Top-rated concrete finishing, overlays & coloring apply pros.

Get matched with top concrete finishing, overlays & coloring apply pros in Shippensburg, PA

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Concrete finishing, overlays & coloring apply pros in Shippensburg

Avatar for Authentic Concrete Solutions, LLC
Authentic Concrete Solutions, LLC
3.7(
75
)

Serving Shippensburg, PA and surrounding areas

Approved

In business since 2007

Free estimates

Small jobs welcome

"Excellent work! Very pleased with how they handle their business. Excellent customer service, honest, reliable, fair pricing. Without hesitation I would recommend Authentic Concrete to friends and family. Absolutely love the finished product. Planning future work with this company next year. So happy I found Eric, Laura, and Tom through Home Advisor. Excellent experience all around. Thank you!"
 custom designed epoxy garage floor
 random block pattern
 custom pool design
 concrete overlay to look like random size tile
 concrete overlay to wood floor design

+38

Response time2 days
18 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for A Plus Exteriors LLC
A Plus Exteriors LLC
5.0(
8
)

Serving Shippensburg, PA and surrounding areas

In business since 2015

Free estimates

Warranties offered

"It went wonderfully. The workers were professional and nice. They cleaned my yard every day when they finished working. I had a crumbling retaining wall. But to get to the wall they had to take down an 100 foot vinyl fence. Besides that, my neighbors shed is 3 inches from my property line. They could not bring in any machinery. They dug everything by hand. I was amazed how well they worked together. It really was like an assembly line. They worked fast and good. It took them only 3 1/2 days to finish the project. I’m so glad I decided to use A Plus Exteriors. They get 5 stars from me."
Pavers and Hardscaping Project
Landscaping - Hardscaping & Pavers Project
Landscaping - Hardscaping & Pavers Project
Landscaping - Hardscaping & Pavers Project
Landscaping Project

+74

Recommended by100%of homeowners
Avatar for CTI of NorthEast PA
CTI of NorthEast PA
4.0(
1
)

Serving Shippensburg, PA and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"I love the finished product...just beautiful...especially the wood look...i would suggest you be patient as their business model needs work - ambiguous contract...defensive when I checked out their reviews...id suggest they provide drawing & color samples before work begins...that said. Overall product is quality and just beautiful"
Walkway
Hallmark System
Hallmark System
Driveway
Stairs

+8

Response time10 hrs
Recommended by100%of homeowners
Avatar for Five Star Contracting llc.
Five Star Contracting llc.
4.3(
6
)

Serving Shippensburg, PA and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"Bathroom needed updated and Five Star was able to complete the project in a week. They addressed issues that came up unexpectedly, while also keeping to my budget. They were great to work with as they paid attention to the small details to make my bath appear larger than what it was like moving towel bar, using large patterns, added extra lighting, and installed wall mirrors. Work was clean, professional, and reasonable. Would def. hire again!"
Before
After Exterior
After Interior
Before
After Bathroom

+54

Recommended by83%of homeowners
Avatar for Eco Builder Services Co
Eco Builder Services Co
3.9(
46
)

Serving Shippensburg, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"
  • Met with Gino early June. Original contact with him (he called) was 3 hours after my email on a Sunday! Met with him several times going over what we wanted, gave him architectural drawings of the deck and discussed materials to be used. We had some concerns over attaching such a large structure to the house and wanted to be sure we would have no problems with it shifting or collapsing and to make sure the weight bearing was addressed with all posts etc. He was great to deal with, able to reach easily and quick to sign the contracts and pick up the deposit. I called 3 references, all glowing. All stated Gino's men worked from 7:00am to 7:00pm and finished the jobs in the assigned time and quality of work was excellent. 2 were repeat customers and some even referred him to their friends and actually he was on those additional jobs then. Sounded GREAT!
  • Contracts signed 6-22-12
Promised start date 7-16-12 and quoted a 10-14 day job. The only item not included in our original plans was the railing. We changed our minds and added the railing to the bid on 7-17-12 and paid for supplies and labor for this addition in full. Not once did Gino mention this may cause an extension on the original 10-14 day job time.
Promised start date delayed a week to 7-23-12. No one showed up. We had to call him to see what was going on! He then promised they would be there on 7-25-12, no one showed. FINALLY they showed up on 7-28-12. He offered NO explanation at that time.  
His employees would not show up for days with no explanation. Weather was cooperative. I found the prIncipal problem to be inexperienced employees with little to no supervision, they seem unsure as to what to do. Some errors in work were so obvious I noticed them! All issues we pointed out were corrected promptly.   
Here is a timeline of the work done using my dated photographs as a reference so as to be fair and accurate: 
July 28th-siding removed (3/4 of the back of my home is exposed to the elements). Holes being dug for sonna tubes. (note-they did have to dig in bedrock and actually needed jackhammers for a few of them).
August 3rd-sonna tubes in. 3 long beams in for the base of the deck (extending to the back from the house).
August 7th-framing has been done for the second time. First time they had such a bow in it that a foreman ripped it out and redid it in a day! 
August 13th-started roof beam frame. 
August 15th-roof frame complete.
August 20th-shingles on the roof complete-more siding removed.
August 22-face of the roof completed. (triangle part now solid)
August 25th-face of the roof now has scalloped siding 
August 28th-inside of roof framed for soffit.
August 30th-2 of the 3 columns up, 14 X 22 section of decking almost complete.
August 31st-all decking down, 3 columns done- still no siding on my house. We have been having major water damage to the interior of our home due to heavy rainfall and no siding. Spoke with GIno about our concerns but still no finish date set.
September 7th-railing 3/4 done, still missing siding and steps. 
September 13th railing complete, still needs soffit work and gutters. Siding now beginning to be being replaced but it has been almost 2 months without siding!
September 21st-soffit work completed. Siding is on and has been cleaned with a pressure washer.  Finally able to place my recently purchased furniture (June) onto my deck. Still needs lattice work completed but at least now I can sit on my deck (in a jacket!) Just in time to put the furniture away for the winter!
October 3rd-lattice work complete. Deck finally finished.
 To sum up my experience with Gino and ECO Builder Services:
 The end result was a beautiful deck. He always returned our calls even when he knew we were upset or angry. 
  
