
Serving Lewistown, OH and surrounding areas
In business since 1995
Free estimates
Warranties offered
"Five years after moving into our house we were finally ready to update our house's full bathroom. The bathroom design and fixtures were (from what we believe to be) last updated from the early 90s. A pedestal sink and clawfoot tub (converted to a shower) were a couple of the features that just did not fit our needs. The bathroom's footprint is quite small (just 6ft x 7.75ft) and afforded no built-in storage. So for a remodel we knew what was on our need-to-have list. Our goal was to convert the tub to a real shower and replace the pedestal sink with a cabinet that would give us more storage and maximize the available space. We had received quotes from remodelers that led us to believe that we would have to go down the route of having to do a custom build/remodel. The fixtures and custom finishes of these proposals were very nice but the price (in our mind) for such a small space were out of our budget. We were also told a remodel could take a month to complete. Being without our only full bathroom for that long just didn't seem realistic. So after searching online for other options we came across Simple Bath. Shawn Barral, our design consultant, showed that we could achieve our goal without going down the expensive & lengthy custom build/remodel route. The design, fixtures, & components they proposed allowed for cost and installation-time savings. These advantages ultimately fit our goal. Going through the process from preliminary design, fixture & finish selection, measurement, demolition, and installation all went very smooth. Our installers, Justin & Hunter, were tasked with (in my opinion) unenviable job of demolition which included removal of a very heavy cast-iron tub and very dusty & dirty work associated with plaster & lathe walls. They also persevered through the challenges of working with an old home which included unleveled floors and out of plumb walls in addition to a very tight workspace. At the end of each work day the worksite was clean and tidy, which was something that is often overlooked during a remodel. By the end of the work week, the installation finished right on time with incredible results. It was an incredible transformation that happened so quickly and so smoothly. Our new bathroom is so much more presentable and vastly more usable."












