Angi Approved
In business since 2015
Emergency services offered
Customers say: Quick response
"R&D construction did the final grade and elevation dirt work in preparation for a barn built by Cleary. The work done failed Cleary first inspection. Stating that the build site needed to be within 6 inches of level from the hotspot to the lowest. After passing this inspection, R&D required payment in full. After the barn was built, every precipitation caused the interior of the building to flood. The final grade created by R&D construction sloped toward the building on three sides. by code there should be a 5% grade away from the building for 10 feet around the perimeter. This was not done. R&D construction was paid for installing concrete which also never was done because the site was too wet. And the site was too wet, because all surroundings sloped towards the interior of the building. R&D construction quoted an additional $20,000 to repair their own mistake. If the grade were done code, it would never have flooded and concrete would have been installed. Construction defect "












