
Austad Construction, Inc.
Austad Construction, Inc.
Austad Construction Inc provides metal roofing, asphalt roofing, residential roofing, flat roofs, commercial roofing, roof tear-offs, reroofing, and roof repairs, and FREE estimates
"First Dave took days to respond, then roofing was delivered to the neighbors. Roofing was delayed, and i was notified the first day. The 2nd day i heard nothing from Steve and had to call to find out. I was told the driveway would be covered with tarps and magnets would be used to pick up nails. This wasn't done and i had to pick up 100's of nails myself from driveway and all around the house and neighbors house. Front and back steps weren't covered with tarps while roofing, so one had oil stains, the other brand new composite steps had gouges, tar stains, and a broken light. Corner piece of my siding had a hole put in it. My birdbath was also broken. Roofers left garbage all over the place. A few nails and little pieces of roofing were left on the roof after they were done. The office called before the job was completed to get final papers signed, i had to tell them they aren't done yet. Long delays and poor communication, a roofing job with soffit and fascia took about a month total. Corner siding piece was finally replaced, and a couple hundred dollars was taken off the price for the broken items."
jaymey j on October 2021
Austad Construction Inc provides metal roofing, asphalt roofing, residential roofing, flat roofs, commercial roofing, roof tear-offs, reroofing, and roof repairs, and FREE estimates
"First Dave took days to respond, then roofing was delivered to the neighbors. Roofing was delayed, and i was notified the first day. The 2nd day i heard nothing from Steve and had to call to find out. I was told the driveway would be covered with tarps and magnets would be used to pick up nails. This wasn't done and i had to pick up 100's of nails myself from driveway and all around the house and neighbors house. Front and back steps weren't covered with tarps while roofing, so one had oil stains, the other brand new composite steps had gouges, tar stains, and a broken light. Corner piece of my siding had a hole put in it. My birdbath was also broken. Roofers left garbage all over the place. A few nails and little pieces of roofing were left on the roof after they were done. The office called before the job was completed to get final papers signed, i had to tell them they aren't done yet. Long delays and poor communication, a roofing job with soffit and fascia took about a month total. Corner siding piece was finally replaced, and a couple hundred dollars was taken off the price for the broken items."
jaymey j on October 2021