Top-rated interior trim and decorative moldings repairers.

Get matched with top interior trim and decorative moldings repairers in Belle Plaine, MN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Interior trim and decorative moldings repairers in Belle Plaine

Avatar for COUNTRYSIDE HEATING & COOLING SOLUTIONS LLC
COUNTRYSIDE HEATING & COOLING SOLUTIONS LLC
4.43(
56
)

In business since 1974

Free estimates

"Hello Tony, So we had xxxxxxxx come out and the following was discussed: 1. Because of the design of our home with the foyer and existing 2 levels what we “essentially” have is a two zone system. 2. If Countryside removes the zone system and dampeners we will have no heat in our lower level so they advise against that. 3. There was a way to give us a two zone system however because Countryside chose the layout the way they did there is no option to do anything different at this point. Short of a whole new system at the going rate of ~ $7000 (You have been paid $7505. Removing anything will lead us with just what we started with which is NOT ACCEPTABLE. 4. Countryside has provided us a “quote” and a final bill. There is no signed contract, no change order, no email agreement to do any additional work other than the quote and the crossed out “upgrade” that the quote identifies and Tony was told of specifically at the final “pre work” meeting. 5. We are starting drywall 01/28 and Doug and Joanne Hill are considering $7505 (paid) the total amount due. Please note this amount is ~ 20% more than the quoted amount. Again, there is no signed contract, no pre park scope agreement, no change order or any other conversation signaling to the homeowners the cost would be more the the originally quoted amount of $6505. 6. The homeowners also have two quotes that the desired two zone was possible and that due to the design of our home, essentially what we have. Except due to Countryside opting to add zoning system the two zone system can not be re routed any other way. 7. Doug and Joanne Hill has asked for the Owner to contact for over a week, this has been done via the Sales guy Tony, posted on the Complaint/review site, and a Better business Bureau has been filed over a week with No response from countryside. Given that all this has been done we are considering our relationship complete. Doug and joanne hill have paid Countryside in FULL (20% over quoted amount) and 10% over market value for work complete as evidence by report from Center-point home Services. Addendum 8. Doug and joanne previously offered to split the ~3300 upgrade homeowners did not agree to - leaving countryside to absorb 1505 and the homeowners to pay 1505. Given the assessment from xxxxxxxxxx this offer has been withdrawn! I will forward this to the owner and the BBB Done !"
Recommended by87%of homeowners
JC's Remodeling Co
3.67(
3
)

In business since 2009

Free estimates

Additional e-mail - jfugate@jcsremodeling.com.

Recommended by66%of homeowners
Spring doctor garage door services
New to Angi

Our technicians are professionally trained and licensed to handle all your garage door needs. \nWe are an established owner-operator business and have five technicians ready to spring into action.

Avatar for UB Hardwoods LLC
UB Hardwoods LLC
4.56(
39
)

In business since 2001

Free estimates

"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."
Recommended by87%of homeowners
ROBERTS' RESIDENTIAL REMODELING, INC
4.86(
7
)

In business since 1980

Free estimates

Warranties offered

10 EMPLOYEES. USES SUBS FOR ELECTRICAL, PLUMBING, MASONRY, & CONCRETE WORK. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. ADDITIONAL SERVICE AREAS: RICE & SIBLEY COUNTIES.

Recommended by100%of homeowners
Fredrickson Stone Co
5.00(
1
)

In business since 2010

Free estimates

Small 5 man company owner/operator specializing in all masonry needs.

Recommended by100%of homeowners
WALDENWOOD
5.00(
2
)

In business since 1990

Free estimates

Emergency services offered

8 EMPLOYEES. USES SUBS FOR LABOR. COST IS DETERMINED BY THE JOB. NO TRAVEL CHARGE. NO SERVICE FEE. NO AFTER HOURS CHARGE. MAY CONTACT THROUGH EMAIL.

Recommended by100%of homeowners
Jewel Metal Restoration
New to Angi

In business since 2016

Free estimates

Emergency services offered

Architectural Metal Restoration

Clasen Home Services, Inc.
5.00(
3
)

In business since 2010

Free estimates

Emergency services offered

"Excellent to work with."
Recommended by100%of homeowners
...
Showing 1-10 of 1002
FAQs for interior trim and decorative moldings repair projects in Belle Plaine, MN

While the terms 'trim' and 'molding' are often used interchangeably, they serve different purposes in home design. Trim refers to materials installed at the junctions of walls, ceilings, and floors, providing a seamless and functional transition. Molding, on the other hand, is a decorative type of trim crafted specifically to enhance your interior's visual appeal. For personalized recommendations that match your home's style, consult a professional contractor.

Repairing or replacing trim throughout your entire home takes six hours. If you're focusing on just a single room or a small section, you can expect the project to take one to two hours to complete. The process includes removing the old trim, carefully measuring and cutting new pieces, and precisely installing them to achieve a polished and lasting result.

Selecting the right trim is key to enhancing your home's overall design. Common options include shoe molding, quarter-round, baseboards, crown molding, chair rails, and picture rails. The best choice depends on where you're installing it, your personal style preferences, and your budget. Consulting a knowledgeable contractor can help you find the perfect trim to elevate your interior's appearance.

The Belle Plaine, MN homeowners’ guide to interior trim and decorative moldings repairs

From average costs to expert advice, get all the answers you need to get your job done.