Serving Pinetta, FL and surrounding areas
In business since 1971
Free estimates
"From the first phonecall, they had the concrete poured and hardened within 1.5 weeks. It only took them 1 day to dig and make the frame and 1 day to pour. I got concrete patio poured slightly less than 400sq ft, which was about 7 yards of concrete. They had to do everything by hand and wheelbarrow since I had a small gate for them to work through to the backyard so it cost a little more than they usually charge. In the end, including the termite spraying required in Georgia, we paid $3750 to New Leaf and $80 to the termite people."