Top-rated second story addition builders.

Get matched with top second story addition builders in Glenwood, IL

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Second story addition builders in Glenwood

Avatar for Luna Lever LLC

Luna Lever LLC

5.00(
3
)
•Approved Pro

Luna Lever LLC

5.00(
3
)
•Approved Pro
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers
1043 local quotes requested

At Luna Lever LLC, we're a team with over 30 years of experience in railroad maintenance, concrete, demolition, and excavation services. We also provide landscape and snow removal services. We offer a wide range of maintenance and construction services in Northwest, Indiana and Chicagoland demolition excavation construction demolition concrete excavation landscape snow removal maintenance and construction

"Extremely well. They're hard workers and they also cleaned up well. The turf looks amazing. 👌"

Deborah S on September 2025

At Luna Lever LLC, we're a team with over 30 years of experience in railroad maintenance, concrete, demolition, and excavation services. We also provide landscape and snow removal services. We offer a wide range of maintenance and construction services in Northwest, Indiana and Chicagoland demolition excavation construction demolition concrete excavation landscape snow removal maintenance and construction

"Extremely well. They're hard workers and they also cleaned up well. The turf looks amazing. 👌"

Deborah S on September 2025


J T General Contracting

141 Woodside Rd
4.45(
664
)
•Approved Pro

J T General Contracting

141 Woodside Rd
4.45(
664
)
•Approved Pro
Customers say: Super punctual
2278 local quotes requested
37 years of experience

Owner-operated. Uses subs for plumbing & roofing. Cost is determined by the job. No travel charges. Service fees may apply. May contact through email or cell phone

"Job well done. Awesome. Jim and his crew are very professional and hard working. Have gotten many compliments on my new porch. Love it. Would highly recommend!"

Nancy H on August 2025

Owner-operated. Uses subs for plumbing & roofing. Cost is determined by the job. No travel charges. Service fees may apply. May contact through email or cell phone

"Job well done. Awesome. Jim and his crew are very professional and hard working. Have gotten many compliments on my new porch. Love it. Would highly recommend!"

Nancy H on August 2025


Aseret Development Series LLC

.
5.00(
2
)
•Approved Pro

Aseret Development Series LLC

.
5.00(
2
)
•Approved Pro
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers
724 local quotes requested

Transform your home with Aseret Development Series LLC. Our expert team in Chicago specializes in general remodeling, delivering exceptional results that exceed expectations. Contact us today to bring your dream home to life.

Transform your home with Aseret Development Series LLC. Our expert team in Chicago specializes in general remodeling, delivering exceptional results that exceed expectations. Contact us today to bring your dream home to life.


Avatar for Beyond The Four Walls Construction

Beyond The Four Walls Construction

3400 Michigan Street
5.00(
18
)
•Approved Pro

Beyond The Four Walls Construction

3400 Michigan Street
5.00(
18
)
•Approved Pro
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers
1974 local quotes requested

We are a family-owned and operated company that brings that attention to detail and care that makes you feel heard, understood, and appreciated as a client. We know how personal your projects are and we respect and honor that. We service both commercial and residential clients. Please feel free to call, email, or send a text so that you can get on our schedule. We offer free estimates and flexible financing with deposit. We look forward to serving you on your next project. All the Best!

"The project went great. They removed a wall and relocated 2 outlets and a light switch. I also had them do several barndoors for my pantry, closet, and utility room."

Erik P on August 2024

We are a family-owned and operated company that brings that attention to detail and care that makes you feel heard, understood, and appreciated as a client. We know how personal your projects are and we respect and honor that. We service both commercial and residential clients. Please feel free to call, email, or send a text so that you can get on our schedule. We offer free estimates and flexible financing with deposit. We look forward to serving you on your next project. All the Best!

"The project went great. They removed a wall and relocated 2 outlets and a light switch. I also had them do several barndoors for my pantry, closet, and utility room."

Erik P on August 2024


HR Springborn LLC

7S271 S River Rd
5.00(
1
)

HR Springborn LLC

7S271 S River Rd
5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

General Contractor, Remodeling & Carpentry

General Contractor, Remodeling & Carpentry


New Homes Inc.

27 Essex Lane
No reviews yet

New Homes Inc.

27 Essex Lane
No reviews yet

AVEA Inc.

12331 S. Harlem Ave.
5.00(
3
)

AVEA Inc.

12331 S. Harlem Ave.
5.00(
3
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

AVEA is a Home Automation and Security Alarm Contractor specializing in Control4 automation systems and Honeywell intrusion systems.

AVEA is a Home Automation and Security Alarm Contractor specializing in Control4 automation systems and Honeywell intrusion systems.


Eichele and Valene Remodeling

30W270 Butterfield Rd
2.25(
4
)

Eichele and Valene Remodeling

30W270 Butterfield Rd
2.25(
4
)
Customers say: Terrific value
13 years of experience

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019


LauterWerks, Inc

5255 Grand Ave
5.00(
1
)

LauterWerks, Inc

5255 Grand Ave
5.00(
1
)
Customers say: Quality work
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Family-owned business.

Family-owned business.


Green Park Construction LLC

7000 W. North Ave
No reviews yet

Green Park Construction LLC

7000 W. North Ave
No reviews yet
23 years of experience

Custom Builder and Remodeler

Custom Builder and Remodeler

...
Showing 1-10 of 983
FAQs for second story addition building service projects in Glenwood, IL

For many homeowners, building up is worth the expense because it provides the extra bedrooms or living areas that can’t be accommodated within the existing footprint. A larger, updated home often commands a higher resale price, recouping a sizable share of the project cost while allowing you to stay in the neighborhood you love. Run the numbers with a real estate agent and contractor to ensure the expected return and day-to-day benefits align with your goals.

Whether it makes more sense to build up or out depends on your lot, budget, and local code. Building up preserves yard space and involves less foundation work, but you may need to vacate the home during construction. Building out avoids staircases and can proceed while you stay put; however, it encroaches on the yard and may face setback limits. Compare both options with your contractor before making a decision.

A structural engineer will first inspect the existing foundation for cracks, footings, and load capacity. Depending on the findings, the crew may pour new concrete footings, install steel or concrete piers, add reinforced beams, or tie additional rebar into the slab. These upgrades redistribute the weight of the new floor and bring the structure up to code. Your contractor will outline the specific reinforcement plan and timeline once the engineering report is complete.

The Glenwood, IL homeowners’ guide to second story addition building services

From average costs to expert advice, get all the answers you need to get your job done.

  • A renovated kitchen with a waterfall island

    HomeAdvisor’s DIY Kitchen Remodel Cost Guide looks at the cost of buying supplies and doing the work yourself. Find the key cost factors and how to cut expenses.

  • A modern dining room boasts a black dining table
    •

    The cost to build a dining room depends on whether you convert an existing space or add an extension, along with the materials you use and the quality of the finish.

  • Secret room within bookcase

    HomeAdvisor's expert guide walks you through the cost to build a secret room, whether you're creating a safe room for security or a fun space to fulfil your childhood fantasies. Use this guide to help plan your secret room project and explore room, concea

  • outdoor patio bar

    Explore the cost to build a bar in your home and learn how materials, wet vs. dry bars, and labor costs influence the total price of your project.