"The job required two full days. The plan was to first tear off the existing roof, second to install a new deck, third to install the new shingle roof, and finally to remove any remaining debris and inspect the job for any final touch ups. The tear off started when the workers laid large tarps around the perimeter of the house to contain the debris from the shingle and cedar shake tear off. Even before the tear off was complete, a second crew started installing the deck. Both the tear off and deck installation was completed in the first day. During this deck installation, 70 feet of decayed fascia board was replaced and painted. The shingle installation was completed on the second day. After the roof was installed, each worker used a magnet and plastic bag to collect debris and nails. I have yet to find a nail after the workers left."