ½ weeks, long after the problems starting occurring. - It took 3 days for a new crew to come on board. It was then I learned I learned of critical issues with the first crew’s work. The workers apparently made mistakes early on, 3 weeks into the project, and the project manager (PM) either did not recognize them or did not identify them to me until after the new crew came on board some 3 weeks later. The mistakes were with the shower floor and surrounding tile. I did have questions about peaks and valleys in the floor, but these were dismissed. The concrete shower pan and tile had to be removed and redone, ordering extra tiles at a premium with express delivery. - Damage to the temperature limit stop of the shower mixing valve during an unsuccessful attempt to diagnose a problem created by the installers. I needed to order a new part which took nearly a week to arrive. At times, PM seemed inexperienced, over-confident, and not very knowledgeable about construction practices. I attribute some problems to being accustomed to doing things a particular way, but also to a lack of construction knowledge/experience. Your only interface is with the PM so it is important for them to be knowledgeable about the construction details of the project. Recessed lighting is provided free by the contractor and I was told not to worry even though I complained that the selected lights were not appropriate. My bathroom is open to the bedroom. It has an 11 ft+ sloped ceiling. The proposed lights were wide angle (they would illuminate the high ceiling and not the room below) and also they did not gimbal, so because of the sloped ceiling they ended up pointing to the bedroom not the bathroom below. I identified gimballed, narrow-beam lights, that were indeed news to the PM, that were more appropriate, and we used these. The first crew ran out of tile, even though I ordered 6% more than the 10% overage that was initially requested, and they had to use scraps for what they thought was finishing up the wall tile work. I complained about how the shower tile was chipped around the shampoo niche and the window and was told that was the best they could do. Maybe it’s the best anyone can do, but it does look sloppy. Ultimately, I identified some wall pencils to cover the chipped areas around just the window, which they installed and it looked ok in the end. I requested that my grab bar be positioned 34 inches above the finished floor. The posted design drawings and associated text on the submission to the City reflected this. But after all the tile was installed I find out from the construction progress photos that the stud that was installed behind the shower wall tile was installed too low to meet this requirement. Granted, only an inch but I am old and tall and it makes a difference. Too bad, this was such a simple thing and there was plenty of time to correct it before the wall tile was installed. Another detail missed. I specified the best possible one-coat paint and Green Bay paid for it. The initial paint job was so poor (bare areas, light painted over) that I requested a second coat, for which I purchased the paint for both trim and walls. Vinyl plank flooring is generally laid in a random staggered pattern. This is recommended by the manufacturer and included in the installation instructions. When questioned the PM seemed to have no understanding of this. This is just something of which you should be aware if GB installs floors for you. There were problems with the shower mixing valve. Plumbing personnel spent 6 hours trying to diagnose and fix the problem without success. It was reassembled in an odd manner, not looking like the manufacturer’s website. I was told that they would come by the next day to open up the wall behind the valve to check it out. No one looked at the installation instructions and no one called the manufacturer. But I did. The manufacturer told me it was likely only a cartridge issue and gave me things for them to check. A different plumber came in the next day and sure enough got it working halfway decent in an hour, basically using the manufacturer’s guidance. He told me, and showed me, that the temperature limit stop had been damaged at some point during the installations. I ordered a new part to replace the one they damaged. More plumbing poor workmanship. Of the two faucets installed, there was one leaking drain and one leaking trap. They do a poor job with grout. I could not get the color grout I wanted because I was asked the day before it was needed and it was not available. In the end, color choice actually did not matter because the finished, sealed, grout was, tile-to-tile, a variety of colors, a variety of textures, and maybe 10% of it close to resembling my chosen color. Again, disappointing, considering that my 1989 house has 100 feet of gray tile grout that is all the same color. Ask for color seal for your grout to assure consistency of color. They used color seal of my requested grout color and it turned out fine. They did a very poor job of maintaining cleanliness: My bathroom has bottom and top openings opposite the bedroom where I slept for the project duration. The bottom was covered and zippered but not the top during the demolition and dry wall work. Dust was everywhere. When I complained, the PM pointed to the top open area and said that’s where the dust came from. No further attempt was made to cover this area for several days. I became so disappointed that got a plastic tarp and covered it myself. Even after this, every night, after the days on which they worked, my routine was to sweep out and vacuum the bedroom. In my yard, I complained multiple times about the same cleanliness issues but the same things kept happening. It was like repeatedly having to ask your child to make their bed"
Additional Photos
Bathroom Shower
Bathroom Shower
Bathroom Design
Before Our Work

+3

Recommended by94%of homeowners
Avatar for System Pavers
System Pavers
4.7(
190
)

Serving San Leandro, CA and surrounding areas

In business since 1992

Free estimates

"System Pavers is HIGHLY motivated and well optimized to make the sale – but they WILL NOT stand behind their “system.” If/when problems develop (even due to their own failures), you are on your own. After a very high-pressure sales pitch (disguised as a “design meeting”) with all the accoutrements (fancy PowerPoint demonstration, a copy of their very large surety bond, commitments that they will stand behind us, and a “discount” that magically expired the same day), System Pavers completed our $72k backyard paver project in September 2021. Over the next few weeks, the pavers began to separate, sag, and “crown.” Also, the drainage in many areas was toward the house, not away from it. They did come back a couple of times to remove pavers, recompact, and reset. However, when failures continued, they asked us to let the system fail for another year so they would only have to do a major rehabilitation once. When that year elapsed, they were nowhere to be found. Very difficult to get them to come back out. Then, instead of fixing the failed system, they had a soils engineer evaluate. The engineer’s report confirmed they did not properly prepare the subgrade. They recently sent an email essentially saying they didn’t want to keep spending money on their failed system. They also claimed the warrantee would not cover the repairs. They are simply walking away, leaving us with an unsafe, embarrassing backyard and a worthless major investment. What a joke. PLEASE DO NOT DO BUSINESS WITH THIS COMPANY."
An Outdoor Living Dream Come True
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+74

Recommended by90%of homeowners
Avatar for Hansen Landscape Contractor
Hansen Landscape Contractor
4.8(
68
)

Serving San Leandro, CA and surrounding areas

In business since 1978

Warranties offered

"Contacted Hansen Landscaping to do our front yard. We met with Steve and shared our design thoughts. Steve presented us with a drawing based on what we were looking for. A drawing is one thing but the finished project is another. We never in our wildest dreams could have imagined how beautiful our yard looks now. To us a simple design of a dry creek, artificial lawn and some plants was what we had in mind. Steve's design took our plan to a much higher level. The dry creek is a show stopper. The team sent to do the work were awesome. It took them 6 business days to complete. They were at our home on time every morning and made sure everything was cleaned up before they left at the end of the day. Any questions or concerns I had were always listened to and addressed. Steve Hansen made everything work seamlessly from first meeting him at his showroom to laying out the timeline to working with Jack on selecting the right plants and then sending us Hugo, Raoul and Martin who worked so hard and made me laugh everyday. We couldn't be happier and choosing Hansen was the BEST DECISION EVER!!"
Recommended by92%of homeowners
...
Showing 1-10 of 235
FAQs for interlocking pavers for patios, walks & steps installation projects in San Leandro, CA

To calculate your paver needs:

  • Determine how many pavers cover a square foot.

  • Determine how many square feet you need.

  • Add an additional 10% to 20% for breakage and waste.

  • Consider your pavers’ sizes.

Or, you can hire a local pro who you know will get the right measurements the first time. This way, you get your weekend back instead of spending it measuring square footage.

A pallet of pavers costs $300 to $700 on average, and each pallet covers 56 square feet. The exact price depends on the type, size, and quantity of pavers you choose. Buying in bulk can sometimes offer additional savings, especially for larger projects. Ask your pro how you can save on material costs.

To get the best prices on pavers:

  • Hire a professional landscaper: Pros often receive discounts on materials, which can make hiring them more cost-effective overall.

  • Shop at local building supply stores: Check for overstock or bulk purchase deals. Bulk purchasing can be more costly up front but save you money in the long run. 

  • Buy directly from manufacturers: Purchasing from a local brickyard or paver factory can offer competitive prices, especially for large quantities.

The main difference between driveway pavers and patio pavers is their load-bearing capacity. Driveway pavers are designed to withstand the weight of vehicles, whereas patio pavers aren’t suitable for such heavy loads. You can use driveway pavers for a patio, but using patio pavers for a driveway could lead to damage. Always check the weight limits of pavers and consult with a professional installer to choose the right type for your project.

Paver patios cost more than concrete patios because the materials and installation methods require advanced techniques and skilled labor. They deliver enhanced aesthetic appeal and allow for easier small‑scale repairs without affecting property taxes. The higher expense arises from premium paver materials and intricate installation processes that deliver long‑lasting durability and design flexibility. This robust solution provides notable benefits over concrete alternatives, making it a valuable investment for homeowners.

The San Leandro, CA homeowners’ guide to interlocking pavers for patios, walks & steps installations

From average costs to expert advice, get all the answers you need to get your job done.