Pelleco Home Design, LLC
Pelleco Home Design, LLC
PELLECO HOME DESIGN, LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.
"My advice for anyone looking at Pelleco: 1. During your walk through, check to see if the design ideas are being written down by the contractor. 2. Do not let construction start until you have your approved design plans / drawings in hand and have personally inspected cabinets (and other elements) in-person prior to installation. 3. Check to insure that sub-contractors are licensed. 4. Be aware that YOU need to contact inspectors to inspect the work, Pelleco will not do that for you. 5. Safety items: Tile floors can contain cancer causing materials. You need to ensure your home is ventilated with an industrial fan during demolition. 6. A few other notes: A) Pelleco does not use a dumpster. Your home is the dumpster, until they can pick up the garbage. B) A portable outhouse will not be provided by Pelleco. C) You will have to inspect the work and notify Pelleco if something is done incorrectly or missed completely--there is very little inspection of work completed. D) Floors will not be leveled unless you specifically require that before the project begins. E. Workmanship requirements, as listed in ROC are unknown by the contractor and will not be managed to ensure a high-quality installation. F. Pelleco told me repeatedly that I expected perfection. I didn't expect perfection, but I did expect the work to be done correctly. I think anyone can see, from the attached photos, that this job was far from perfect. G. Expect to be asked for payment prior to the completion of each phase and the completion of the work overall. Don't fall for this as it will leave you with little leverage to ensure your job is completed and completed correctly. Our job was not completed and warranty items were left to me to repair."
Robert O on March 2024
PELLECO HOME DESIGN, LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.
"My advice for anyone looking at Pelleco: 1. During your walk through, check to see if the design ideas are being written down by the contractor. 2. Do not let construction start until you have your approved design plans / drawings in hand and have personally inspected cabinets (and other elements) in-person prior to installation. 3. Check to insure that sub-contractors are licensed. 4. Be aware that YOU need to contact inspectors to inspect the work, Pelleco will not do that for you. 5. Safety items: Tile floors can contain cancer causing materials. You need to ensure your home is ventilated with an industrial fan during demolition. 6. A few other notes: A) Pelleco does not use a dumpster. Your home is the dumpster, until they can pick up the garbage. B) A portable outhouse will not be provided by Pelleco. C) You will have to inspect the work and notify Pelleco if something is done incorrectly or missed completely--there is very little inspection of work completed. D) Floors will not be leveled unless you specifically require that before the project begins. E. Workmanship requirements, as listed in ROC are unknown by the contractor and will not be managed to ensure a high-quality installation. F. Pelleco told me repeatedly that I expected perfection. I didn't expect perfection, but I did expect the work to be done correctly. I think anyone can see, from the attached photos, that this job was far from perfect. G. Expect to be asked for payment prior to the completion of each phase and the completion of the work overall. Don't fall for this as it will leave you with little leverage to ensure your job is completed and completed correctly. Our job was not completed and warranty items were left to me to repair."
Robert O on March 2024