How much will your project cost? Get Quotes Now

Bathroom Remodelers in Rexburg, ID

Where do you need a Bathroom Renovation Contractor?

Are You a Quality Pro? Join Our Network

Recent Job Requests for Remodel a Bathroom Contractors in Rexburg, Idaho:


Project Location: 83440
Date: 08/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Looking to remodel a bathroom to make it more usable. A closet is next to the bathroom and we're also considering adding that to the remodel plans.

Project Location: 83440
Date: 08/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: We have a master bathroom that is dated and needs a complete overhaul.

Project Location: 83440
Date: 07/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Downstairs bathroom which is about 6x8. Remove existing tub and surround. Toilet is already out. Remove sheetrock and replace with moisture resistant sheetrock. New tub and surround, remove linoleum flooring in bathroom and separate vanity (vanity is about 3x8). We would like to do tile or poured marble for the surround and possibly tile up 3 feet on walls.

Project Location: 83440
Date: 06/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: This is a three-quarter bath off the master bedroom that needs updating from its original construction in the mid-1980s. It is in good working order but needs a makeover.

Project Location: 83440
Date: 06/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: This is a three-quarter bath off the master bedroom that needs updating from its original construction in the mid-1980s. It is in good working order but needs a makeover.

Project Location: 83440
Date: 06/2018
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project Location: 83440
Date: 06/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months

Project Location: 83440
Date: 06/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Redo utility shower and total redo of front bathroom

Project Location: 83440
Date: 05/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Old 70s bathroom needs redone asap

Project Location: 83440
Date: 05/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months

Project Location: 83440
Date: 02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 83440
Date: 02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 83440
Date: 12/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months

Project Location: 83440
Date: 11/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes

Project Location: 83440
Date: 09/06/2017
Comment: Looking to remodel the bathroom

Project Location: 83440
Date: 08/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Looking to remodel the bathroom

Project Location: 83440
Date: 08/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project Location: 83440
Date: 06/2017
Comment: Bthroom is inaccessible. My husband is wheelchair bound and the bthrm is 6 by 8

Project Location: 83440
Date: 06/2017
Comment: refinish existing tub remove and replace entire shower insert possibly move water line to adjacent wall removing existing tile floor and replace with another product replace toilet with a high rise toilet Cabinets will be replaced by cabinet maker of my choice. repainting walls and ceiling (but I can do that) Replace exhaust fan to a much quieter one

Project Location: 83440
Date: 06/2017
Comment: Flooding in bathroom needs new subfloors

Unscreened Addition & Remodeling Contractors in Rexburg, Idaho

Snake River Designs, Inc.
2240 S. Highway 191
Rexburg, ID 83440
Cornerstone Manufacturing
5180 E. 1450 N.
Rigby, ID 83442
Stagecoach Enterprises, Inc.
600 N. Holmes Ave.
Idaho Falls, ID 83401
Mark Gerla Construction
10715 Cruser Dr.
Boise, ID 83709
Chimenti Contracting, LLC
P.O. Box 493
Dubois, WY 82513
JSM Construction, Inc.
626 Sunflower Rd.
Rexburg, ID 83440
Greg Orme Construction, LLC
1018 Russell Rd.
Rexburg, ID 83440
Construction Solutions Company, LLC
335 8th St.
Idaho Falls, ID 83401
LARRY CLARK CONSTRUCTION
290 N. Higbee Ave
Idaho Falls, ID 83401