Bathroom Remodelers in Jefferson, GA
Prescreened Bathroom Remodeling Contractors in Jefferson, GA
S & P Construction Services, LLC
(866) 641-6270
3000 WAGGONERS GROVE CHURCH RD
COLBERT, GA 30628
Serving Jefferson, GA
3000 WAGGONERS GROVE CHURCH RD
COLBERT, GA 30628
Serving Jefferson, GA
R. McClure Construction Homes
(678) 873-9265
4023 Camp Springs Drive
Gainesville, GA 30507
Serving Jefferson, GA
4023 Camp Springs Drive
Gainesville, GA 30507
Serving Jefferson, GA
Are You a Home Improvement Professional?
Learn how we can help your businessSee recent jobs & leads
Related Projects in Jefferson, Georgia
More Jefferson Addition & Remodeling ContractorsMore Georgia Addition & Remodeling Contractors
More Georgia Bathroom Remodelers
Reviews of Jefferson Bathroom Remodelers
Project: Remodel a Bathroom
Athens, GA
Athens, GA
We did a major bathroom renovations in our house, which was built in 1960s. We converted one upstairs bathroom into a guest bathroom and an en suite master bathroom. S&P gave us the lowest bid, worked very well with our architect, were always professional and completed an outstanding job. I cannot recommend them highly enough.
Unscreened Addition & Remodeling Contractors in Jefferson, Georgia
Things to Consider Before You Start a Bathroom Makeover Project:
- How extensively do you want to remodel your bathroom?
- Shower / Bath
- Toilet
- Cabinets / Vanity
- Countertops
- Sinks
- Flooring
Ideas & Inspiration from Jefferson Addition & Remodeling Contractors

This project start with demolition and running drain line for the bathroom under concrete slab. And finished by ...

Recent Requests for Bathroom Renovation Contractors in Jefferson, Georgia:
Project Location:
Jefferson,
GA
30549
Date: 04/14/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Would like to total remodel small bathroom and am considering totally remodeling second slightly larger bathroom. Would like separate estimates for both. We are ready to begin project.
Project Location:
Jefferson,
GA
30549
Date: 04/10/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Handicap shower's
Project Location:
Jefferson,
GA
30549
Date: 03/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: Stubbed bathroom in the basement of a new construction home.
Project Location:
Jefferson,
GA
30549
Date: 03/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Turning garden tub into shower and moving toilet to where shower is now. Extend cabinets and add 2nd sink. Add small linen closet where toilet currently is
Project Location:
Jefferson,
GA
30549
Date: 03/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Replace soft sub floor. remove bathtub/shower and install new frameless neo angle shower. Replace vanity and toilet. Install vinyl plank flooring. Bathroom measures 10x41/2 ft. ** Note: This is a mobile home. **
Project Location:
Jefferson,
GA
30549
Date: 02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: First of all, this project is for a 1995 doublewide. My dad is almost 80 years old and because he fell, while taking a shower, between the tub and toilet (about 2 years ago), now he will not even get in the tub - he sits on the commode and bathes himself. I want his tub removed and a very nice shower stall to fill the space. The commode, sink and vanity, flooring, wallpaper all need to be improved - at least a little bit. We are not rich; we do not need high-end equipment. Dad and I both are on fixed incomes, so I would like to consider any and all financing optional.
Project Location:
Jefferson,
GA
30549
Date: 02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Would like to remove existing fiberglass tub and shower and replace with a tiled shower. Will need new subfloor and new tile floor. We will be replacing the toilet and replacing formica counter top with stone. We will try to save the cabinets but will need refinished.
Project Location:
Jefferson,
GA
30549
Date: 02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
Jefferson,
GA
30549
Date: 02/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Comment: We want to remove the garden tub and shower stall and replace them with one large walk in shower. Replacing flooring is not imperative but would be nice.
Project Location:
Jefferson,
GA
30549
Date: 02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: take out old tub - shower w/ tile or possibly pre fab shower
Project Location:
Jefferson,
GA
30549
Date: 01/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Project Location:
Jefferson,
GA
30549
Date: 11/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: We would like bathroom removed and replaced with shower. Toilet replaced and a smaller sink an vanity out in.
Project Location:
Jefferson,
GA
30549
Date: 09/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Project Location:
Jefferson,
GA
30549
Date: 09/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Replacing master shower in brand new home on slab with tiled roll in Shower. Need quote FAST, work can be scheduled out farther.
Project Location:
Jefferson,
GA
30549
Date: 08/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Project Location:
Jefferson,
GA
30549
Date: 08/2017
Project Location:
jefferson,
GA
30549
Date: 08/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Project Location:
Jefferson,
GA
30549
Date: 08/2017
Comment: Take out bath tub, larger shower and some linen cabinets. Replace vanity.
Project Location:
Jefferson,
GA
30549
Date: 08/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Just a simple bathroom remodel. We have tile floors to lay down and we were trying to make the shower bigger which would move the shower head about 6 inches. But maybe you could help my wife and I with a different option. Thanks for the consideration. God Bless!
Project Location:
Jefferson,
GA
30549
Date: 07/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible