
Serving Baker City, OR and surrounding areas
In business since 2008
Free estimates
Emergency services offered
"Great, we started the project during a recent Home Show. Evan came the house and submitted to us a proposal. We set up an appointment for them to install the floor on April 6th. We received a message early the week before telling us that the crew would be there at 7 AM. They were there on time. Took them about four hours to remove the old floor cover, diamond grind the existing concrete, install the base coat and vinyl chips which gave the floor it's texture. <br /> They left for about three hours while the base coat dried. When they returned the covered the vinyl chips with the Polyaspartic covering. They told us to let this dry for about three hours and left about 6 PM <br /> The next morning, right at 7 AM, they returned to reinstalled all the closet doors, and move the washer and dryer back into place. This took about two hours. <br /> The floor looks wonderful and probably will outlive the house <br />"







