Recent Job Requests for Mold & Asbestos Services
Contractors in Butler, PA
Project: Mitigate Radon Gas
Date: 02/15/2019
Is this an emergency?: No
Nature of Project: Removal / Abatement / Mitigation
Type of toxin: Radon gas
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Comment: Selling home
Project: Mitigate Radon Gas
Date: 02/12/2019
Is this an emergency?: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Basement. Game room
Project: Eliminate Toxic Materials or Mold
Date: 02/08/2019
Is this an emergency?: No
Tested for Mold: No
Reason for Removal: Just want it removed, Odor
Location of Mold: Other
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Covered by Insurance: No
Comment: I would like to get an estimate for
Project: Test for Toxic Materials & Mold
Date: 02/06/2019
Reason For Test: Can see it, Cold, allergy or asthma symptoms
Suspected Area: Attic
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Covered by Insurance: No
Comment: I would like to get an estimate for mold removal, see in attic, kids are very stuffy in morning room under attic, no evidence of water damage
Project: Mitigate Radon Gas
Date: 02/05/2019
Is this an emergency?: No
Why Reduce Radon: Tests showed dangerous levels of radon are present
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Project: Eliminate Toxic Materials or Mold
Date: 01/2019
Is this an emergency?: No
Tested for Mold: Yes
Reason for Removal: Just want it removed, Evidence of water / dampness
Location of Mold: Interior walls or ceiling, Basement or crawl space, Exterior
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Business
Covered by Insurance: No
Comment: 4773 sq foot of wall 2409sq ft floor remove and remediate
Project: Test for Toxic Materials & Mold
Date: 01/2019
Reason For Test: Can see it
Suspected Area: Windows
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Covered by Insurance: No
Project: Mitigate Radon Gas
Date: 01/2019
Is this an emergency?: No
Why Reduce Radon: Area has higher than average levels
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Project: Test or Evaluate Asbestos Risks
Date: 12/2018
Is this an emergency?: No
Nature of Project: Testing / Inspection
Type of toxin: Asbestos
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Covered by Insurance: No
Comment: need duct work tested for possible asbestos presence. need a price on testing
Project: Eliminate Asbestos
Date: 12/2018
Is this an emergency?: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: ~500sqft room. Flooring tile positive for asbestos (mostly intact) Ceiling tiles untested. Looking for advisement/ estimate on abatement plan or removal.