What I did not like
The time promised for the job (10-14 days) did not equal the time it took to finish the job! (82 total days/60 work days if you count Monday to Friday).
 When I addressed this with Gino I was met with rude comments, him hiding behind 2 separate contracts of 10-14 days , plus the add on contract (for items he neglected to include in the original bid!) 5-7 days and stating the times listed for each job were consecutive.  While I understand weather may play a part in missing some days here and there, I can assure you that the weather was the least of it. Lack of appropriate workers on site was always the problem.
 
I did not appreciate being bumped for more "important" clients and being the subject of his poor time management skills. Spending $19,000 on a deck and not being able to use it for an entire year is not what I had in mind back in mid JUNE.


"
Recommended by64%of homeowners
Ultimate Precast
New to Angi

Serving Shippensburg, PA and surrounding areas

In business since 2017

Free estimates

Emergency services offered

We specialize in all things concrete. From pouring small walkways to warehouses. We color, patch sawcut and erect all types of concrete. We will do the job right and want to make the customer happy. We have been in business for 4 years but most of our staff have been in the business for more than 15 years. We have over 100 employees and no job is to large or small, we will look at and price any job.

Daryls Home improvement
5.0(
2
)

Serving Shippensburg, PA and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"They took the roof off the existing garage, set down new floor, built outside walls, strengthened garage to hold addition, shingled roof and sided. They installed new windows and as per our agreement, we are finishing the inside work. The work is top class and his workers were professional and worked from early until late each day. Very happy with work. Would highly recommend this builder. He took care of the plans and the building permit."
Recommended by100%of homeowners
Showing 1-10 of 13
FAQs for concrete finishing, overlays & coloring application projects in Shippensburg, PA

With proper care, a stained concrete floor easily lasts 20 years or more. Reapply sealer every two to four years to protect against moisture, scratches, and daily wear. Routine sweeping, occasional damp mopping, and prompt repairs keep the surface looking sharp and protect the slab underneath, preserving both function and resale value.

Stained concrete can crack if the slab is exposed to extreme moisture changes, heavy impacts, or settling. Small hairline cracks are mainly cosmetic, but deeper fractures can affect the finish. Inspect the floor regularly, address moisture issues quickly, and hire a pro for timely repairs. Staying on top of maintenance prevents minor flaws from developing into larger, more costly problems.

The longevity of a concrete stain depends on the product you choose. Acid-based options chemically bond with the slab and are essentially permanent. Water-based stains sit on the surface and can be lightened, darkened, or covered with a new color at a later time. Select the stain type that aligns with your long-term design plans and your willingness to reapply the stain in the future.

You can update the color by cleaning the slab, lightly etching it, and applying a new layer of stain. Re-staining bonds to the concrete and resists peeling far better than paint. For a dramatic shift—such as moving from a dark acid stain to a lighter tone—you may need to grind the surface first. A flooring pro can advise on the best approach for your specific floor.

Stained concrete combines longevity with a modern, custom look. The finish resists heavy foot traffic, moisture, and everyday wear, so upkeep is minimal—routine sweeping and an occasional damp mop are usually enough. Because the color is inside the concrete, it won’t peel or flake like paint. Homebuyers also appreciate its sleek aesthetic and low maintenance, which can add a slight boost to your property's resale value.

The Shippensburg, PA homeowners’ guide to concrete finishing, overlays & coloring applications

From average costs to expert advice, get all the answers you need to get your job done.