Top-rated deck staining or painters.

Get matched with top deck staining or painters in Vernon Hills, IL

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Deck staining or painters in Vernon Hills

R.L.G. Building & Remodeling

No reviews yet

R.L.G. Building & Remodeling

No reviews yet
26 years of experience

I built my company by supplying my customers with HIGH QUALITY WORKMANSHIP for a fair price. I have been in business since 1999 and am offering a 5% discount on all labor for new home improvement or repair projects. I will also cover your deductible on ALL insurance claims.

I built my company by supplying my customers with HIGH QUALITY WORKMANSHIP for a fair price. I have been in business since 1999 and am offering a 5% discount on all labor for new home improvement or repair projects. I will also cover your deductible on ALL insurance claims.


Avatar for Concrete Crawlspaces & Basement Waterproofing Corp

Concrete Crawlspaces & Basement Waterproofing Corp

4.75(
154
)

Concrete Crawlspaces & Basement Waterproofing Corp

4.75(
154
)
Customers say: Super punctual
Recommended by 92% of Angi customers
Recommended by 92% of HomeAdvisor customers

Licensed Plumbing Contractor - SafeSeal by Concrete Crawlspaces & Basement Waterproofing. Crawlspace Encapsulation, Sewer Backup Prevention, Modified Overhead Sewers, Basement Floor Replacement, Underpinning, Foundation Crack Repair, Carbon Fiber Wall Straps, Wall Anchors, Spray Foam Insulation, Discounts for Angie's List Members. Financing available. Award winning.

"Steve Gavin, the owner came out and provided me with a great price that was inclusive of the entire scope of the project. During our meeting he took the time to explain the process that his company uses. Once the permits were issued the crew arrived the next morning at 7:00 a.m. as promised. The crew met the deadline for a 1:30 inspection from the Village of Deerfield. They not only met the deadline but they passed the inspection without any issues to be corrected. The crew worked until 7:00 p.m. completing the job. I would also note that they left my home spotless!"

Richard R on September 2019

Licensed Plumbing Contractor - SafeSeal by Concrete Crawlspaces & Basement Waterproofing. Crawlspace Encapsulation, Sewer Backup Prevention, Modified Overhead Sewers, Basement Floor Replacement, Underpinning, Foundation Crack Repair, Carbon Fiber Wall Straps, Wall Anchors, Spray Foam Insulation, Discounts for Angie's List Members. Financing available. Award winning.

"Steve Gavin, the owner came out and provided me with a great price that was inclusive of the entire scope of the project. During our meeting he took the time to explain the process that his company uses. Once the permits were issued the crew arrived the next morning at 7:00 a.m. as promised. The crew met the deadline for a 1:30 inspection from the Village of Deerfield. They not only met the deadline but they passed the inspection without any issues to be corrected. The crew worked until 7:00 p.m. completing the job. I would also note that they left my home spotless!"

Richard R on September 2019


First Choice Remodeling

No reviews yet

First Choice Remodeling

No reviews yet
35 years of experience

Full service remodeling service that also offers handyman services as well. No project is too small for us. We specialize in decks, garages, porches, basement finishing, kitchen renovations, bathroom remodels.

Full service remodeling service that also offers handyman services as well. No project is too small for us. We specialize in decks, garages, porches, basement finishing, kitchen renovations, bathroom remodels.


Avatar for L&S  maintenance

L&S maintenance

No reviews yet

L&S maintenance

No reviews yet
21 years of experience

Do you have property that you can not attend to? We can get the job done . We specialize in give are customers high maintenance. We welcome residential and commercial. Please contact use for more information . lloydsmith21@yahoo.com. Thank you .

Do you have property that you can not attend to? We can get the job done . We specialize in give are customers high maintenance. We welcome residential and commercial. Please contact use for more information . lloydsmith21@yahoo.com. Thank you .


Ozark Group

No reviews yet

Ozark Group

No reviews yet
35 years of experience

Ozark Group is a 4 man service company located in Elgin Illinois serving the residential, retail, & construction industries. We focus on interior and exterior painting & remodeling. We also provide labor for custom installations & handyman services. We install fencing, kitchen cabinetry, office furniture, signage, light fixtures, and custom displays.

Ozark Group is a 4 man service company located in Elgin Illinois serving the residential, retail, & construction industries. We focus on interior and exterior painting & remodeling. We also provide labor for custom installations & handyman services. We install fencing, kitchen cabinetry, office furniture, signage, light fixtures, and custom displays.


