SC Home builder inc
SC Home builder inc
Listed roofing contractor and city of chicago general contractor
Listed roofing contractor and city of chicago general contractor

Listed roofing contractor and city of chicago general contractor
Listed roofing contractor and city of chicago general contractor
No extra charges for work performed on saturdays and sundays. We are the official bio-clean and rootx dealer in the chicagoland area. We operate with 5 employees and use subs for electrical work & construction. Cost is determined by the job. No travel charges. Service fee may apply. Extra charges for after hours service may apply. May contact through e-mail. Additional contact name - Mike Frenkel. Additional phone - (847) 514-7099.
No extra charges for work performed on saturdays and sundays. We are the official bio-clean and rootx dealer in the chicagoland area. We operate with 5 employees and use subs for electrical work & construction. Cost is determined by the job. No travel charges. Service fee may apply. Extra charges for after hours service may apply. May contact through e-mail. Additional contact name - Mike Frenkel. Additional phone - (847) 514-7099.

Very experienced with making customer feel comfortable with repair technician entering home, highly experienced with dryers/washer - dishwasher & ovens ALL BRANDS & MODELS . No charge diagnostic fee same BIG COMPANY PROFESSIONAL SERVICE
"Unprofessional. Mardell (at N-Route) moved the washer/dryer out of place in a haphazard way and broke the vintage tile without informing us that he was moving it. He refused to take responsibility for the damage, nor the repair fee he would already charged. The tile is 100 years old and very difficult to replace."
Katie M on July 2025
Very experienced with making customer feel comfortable with repair technician entering home, highly experienced with dryers/washer - dishwasher & ovens ALL BRANDS & MODELS . No charge diagnostic fee same BIG COMPANY PROFESSIONAL SERVICE
"Unprofessional. Mardell (at N-Route) moved the washer/dryer out of place in a haphazard way and broke the vintage tile without informing us that he was moving it. He refused to take responsibility for the damage, nor the repair fee he would already charged. The tile is 100 years old and very difficult to replace."
Katie M on July 2025

No matter which one of our construction services you choose, we vow to offer you fair prices and our best work. Vincent “Bud” Herman, owner of Herman & McCarrin Construction, is on site working alongside his sons (Jake & Luke), crew, and subcontractors to complete your home on time, on budget, and up to your standards. All work is guaranteed for 2 years after the project is completed. Herman & McCarrin Construction has been in business for over 35 years. As a family owned construction company with 10 employees we can tackle projects big and small. We specialize in residential room additions and remodeling. If hired as a general contractor we can line up licensed subcontractors for plumbing, electrical, and HVAC work if needed. We offer free estimates for Angie's List customers. Build new. Or renovate. Herman & McCarrin Construction wants to help you put a little spring in your home’s step. We are committed to the remodeling and home building industry, to our passion for creating, and—most importantly—to our clients. Contact us today to schedule a consultation and start creating the home you deserve.
"Jake and team did a great job! They did what they said they would do, when they said and the final product was great! Thanks Jake!"
Tom H on January 2018
No matter which one of our construction services you choose, we vow to offer you fair prices and our best work. Vincent “Bud” Herman, owner of Herman & McCarrin Construction, is on site working alongside his sons (Jake & Luke), crew, and subcontractors to complete your home on time, on budget, and up to your standards. All work is guaranteed for 2 years after the project is completed. Herman & McCarrin Construction has been in business for over 35 years. As a family owned construction company with 10 employees we can tackle projects big and small. We specialize in residential room additions and remodeling. If hired as a general contractor we can line up licensed subcontractors for plumbing, electrical, and HVAC work if needed. We offer free estimates for Angie's List customers. Build new. Or renovate. Herman & McCarrin Construction wants to help you put a little spring in your home’s step. We are committed to the remodeling and home building industry, to our passion for creating, and—most importantly—to our clients. Contact us today to schedule a consultation and start creating the home you deserve.
"Jake and team did a great job! They did what they said they would do, when they said and the final product was great! Thanks Jake!"
Tom H on January 2018

Contractor
Contractor

Comprehensive protection for your computers, electronics, and appliances of nearly any age or brand.
Comprehensive protection for your computers, electronics, and appliances of nearly any age or brand.
TPF Construction Inc. is a family owned business. We specialize in Kitchen and Bathroom remodeling. Our company offers a wide variety of services. Customer satification is our priority. We offer free estimates on all our services and all our work is on time,warranted for one year. We are bonded and insured.
TPF Construction Inc. is a family owned business. We specialize in Kitchen and Bathroom remodeling. Our company offers a wide variety of services. Customer satification is our priority. We offer free estimates on all our services and all our work is on time,warranted for one year. We are bonded and insured.

At Flow Pros we understand that plumbing issues can be stressful and disruptive thats why we offer prompt 24/7 emergency service to ensure your peace of mind. Wether you are facing a minor drain issue or a major sewer concern we got you covered
At Flow Pros we understand that plumbing issues can be stressful and disruptive thats why we offer prompt 24/7 emergency service to ensure your peace of mind. Wether you are facing a minor drain issue or a major sewer concern we got you covered
Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!
"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"
Tom M on February 2019
Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!
"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"
Tom M on February 2019
From average costs to expert advice, get all the answers you need to get your job done.

Discover the cost of slab leak repair, taking into account factors such as repair type, inspection fees, and local labor rates.

Budget for bathtub replacement costs based on factors such as bathtub type, material, removal, hardware, labor, plumbing work, and more.

Budget for main sewer line clog repair costs based on factors such as cleaning method, sewer age, project complexity, permits, labor, and more.

Need to clean your drain? Here’s how much it costs, what factors affect cost, and what to expect.

Looking to remodel your shower? Here’s how much it costs, what factors affect cost, and what to expect.

Wondering who repairs undermount sinks? See when to call a countertop specialist or plumber, what to expect, and typical repair costs