Top-rated post construction clean up pros.

Get matched with top post construction clean up pros in Holbrook, NY

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Post construction clean up pros in Holbrook

Avatar for Number One Maid Service
Number One Maid Service
5.00(
8
)

Angi Approved

Customers say: Quick response

"I have Laura and her team scheduled for once a week to clean my house. They are kind, trustworthy, and my house is always so clean. I highly recommend Number 1 Maid Service!"
1 neighbors recently requested a quote
Recommended by100%of homeowners
All Star Cleaning Services, Inc.
4.84(
54
)

Angi Approved

In business since 2003

Free estimates

Customers say: True professional

"This was the first time I have ever hired a professional to clean our home. They went above and beyond! They cleaned so well my house is spotless! I’m going to definitely be calling them back again. I would recommend them to anyone, you will be happy with the quality of their work. We have 3 dogs and a cat so you can just imagine how dusty my house can get lol"
Recommended by72%of homeowners
Avatar for Diamond Cleaning LLC
Diamond Cleaning LLC
4.86(
7
)

Angi Approved

In business since 2020

Free estimates

Warranties offered

"Diana and her crew were like a school of piranhas (in a goodway) attacking the job and making quick and efficient work of it. It was a big job done very well for a very fair price. We will use them again."
Recommended by14%of homeowners
...
Showing 1-10 of 1022
FAQs for post construction clean up projects in Holbrook, NY

Plan on one hour of cleaning for every 100 to 200 square feet. That means a two-to-four-person crew will spend eight to 12 hours on a full-size home. 

Your pro will walk the space first, size it up, and give you a more precise timeline to be sure every lofty ceiling, baseboard, and tight corner gets the same white-glove attention.

Cleaning fine dust after construction requires a combined approach of detailed dusting and high‐powered vacuuming. Begin by wiping high surfaces such as ceiling fans, walls, window sills, and countertops to eliminate deposited particles. Next, vacuum all floors, carpets, and hard surfaces and mop afterward to remove residual dust. Finally, clean HVAC returns, supply vents, and replace filters to ensure a completely dust‐free environment.

You’ll need safety gear and heavy-duty tools. At minimum, you should wear a respirator, eye protection, and work gloves. Then, bring in a HEPA-filter shop vac, wet mops, microfiber cloths, and a carpet shampooer to lift dust from every surface. 

Pros also keep extra filters and trash bags on hand so they can swap them out mid-job and keep the cleanup running smoothly from start to finish.

Book your post-construction cleanup for one to two days after the last tool leaves the site. That 24- to 48-hour buffer lets dust settle so the crew can snag every speck in one visit. 

Touch base with your contractor before you lock in a date; if their punch-list slips, you’ll want to shift the cleaning slot to avoid costly rescheduling and make sure the house is truly move-in ready.

The Holbrook, NY homeowners’ guide to post construction clean ups

From average costs to expert advice, get all the answers you need to get your job done.