DETAIL KITCHENS

5.00(
24
)

DETAIL KITCHENS

5.00(
24
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Detail Kitchens provides design and installation expertise that stems from our 44 years of experience. Whether you're remodeling your kitchen or building a new home, we will work together to transform your dreams into a kitchen that's not only beautiful but completely functional, efficient, and appropriate for your lifestyle. 6 employees. Uses Subs for Electrical & Plumbing. Cost is determined by the job. No travel charges.

Detail Kitchens provides design and installation expertise that stems from our 44 years of experience. Whether you're remodeling your kitchen or building a new home, we will work together to transform your dreams into a kitchen that's not only beautiful but completely functional, efficient, and appropriate for your lifestyle. 6 employees. Uses Subs for Electrical & Plumbing. Cost is determined by the job. No travel charges.


T.P.F. Construction Inc

No reviews yet

T.P.F. Construction Inc

No reviews yet
17 years of experience

TPF Construction Inc. is a family owned business. We specialize in Kitchen and Bathroom remodeling. Our company offers a wide variety of services. Customer satification is our priority. We offer free estimates on all our services and all our work is on time,warranted for one year. We are bonded and insured.

TPF Construction Inc. is a family owned business. We specialize in Kitchen and Bathroom remodeling. Our company offers a wide variety of services. Customer satification is our priority. We offer free estimates on all our services and all our work is on time,warranted for one year. We are bonded and insured.


ROOM REMEDY

5.00(
6
)

ROOM REMEDY

5.00(
6
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We're a small painting company specializing in detailed repair and trim work. Excellent drywall repair and finishing work. Crown molding and chair rail installers as well.

We're a small painting company specializing in detailed repair and trim work. Excellent drywall repair and finishing work. Crown molding and chair rail installers as well.


Eichele and Valene Remodeling

2.25(
4
)

Eichele and Valene Remodeling

2.25(
4
)
Customers say: Terrific value
13 years of experience

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019


Ralph's Roofing & General Remodeling

No reviews yet

Ralph's Roofing & General Remodeling

No reviews yet
40 years of experience

Experienced roofer and general remodeler in the Chicagoland area for 30+ years with 100% customer satisfaction. We focus on providing the most cost effective and efficient service for all your needs. Able to customize repair plans, timelines and team numbers based on individual jobs. From rooftop to basement and everything in between!

Experienced roofer and general remodeler in the Chicagoland area for 30+ years with 100% customer satisfaction. We focus on providing the most cost effective and efficient service for all your needs. Able to customize repair plans, timelines and team numbers based on individual jobs. From rooftop to basement and everything in between!

...
Showing 1-10 of 1000
FAQs for deck staining or painting projects in Vernon Hills, IL

When you paint your deck, you can choose any color, and cleanup is easy, but the paint hides the natural wood grain. Stain, on the other hand, lets the wood grain shine through, but requires more maintenance. The cost to seal a deck is about the same as painting. Consider your personal preferences to see which option benefits you most.

For bare wood or cement decks, you only need to clean the surface before applying the first coat of paint. If you're recoating an existing finish, you'll need to pressure wash the deck to remove chipped paint and debris. Either way, make sure to allow the surface to fully dry before moving forward; otherwise, the finish could peel.

A gallon of paint covers between 125 and 300 square feet, depending on its formula. Since your deck might need two coats of paint, for a standard 300-square-foot deck, you might need two to four gallons. If you're painting a pool deck, keep in mind that the specialized non-slip paint covers less area because the texturized material takes up more space in the can.

Yes, you can paint directly over old deck paint if the existing finish is in excellent condition. You should inspect the surface to ensure there's no cracking, peeling, or chipping before proceeding. If you notice any deterioration, you'll need to remove the compromised paint. Clean your deck thoroughly with a power washer, lightly sand any rough spots, and use the same type of paint to guarantee proper adhesion and long-lasting performance.

Yes, applying a coat of primer before painting your deck is essential unless you're using a combined 2-in-1 formula. Primer enhances the adhesion of the new paint, establishes a moisture barrier, and creates a smooth, uniform surface. Be sure to inspect your deck for any defects or old finishes, and use a high-quality primer to fully prepare the surface for a durable and pristine finish.

The Vernon Hills, IL homeowners’ guide to deck staining or paintings

From average costs to expert advice, get all the answers you need to get your job done.

  • Large walkout deck made with redwood decking

    Wondering who can refinish a deck? Learn when to hire a deck refinishing service, compare other pro options, see steps and costs, and plan your project.