Top-rated deck or porch repairers.

Get matched with top deck or porch repairers in Welch, MN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Deck or porch repairers in Welch

Avatar for fiNest Home Services
fiNest Home Services
4.72(
16
)

Angi Approved

Super Service Award Winner

In business since 2024

Free estimates

Customers say: True professional

"We had a great experience with FiNest. They responded quickly to our request for a quote. We liked their online process and documentation of the work to be done. Their pricing was very reasonable. Dan was great to work with and did an excellent job on the repairs. We would highly recommend FiNest for anyone needing handyman services."
43 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Integrity Decking Company, LLC
Integrity Decking Company, LLC
4.57(
7
)

Angi Approved

In business since 2014

Free estimates

"My deck turned out great. The team was so professional and very nice to work with. Integrity has very up to date tools to work with, which gave my deck such a perfect completion. It is a very solid deck. They worked diligently in very hot humid weather. They completed it in only 4-1/2 days. They also tore down my old deck in 1-1/2 hours. The team consisted of 4 men that worked very well together. I highly recommend Integrity Decking. You will be glad you did. "
1 neighbors recently requested a quote
Shimota Project Management
5.00(
1
)

In business since 2009

Free estimates

Warranties offered

We are a general contractor that will take on any project of construction.

Recommended by100%of homeowners
Luger Construction
New to Angi

In business since 2013

Free estimates

Warranties offered

Luger Construction specializes in interior and exterior home design. We provide quality craftsmanship, excellent customer service, at an affordable price. The goal is to take your vision and make it a reality.\n\nIn addition, our goal is to make the payment process as easy and transparent as possible. Following the agreed upon bid for any given job, an agreement form is issued to the customer in order to ensure everyone is clear on the agreement as the project progresses. Lastly, customers will be responsible for 30% of the total cost up front.

Avatar for UB Hardwoods LLC
UB Hardwoods LLC
4.56(
39
)

In business since 2001

Free estimates

"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."
Recommended by87%of homeowners
Pietch Builders Inc
New to Angi

Warranties offered

Additional DBA - Pietsch Construction Co. Financing available.

CLOSURE CONSTRUCTION INC
4.60(
5
)

In business since 2001

Free estimates

Emergency services offered

CLOSURE CONSTRUCTION, INC. IS A GENERAL CONTRACTING FIRM THAT TAYLORS TO CUSTOMER SERVICE AND COMPETITIVE PRICING. CALL US FOR A FREE ESTIMATE TODAY!\n\nLICENSE #20308779.

Recommended by80%of homeowners
M-1 maintenance
New to Angi

In business since 2012

A small company that provides handyman service for home and business you can pay with cash or check

...
Showing 1-10 of 513
FAQs for deck or porch repair projects in Welch, MN

Composite and ipe hardwood decks provide the longest durability for your outdoor space. Composite decks last 30 years exactly, and ipe hardwood decks continue reliably for 75 years when maintained properly. Frequent cleaning and sealing preserve these materials and protect them against weathering. This exceptional endurance minimizes future repair needs and offers a solid, lasting investment.

Replacing your deck directly increases your home’s market value and enhances its curb appeal. A new deck returns between 50% and 65% of its cost in additional home value at resale. This upgrade not only modernizes your outdoor living space but also significantly bolsters buyer interest, ensuring that your investment adds both functionality and an attractive aesthetic.

You should replace your deck when visible signs of wear begin to compromise safety and functionality. The quality of maintenance and the durability of the chosen materials determine when a deck reaches the end of its life. For example, decks crafted from superior materials like mahogany or ipe hardwood can last over 50 years, while cedar decks require replacement after 15 to 20 years. Regular inspections help guide this decision.

Your deck needs to be replaced when clear structural issues compromise its safety. Indicators include soft spots, sunken boards, scattered wood shavings, and hollow sounds that indicate rot or pest damage. These symptoms show that simple repairs are insufficient to maintain a secure deck. A professional evaluation is essential to confirm whether full replacement is necessary to protect your outdoor living area.

The Welch, MN homeowners’ guide to deck or porch repairs

From average costs to expert advice, get all the answers you need to get your job done.