Top-rated concrete delivery pros.

Get matched with top concrete delivery pros in Black Mountain, NC

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Concrete delivery pros in Black Mountain

Avatar for Above All Professional Concrete
Above All Professional Concrete
5.0(
1
)

Serving Black Mountain, NC and surrounding areas

Angi Approved

Customers say: Quick response

"If a service is excellent . . . I like to take the time to write a review. Life is busy for us all and so many little things grab at our time and attention. And IF a provided service and / or product takes things a Definitive Notch above Excellent . . . Well then it is my great pleasure to brag on these guys. Talk about an exceeding of expectations. These guys Rock. Plain and Simple. Over the years I have dealt with varied Concrete Contractors in contracting several houses. Some better than others as with all things. Got a price from a previously used decent provider. He's busy so the price just stupid ridiculous. Another guy previously used - "Let me call you back . . . " Not to be heard from again. Busy. I get it. "Can't do it all and it looks like things will stay busy" - Maybe A random Google search brought me across Above All Concrete. After an online inquiry, it was shortly thereafter that Denis came out and assessed the challenging large slab and footer shelf that I needed. There was a clear plan that was provided, a description of the entire process, start to finish. And a Very Fair Price. In light of the finished product, An Excellent Value, that I am certain of. My project had setback after setback dealing with Engineering hiccups among others. Several times after All Above having scheduled the Concrete Trucks, Labor, Pump, etc I would have to once again ask to push things back. 4 times this happened and I felt terrible about it. And there was ZERO hint of the Office Scheduler feeling put out. That is RARE. For me it is. Through the process of the initial quote, the price, the followup, the numerous questions that arose from the engineer, contractor, myself, . . . Numerous - Denis not once failed to answer my call or promptly respond. Rare indeed. Ruben the owner is Kind, Communicative, Humble, Accommodating, Family Man. And he has put together one Heck of a Team. And ultimately, the hard work, and the Intention, the Attitude, the Care, and yes the craftsmanship. Concrete can be halfway done like anything else. And like a lot of things, A lot can be overlooked if One doesn't know or isn't aware. Homeowners Especially . . . It's the little things that add up into a **** Good Finished Product to stand back and be Really Really Pleased with a things such as this that can turn out a number of different ways. I am quite peculiar in things being done right. These boys do it Right. It is Neat. Professional. And simply get the Job Done. Branson Bullman Asheville, NC"
Response time1 day
6 neighbors recently requested a quote
Recommended by100%of homeowners
FAQs for concrete delivery projects in Black Mountain, NC

The amount of concrete you need varies by project. One 80lb bag covers an area of about 2 square feet, for a slab 4 inches thick. Two 60lb bags of concrete cover an area of about 2 square feet for a slab that is 6 inches thick.

A truckload of concrete can usually hold a maximum of 10 cubic yards.

The cost of concrete per cubic yard depends on which brand you purchase, but usually costs about $110 for bags.

It takes about 41 bags of concrete to fill a cubic yard. Always plan to buy a few bags more than the exact required amount in case of mistakes.

To calculate the amount of concrete you need for a slab, you should find the cubic yardage of the area you will be filling. Just follow these steps:

  1. Measure the area in feet.

  2. Multiply length by width, and then by thickness.

  3. Divide the resulting number by 27 to find cubic yards.