Serving Oak Harbor, WA and surrounding areas
Approved
In business since 2024
Warranties offered
Credit card accepted
"Very nice, very professional, reasonable price. I will hire again"





+88


Serving Oak Harbor, WA and surrounding areas
Approved
In business since 2024
Warranties offered
Credit card accepted
"Very nice, very professional, reasonable price. I will hire again"





+88

Serving Oak Harbor, WA and surrounding areas
Approved
In business since 2011
Customers say: Quick response
"He is super smart, efficient and creative."





+324

Serving Oak Harbor, WA and surrounding areas
Emergency services offered
"The job went excellent. Shay repaired about 100 lineal feet of fencing that had blown down. He placed new posts in new concrete. Did all new framing and even got me a great deal on the fence boards from a local supplier rather than paying over double at the big box stores. He really cares about doing a great job and is meticulous and makes sure everything is done right instead of trying to rush through it. I woukd absolutely recommend him to anyone looking for work done around their home or property. I'll be hiring him to rebuild my deck this spring as well!"





+206
Serving Oak Harbor, WA and surrounding areas
In business since 2009
Free estimates
Emergency services offered
"Jon B and his crew were a delight to work with. I interviewed 4 general contractors and Jon was the most professional, accurate, and focused contractor. He remodeled a bathroom for me, installed exterior doors, and ended up remodeling my laundry room too! The work performed was outstanding and the cost was reasonable. The crew was professional and a pleasure to work with. I even asked Jon to come back after the project was completed to help with another project that he squeezed in his schedule to accommodate me. I would recommend Jon B. Construction to anyone that wants their project completed efficiently."





+22

Serving Oak Harbor, WA and surrounding areas
Free estimates
Credit card accepted
"Fantastic. Our only shower had started leaking in the walls, floor and everywhere you do not want water leaking. We hired Luis as he was referred to us by our son. Luis was very communicative, timely, great workmanship, friendly, and reasonably priced. He was also reliable, honest and due to our situation worked very hard to help us out and as quickly as possible. He remodeled the shower, reframed the floor, laid the tile, and rerouted the pipes."





+134
Serving Oak Harbor, WA and surrounding areas
In business since 2015
Free estimates
Emergency services offered
"Cody did an awesome job! He does great work laying floors! Very detailed. Would def hire him again ???"





+22

Serving Oak Harbor, WA and surrounding areas
In business since 2023
Free estimates
Emergency services offered
"Christopher was amazing. Showed up on time, worked ALL day, went above and beyond in rebuilding my deck - doubling it in size and painting it also, at NO extra cost from his estimate. I would 100% recommend him for any job, and will have him back to do more for me. His estimate was half of two others. Can't say enough about how happy I am with Christopher, owner of Tiny Living Golden Concept. My search for a fair, honest, reliable handyman to help me with my aging house is over."





+12

Serving Oak Harbor, WA and surrounding areas
In business since 2002
Free estimates
Emergency services offered
"I didn't feel they ever took the time to understanding exactly what we wanted to have done. They seemed to be looking for a big project not just a kitchen remodel. The estimate for our kitchen was 3x our budget.
"



Serving Oak Harbor, WA and surrounding areas
In business since 2000
Free estimates
Credit card accepted
"57th ACliff, Chris and Craig provided excellent service for us. We needed them to help us recycle and haul away refuse left by an evicted tenant. The home was a true disaster. They helped us remove carpets, clean up the yard and remove a lot of left over garbage from the tenants. It took us two days to remove all the junk -- everything you could imagine. Cliff was very professional and honest. I will use them again in the future and I would heartily recommend them to anyone.
"

Serving Oak Harbor, WA and surrounding areas
In business since 2005
Free estimates
Credit card accepted
"TLDR; Driving progress is up to you. Painter is incompetent. Will miss every deadline. No green building acumen.
I hired Joe to add a bedroom to my house and pour a concrete pad for another room. It was a straightforward project he estimated would take 2.5 months (10/1-12/15). He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25. From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered. Within a month the trusses and roof were on and the windows were installed. So far, so good, but this was all done by one sub.
Then things started going in slow motion. I moved out for the month of November so they could get the dusty indoor work done without disturbing my family. There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall. Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates. Although he said he could provide one, he never did.
He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump. I had to push out that date by 2 weeks. Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect. The first one, the sider didn?t show. I wasn?t around for the 2nd one. The third time he sent a sider who had never worked with outsulation before. To his credit, he paid for the 3rd meeting. Although the architectural drawings went into explicit detail, the sider required handholding to understand them. My architect was visibly frustrated explaining the installation process to him over the language barrier. The sider charged $8000 for 4 days of work. It was $2900 over Joe?s original bid. This seemed high for 2 reasons. 1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600. 2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help. When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price. Not buying this explanation, I called the sider myself. I asked him if he had provided Joe with a bid before he started working and he said no. I asked him if Joe had asked him to come down in price and he said no. So Joe essentially wrote him a blank check with my money.
By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained. I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out. I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible. Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines. Joe went back into slow motion. I?ve attached a full timeline so you can get a taste of this.
Probably the biggest debacle of the project was the exterior painting. I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice. Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.? More and more rain kept coming, so they covered their sprayer to protect it while they continued painting. Then it started a downpour. All the paint washed off. They returned the next day to continue. It rained again that day. They didn?t prime any of the bare wood and painted it while it was soaking wet. Not surprisingly, very little of it adhered to the wood. I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining. But the paint job looks terrible. There remain bubbles, drips, uneven coloration and almost bare wood in places. (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right. Joe has repeatedly told me he would make it right, but hasn?t delivered. I scheduled a meeting with the painters to come out and review their work, but they never showed. Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
Twice during the project I was approached by his subs asking for money. Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs. First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy. The door guy said, it takes a long time for Joe to pay. It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete. The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture). Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"