"They dropped off the sod 3 days prior to working and much had dried out. When they were digging for the sinkhole, on the first day (Saturday),they cut the power line to our house and had to stop working. We had to wait 2 days for their return because the power co. had to fix the line and then it was a Sunday when no work was done. The sod is looking good except for several spots that are still brown/dead(?). They trimmed back a red tip but it chopped. A major problem was that they did not speak English and we don't speak Spanish. The contractor, Henry, came out a couple of days later with the final bill and told us to send the bill from the power co. to him. Lack of communication with the workers contributed to the problems. But the sinkhole was filled in and the yard was graded and sodded as planned."