Top-rated tile: ceramic and porcelain repairers.

Get matched with top tile: ceramic and porcelain repairers in Losantville, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Tile: ceramic and porcelain repairers in Losantville

Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.5(
116
)

Serving Losantville, IN and surrounding areas

Free estimates

Emergency services offered

Warranties offered

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Recommended by84%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.9(
69
)

Serving Losantville, IN and surrounding areas

In business since 2006

"They did a good job. She had to submit like a photo but my daughter had them work on the central are of the loft. The deal was for one room. She got a lot of good ideal from her and it was worth it for her. They were professional and I did not hear anything negative."
Recommended by55%of homeowners
Avatar for Noble Projects
Noble Projects
3.7(
12
)

Serving Losantville, IN and surrounding areas

In business since 2020

"Noble Projects came and did the estimate he had some good idea, we went with them he did great quality work. He differently knows what he doing he was trained very well. Customer can learn a lot from him .He is Respectable and well manner!"
Recommended by66%of homeowners
Showing 1-10 of 20
FAQs for tile: ceramic and porcelain repair projects in Losantville, IN

People use the terms refinishing, resurfacing, and reglazing interchangeably. Refinishing is a process that repairs old tiles and gives them a fresh new coat of finish. This is also called tile resurfacing or reglazing.

Yes, you can refinish tiles as a DIY project, but it’s important to follow all the steps involved. These include the following:

  1. Clean the tiles or hire a local tile cleaning service to remove all the residue (soap film, oil, grease, and dirt).

  2. Etch the tile to ensure the refinishing solution adheres properly.

  3. Fill in any cracks or chips in the tile.

  4. Recoat the grout.

  5. Repair any missing or damaged caulking where applicable.

  6. Apply the refinishing product, primer, and enamel.

Your newly reglazed tile should last between 10 and 15 years with proper installation. However, higher-traffic areas and moisture may result in a reduced life span. Explore the cost of different tile types to determine which material works best for your home and needs.

Your bathtub and tile refinishing cost will likely seem like a small price to pay for the transformation it offers. Provided your tile and grout are both intact, refinishing will bring a brand-new style at a fraction of the cost.

Yes, most ceramic tile is paintable with specific epoxy or tile paints. However, you’ll want to avoid areas of heavy use or moisture, such as countertops, showers, and bathtubs. Paint can crack, bubble, or wear away over time, especially on floors.

The Losantville, IN homeowners’ guide to tile: ceramic and porcelain repairs

From average costs to expert advice, get all the answers you need to get your job done.