
Serving Lavonia, GA and surrounding areas
In business since 1958
Free estimates
Credit card accepted
"We discovered a plumbing leak and the crawl space was flooded. This had obviously been leaking for an unknown period of time due to the plumbing problem. We never had water in the crawl space before. We noticed suspicious mold substance in the rafters and knew we needed to act quickly. We contacted 58 Foundations to evaluate and quote to correct/repair all issues. They inspected and confirmed they could help and that we did have Mold and developed a price quote for the repairs and perform Mold Remediation Services. We signed the contract to move forward asap. They scheduled the work to begin in the next few days. The original contract we signed, detailed the work that needed to be done for a total contract price of $22,011.00. We were notified the afternoon before the work was to begin that they failed to include $4,694.50 in their price breakdown and sent us a revision of $26,564.57. Mold Remediation: We were told a professional crew was to perform the remediation services with proper equipment and protection. Instead, the crew there doing all the other work did it and used no protective clothing, masks, gloves or equipment. They had rags, chemicals and spray bottles. I asked about the Mold crew that was supposed to do this and he said they were not available so his crew did the work. Numerous areas were left undone and when I pointed those areas out, they went back in to treat the areas. Installed a steel stabilizer to replace a wooden support. After installation, the front door had gaps and was sticking and is still sticking. Many other mistakes were made during the work, that I had to bring to their attention to correct/complete. At no time has management shown interest during and after completion of the job and to this date. Upon completion, the tech asked for the check for balance due. We had written it for the balance due of $22,026.022 and he said it was too much that it was only $17,472.65. It took 4 phone conversations with his office to determine the exact balance of the contract Our original contract was $22,011.00 – their revised contract was $26,564.57. At the time of final payment their total was still off by $100.00."





+16


































