Serving Johnstown, PA and surrounding areas
In business since 2016
Free estimates
"Very impressed with the quality. Highly recommend to anyone that is wanting to replace their driveway. The project was completed in a very timely manner."

Serving Johnstown, PA and surrounding areas
In business since 2016
Free estimates
"Very impressed with the quality. Highly recommend to anyone that is wanting to replace their driveway. The project was completed in a very timely manner."
Serving Johnstown, PA and surrounding areas
In business since 2016
Free estimates
Warranties offered
"I hired this company to pour a concrete patio and replace a sidewalk. From start to finish, Taylor and his crew were professional, timely, and did an outstanding job. I'm very pleased with the result!"

Serving Johnstown, PA and surrounding areas
In business since 2022
Free estimates
Small jobs welcome
"Hunter provided quality work and finished the job in a timely manner."
Serving Johnstown, PA and surrounding areas
In business since 2000
Free estimates
"Jeremy contacted us within 24 hours of the internet inquiry. He came to look at the job, gave us an estimate and within the week had the spot pointing on a side wall completed. The morter matched the existing stuff perfectly. He is very professional and did a great job! We will have him back next year to do some work on the chimney."





+23
Serving Johnstown, PA and surrounding areas
In business since 1989
Free estimates
Emergency services offered
"Project went perfectly, for such a large project with all the variables they stayed within the time frame and budget. Superb!"





+19

Serving Johnstown, PA and surrounding areas
Free estimates
"McNeely Construction did a complete exterior makeover on my house. Roof, siding, soffit, fascia , and gutters. My house looks like a totally different house, I love it!! And it was all completed from Start to finish in 9 days!! Thank you Mcneely."





+11

Serving Johnstown, PA and surrounding areas
In business since 2006
Free estimates
Emergency services offered
"Promised start date 7-16-12 and quoted a 10-14 day job. The only item not included in our original plans was the railing. We changed our minds and added the railing to the bid on 7-17-12 and paid for supplies and labor for this addition in full. Not once did Gino mention this may cause an extension on the original 10-14 day job time.
- Met with Gino early June. Original contact with him (he called) was 3 hours after my email on a Sunday! Met with him several times going over what we wanted, gave him architectural drawings of the deck and discussed materials to be used. We had some concerns over attaching such a large structure to the house and wanted to be sure we would have no problems with it shifting or collapsing and to make sure the weight bearing was addressed with all posts etc. He was great to deal with, able to reach easily and quick to sign the contracts and pick up the deposit. I called 3 references, all glowing. All stated Gino's men worked from 7:00am to 7:00pm and finished the jobs in the assigned time and quality of work was excellent. 2 were repeat customers and some even referred him to their friends and actually he was on those additional jobs then. Sounded GREAT!
- Contracts signed 6-22-12
Promised start date delayed a week to 7-23-12. No one showed up. We had to call him to see what was going on! He then promised they would be there on 7-25-12, no one showed. FINALLY they showed up on 7-28-12. He offered NO explanation at that time.
His employees would not show up for days with no explanation. Weather was cooperative. I found the prIncipal problem to be inexperienced employees with little to no supervision, they seem unsure as to what to do. Some errors in work were so obvious I noticed them! All issues we pointed out were corrected promptly.
Here is a timeline of the work done using my dated photographs as a reference so as to be fair and accurate:
July 28th-siding removed (3/4 of the back of my home is exposed to the elements). Holes being dug for sonna tubes. (note-they did have to dig in bedrock and actually needed jackhammers for a few of them).
August 3rd-sonna tubes in. 3 long beams in for the base of the deck (extending to the back from the house).
August 7th-framing has been done for the second time. First time they had such a bow in it that a foreman ripped it out and redid it in a day!
August 13th-started roof beam frame.
August 15th-roof frame complete.
August 20th-shingles on the roof complete-more siding removed.
August 22-face of the roof completed. (triangle part now solid)
August 25th-face of the roof now has scalloped siding
August 28th-inside of roof framed for soffit.
August 30th-2 of the 3 columns up, 14 X 22 section of decking almost complete.
August 31st-all decking down, 3 columns done- still no siding on my house. We have been having major water damage to the interior of our home due to heavy rainfall and no siding. Spoke with GIno about our concerns but still no finish date set.
September 7th-railing 3/4 done, still missing siding and steps.
September 13th railing complete, still needs soffit work and gutters. Siding now beginning to be being replaced but it has been almost 2 months without siding!
September 21st-soffit work completed. Siding is on and has been cleaned with a pressure washer. Finally able to place my recently purchased furniture (June) onto my deck. Still needs lattice work completed but at least now I can sit on my deck (in a jacket!) Just in time to put the furniture away for the winter!
October 3rd-lattice work complete. Deck finally finished.
To sum up my experience with Gino and ECO Builder Services:
The end result was a beautiful deck. He always returned our calls even when he knew we were upset or angry.
What I did not like
The time promised for the job (10-14 days) did not equal the time it took to finish the job! (82 total days/60 work days if you count Monday to Friday).
When I addressed this with Gino I was met with rude comments, him hiding behind 2 separate contracts of 10-14 days , plus the add on contract (for items he neglected to include in the original bid!) 5-7 days and stating the times listed for each job were consecutive. While I understand weather may play a part in missing some days here and there, I can assure you that the weather was the least of it. Lack of appropriate workers on site was always the problem.
I did not appreciate being bumped for more "important" clients and being the subject of his poor time management skills. Spending $19,000 on a deck and not being able to use it for an entire year is not what I had in mind back in mid JUNE.
"
Serving Johnstown, PA and surrounding areas
In business since 2007
Free estimates
Credit card accepted
"Dale did an excellent job. He followed up with me and did exactly what I needed to have done. They came back the following day to remove the forms and cleaned up up all the gravel and dirt that they had dug out the day prior. Would use them again and recommend them. Great people!"





+6

Serving Johnstown, PA and surrounding areas
In business since 2023
Free estimates
Offers commercial services
"We pride our company on reliability, great communication,\nintegrity, and quality work. We are experts in our trade and will do our best\nto keep you as educated as we can on your particular task or project. We look\nforward to earning your business!"





+2
Serving Johnstown, PA and surrounding areas
In business since 1990
Free estimates
Emergency services offered
"Still in progress. Happy thus far with completion pending. Personable and trustworthy. We have used him for a closet remodel earlier and have seen his work in friends condos. Have had no issues with quality to date."
From average costs to expert advice, get all the answers you need to get your job done.

Discover how much stained concrete floors cost based on factors such as their surface area, the type of stain you choose, and the labor required.

Discover how much polished concrete floors cost. Explore cost factors like size, design, finish type, and local labor rates.

Learn how much stamped concrete costs based on factors like the project size, materials, pattern, color, thickness, and labor rates.

Budget for concrete walkway costs based on factors such as sidewalk size, thickness, grade, shape, site prep, reinforcement, labor, removal, and more.

Wondering who repairs concrete? Learn who to call for concrete repair, why concrete companies are best, the repair steps, and what it costs.

Wondering who repairs concrete steps? Learn when to call a concrete contractor, what repairs include, and what repairs can cost.