The JP Sheehan Construction L.L.C. family offers Fast, Cost effective solutions. We do what we are supposed to do when we say we are going to do it. Patrick Sheehan believes in solid Engineering when needed, backed by solid planning to control budgets. Patrick Sheehan is backed by a Structural Engineer, Architect(Brother), Designer as well as Drafting when needed. We plan it on paper, and then everyone knows what is to be expected. This is where we ensure no surprises, for we will build it on paper till we are clear on what is to be accomplished. Patrick meets all clients personally, and oversees all tasks, operations and paperwork personally. We can take what you are wanting to see happen, and make it happen. Where we excel is we listen carefully, and present options and examples. We ensure you are in control. What to expect is open descriptive Bids, backed by References you can talk to. We have one goal, exceed the client expectation.
"Job is not complete yet. So far everything is going great. They explain everything they are doing and ask if we have questions along the way."
undefined on June 2025
The JP Sheehan Construction L.L.C. family offers Fast, Cost effective solutions. We do what we are supposed to do when we say we are going to do it. Patrick Sheehan believes in solid Engineering when needed, backed by solid planning to control budgets. Patrick Sheehan is backed by a Structural Engineer, Architect(Brother), Designer as well as Drafting when needed. We plan it on paper, and then everyone knows what is to be expected. This is where we ensure no surprises, for we will build it on paper till we are clear on what is to be accomplished. Patrick meets all clients personally, and oversees all tasks, operations and paperwork personally. We can take what you are wanting to see happen, and make it happen. Where we excel is we listen carefully, and present options and examples. We ensure you are in control. What to expect is open descriptive Bids, backed by References you can talk to. We have one goal, exceed the client expectation.
"Job is not complete yet. So far everything is going great. They explain everything they are doing and ask if we have questions along the way."
undefined on June 2025
A professional kitchen demolition takes an average of eight hours (one working day) for standard projects. More complex jobs involving structural changes might require up to two days.
Factors that extend the timeline include discovering hidden damage, encountering hazardous materials, or removing load-bearing elements. DIY demolitions take considerably longer, often several days to a week, due to learning curves and limited equipment access.
Salvaging kitchen materials can be worthwhile if the components are in good condition. Cabinets, appliances, fixtures, and certain flooring types can be donated to organizations like Habitat for Humanity or sold through online marketplaces.
This approach reduces landfill waste and may provide tax benefits or offset some demolition costs. However, careful removal takes more time, so weigh potential returns against the additional labor involved.
On demolition day, expect noise, dust, and temporary utility disruptions. Crews will systematically remove fixtures, cabinets, appliances, and targeted surfaces. Protective coverings should be installed to prevent dust from spreading to other areas.
The space will be unusable during this process, so plan alternative arrangements for food preparation. By completion, all designated elements will be removed and debris cleared, leaving a blank canvas for your renovation.
Removing load-bearing walls without professional assistance is extremely risky and not recommended. These walls support critical structural weight, and improper removal can cause ceiling sagging, floor damage, or even catastrophic collapse.
Professional projects require structural engineer assessment, proper temporary supports, permanent beam installation, and building permits. The safety risks and potential for expensive structural damage far outweigh any cost savings from DIY approaches.