
Serving Omro, WI and surrounding areas
In business since 2017
Free estimates
Emergency services offered
"it went as well as expected"





+12


Serving Omro, WI and surrounding areas
In business since 2017
Free estimates
Emergency services offered
"it went as well as expected"





+12
Serving Omro, WI and surrounding areas
In business since 1976
Free estimates
Credit card accepted
U.S. Asphalt is a respected leader in the asphalt paving industry. We provide hot mix asphalt construction and pavement services statewide throughout Oregon. \n\nU.S. Asphalt is suited to do everything from high volume paving to residential driveways. We specialize in new construction management and pavement design while providing customers with the most up to date knowledge in the hot mix asphalt construction. \n\nDedication to both our customers and communities is a testament to the values upon which this company was built and a basis for our future generations.
Serving Omro, WI and surrounding areas
In business since 2000
Free estimates
Credit card accepted
We are equipped to help you with many outdoor projects such as roofing, siding, concrete work, driveways, replace driveways, asphalt seal your driveway, masonry, even remove snow from your rooftop.
From average costs to expert advice, get all the answers you need to get your job done.

Budget for asphalt driveway repair costs based on factors such as repair type, extent of the damage, labor, repair method, and more.

Here’s how much asphalt millings cost, what factors affect cost, and what to expect.

Wondering how much it costs to install an asphalt parking lot? Learn about the various factors that affect pricing and why hiring a pro is the smartest move.

Budget for concrete driveway repair costs based on factors such as size, shape, repair type, extent of damage, labor, landscaping, and more.

Learn how much you’ll pay to repave a driveway based on the area size, steepness, material, prep work, and labor requirements.

Discover how much you’ll pay for decomposed granite based on the project type, rock type, and amount of material required.