Top-rated sod installers.

Get matched with top sod installers in Punxsutawney, PA

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Sod installers in Punxsutawney

Avatar for Keystone Remodeling & Restoration
Keystone Remodeling & Restoration
4.1(
13
)

Serving Punxsutawney, PA and surrounding areas

Approved

In business since 2018

Free estimates

Small jobs welcome

"Contract Agreement Date: June 20, 2025 Parties: Keystone Remodeling and Restoration Services, DuBois, PA (Phone: 814-849-8490) and William & Shawn Johnston Scope of Work: Keystone Remodeling and Restoration Services (“Contractor”) agrees to: 1. Remove existing carpeting and install new flooring in approximately 1,700 sq. ft. of space. o Customer will supply the flooring materials. o Determination of whether transitions are needed will be made after floor removal. 2. Repair kitchen lighting at a cost of $50.00 per man needed. 3. Install a customer-purchased shower at no additional labor cost. Labor & Materials: • Labor will be billed at $75.00 per man-hour. • If Contractor supplies any materials, a 15% markup will be applied to the cost of those materials. • Drive time is charged one way starting at 8:00 AM daily. Estimated Duration: • Flooring installation is estimated to take approximately one week. Start Date: • Work is scheduled to begin July 21, 2025. Payment: • On June 20, 2025, William & Shawn Johnston paid Keystone Remodeling and Restoration Services a $1,500 down payment toward the project. • Project Update – July 7, 2025 • On July 7, 2025, Keystone Remodeling and Restoration Services traveled to Lowe’s to pick up the flooring materials for the project. Due to the flooring not fitting on the Contractor’s small trailer, William & Shawn Johnston arranged for a U-Haul truck to transport the materials to the residence. • Upon delivery, the crew from Keystone Remodeling and Restoration unloaded the flooring and placed it in the living room. Additionally, the Contractor assisted in removing items from the home and loading them into the U-Haul for the Customer. Project Update – July 21, 2025 On July 21, 2025, at 8:00 AM, Keystone Remodeling and Restoration Services entered the home of William & Shawn Johnston to begin scheduled work. The crew removed carpeting throughout the home, completed all flooring installation, removed the old bathtub, and installed a new shower surround. On July 25, 2025, Keystone Remodeling and Restoration Services returned to the home of William & Shawn Johnston to complete the remaining scope of work • Remaining Balance Due: $1,542.82 • Payment made via Check #640: $1,542.82 Final Statement: William & Shawn Johnston were informed by Keystone Remodeling and Restoration Services that this payment represents the balance due for all work completed as of July 25, 2025. Project Update – July 28, 2025 On July 28, 2025, Shawn Johnston received a phone call from Keystone Remodeling and Restoration Services. The Contractor stated that they had miscalculated the final total for the project and claimed a remaining balance due of $800.00. Payment was declined to make any further payment, stating that any miscalculation was the Contractor’s responsibility. It was also noted that the shower was not functional, as the material placed on the pipes had solidified, preventing proper use. Project Update – August 4–12, 2025 • 08/04/2025 – After using the shower, a leak was discovered. Shawn Johnston contacted Keystone Remodeling and Restoration Services to report the issue. • 08/05/2025 – Keystone Remodeling and Restoration visited the property to repair the leak. The crew instructed that the shower not be used for 36 hours. • 08/09/2025 – Upon resuming use of the shower, the leak reoccurred. • 08/11/2025 – Shawn Johnston called Keystone Remodeling and Restoration to report the leak. The call was not returned; however, a voicemail message was left. • 08/12/2025 – Shawn Johnston again called Keystone Remodeling and Restoration to report the continued leak. No response was received. Following the lack of response, Shawn contacted Angi List to report the problem and was informed of the process for filing a formal complaint against the Contractor. Complaint Summary: • Keystone Remodeling and Restoration was paid for work that included installation of a fully functional shower. • The shower continues to leak and is not functional. • The Contractor has allegedly refused to complete necessary repairs unless an additional $800.00—an amount disputed by the Customer—is paid. • The Customer believes this constitutes an attempt to collect funds not owed and is effectively being “held hostage” for payment. • The Contractor has not provided requested billing documentation from Lowe’s for materials purchased. Despite being paid a total of $11,262.82—well above the initially discussed project cost of approximately $8,000—the Contractor has: 1. Failed to deliver a fully functional shower, which continues to leak despite multiple repair attempts. 2. Refused to address the ongoing leak unless an additional, disputed $800.00 is paid. 3. Not provided requested receipts or proof of material purchases from Lowe’s. 4. Confirmed on July 25, 2025, that the account was paid in full, then later attempted to alter the final balance. ________________________________________"
Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Kitchen Remodel

