
Moores Construction LLC
Moores Construction LLC
We offer concrete pouring installation for driveways, slabs, sidewalks etc and stamped/decorative services.
"The work started with an advance of $2000 on day 1 and removed the existing driveway. Day 2. started framing the area and in the afternoon, the contractor told that area is more than the actual measured area, I told that you measured and he argued that I increased the area what earlier not told, which was not true. He agreed in the contract that he will cover the additional area of the walkway up to the main door within $9000. After that, he added the additional area with 1500 sqft (Please see his contract). He demanded additional money for the area, which was included in the contract. Further, he brought mesh, which was very thin for the driveway. I told him it should be 1/2 inch thick mesh, and it is not acceptable. Then he asked additional amount. For the mesh. I said I will not pay; you need to do the work as per the contract. He asked for the second payment on day 2 and said he would come back when the bank check was cashed. I gave $2000 more."
Anil M on August 2025
We offer concrete pouring installation for driveways, slabs, sidewalks etc and stamped/decorative services.
"The work started with an advance of $2000 on day 1 and removed the existing driveway. Day 2. started framing the area and in the afternoon, the contractor told that area is more than the actual measured area, I told that you measured and he argued that I increased the area what earlier not told, which was not true. He agreed in the contract that he will cover the additional area of the walkway up to the main door within $9000. After that, he added the additional area with 1500 sqft (Please see his contract). He demanded additional money for the area, which was included in the contract. Further, he brought mesh, which was very thin for the driveway. I told him it should be 1/2 inch thick mesh, and it is not acceptable. Then he asked additional amount. For the mesh. I said I will not pay; you need to do the work as per the contract. He asked for the second payment on day 2 and said he would come back when the bank check was cashed. I gave $2000 more."
Anil M on August 2025