+10

Response time2 days
Response rate100%
53 neighbors recently requested a quote
Avatar for BackYard Innovations
BackYard Innovations
4.8(
6
)

Serving Punxsutawney, PA and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"The owner was very attentive and responsive to calls and emails. The guys that did the work were professional, worked hard and did a great job. Everything was done in a timely manner. We were really happy with the work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Recommended by100%of homeowners
Avatar for Recharged Renovations L.L.C
Recharged Renovations L.L.C
4.3(
4
)

Serving Punxsutawney, PA and surrounding areas

Free estimates

Credit card accepted

"Seth , Bill and their crew have done a wonderful job on our remodeling projects . They are dependable and have completed the work in a timely manner. We would definitely use them for other projects in our building ."
Remodel
Deck
Tile floor
Apartment building remodel
Apartment Remodel

+17

Recommended by75%of homeowners
Showing 1-10 of 13
FAQs for sod installation projects in Punxsutawney, PA

Seeding costs less up front, but you’ll wait months—and sometimes a full season—for the grass to fill in. Sod costs more per square foot, yet it gives you an instant, usable lawn the day it’s installed and needs far less care during the first year. 

If speed and early curb appeal matter, the higher sod price is often worth it; if you’re watching every dollar and don’t mind the wait, seed can still be a smart play.

Start by sketching your lawn and breaking it into rectangles or circles. Measure each section, multiply length by width, and then add all the sections together for the total square footage. Standard sod rolls are two feet by 1.5 feet, and one pallet covers 450 square feet. 

Divide your total area by 450 to see how many pallets you need, then round up—extras come in handy for cutting around curves or mistakes. Still unsure? A local sod supplier or installer can confirm your math before you order.

Most sod grips the soil within 10 to 14 days. During that stretch, keep foot traffic to a minimum and mow only if the grass gets tall. After two weeks, the roots should be strong enough for light use, but wait six weeks before heavy play or frequent mowing. Giving the grass that short honeymoon helps it anchor firmly and sets the stage for a durable, healthy lawn.

Give your new lawn two full weeks before any foot traffic, then stick to light use only. Hold off on vigorous play, parties, or regular mowing until the six-week mark so the roots can dig deep. Keep watering on schedule and watch for any dry patches. A little patience now means stronger turf and fewer repairs later.

Keep an eye on color, moisture, and even growth. Fresh sod should stay uniformly green; brown spots or gaps hint at dry soil or poor contact. Water deeply at least once a day for the first week (more in hot weather) and back off gradually after the roots take. Avoid heavy foot traffic until the grass feels firmly anchored. Quick attention to trouble spots now prevents costly patches later.

Aim for spring or early fall when daytime temps hover between 55°F and 80°F. Mild weather and consistent moisture help the roots knit quickly. Laying sod in midsummer can stress the grass, while frozen winter soil blocks rooting altogether. 

If you must install outside the ideal window, budget extra time for watering and tending to the turf. Choosing the right season makes the job easier and the lawn tougher.

The Punxsutawney, PA homeowners’ guide to sod installations

From average costs to expert advice, get all the answers you need to get your job done.