Top-rated bathroom remodel pros.

Get matched with top bathroom remodel pros in Clendenin, WV

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Bathroom remodel pros in Clendenin

Avatar for Advanced Construction Concepts
Advanced Construction Concepts
4.9(
81
)

Serving Clendenin, WV and surrounding areas

Angi Approved

Super Service Award Winner

In business since 2000

Free estimates

Emergency services offered

"We had a 2 story deck that was rotting and unsafe. I called several contractors and settled on Advanced Construction Concepts due to all of the positive reviews. Jason came out on the weekend to get the scope and give me a quote. They tore the old deck out in less than 1 day and had the new 2 story deck with a roof done in about 5 working days. They showed up early and worked late and were there every time they said they would be. The work exceeded our expectations and they make sure the customer is happy.. Thanks Advanced Construction Concepts for the amazing work on our brand new deck! If anyone is thinking about getting any work done to their house, please call Jason and ACC. You won’t be disappointed!!"
Response time2 days
18 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for Hall Construction
Hall Construction
4.7(
28
)

Serving Clendenin, WV and surrounding areas

Angi Approved

Super Service Award Winner

In business since 2020

Free estimates

Small jobs welcome

"Hall Construction worked with us to build a new addition. They first removed a flat roof enclosed porch. A new addition was built on the existing foundation with new roof trusses and metal roofing and insulated walls and ceilings. New electrical service was added along with a mini split HVAC system. New flooring, drywall and windows make the room one of our favorite spaces. We also had Hall Construction replace the metal roof on our 80 year old barn. Both projects were completed in the timeframe promised and both were under budget. It was great to find a contractor that helped us get our projects finished. I would not hesitant to hire them again for any other projects that we might have in the future. I highly recommend Hall Construction for any building projects that you might have. My wife and I appreciate the quality work from Hall Construction."
Hall Custom Home
Hall Custom Home
Hall Custom Home
Hall Custom Home
Hall Custom Home

+3

Response time1 day
15 neighbors recently requested a quote
Recommended by82%of homeowners
Avatar for Crown Development, LLC
Crown Development, LLC
4.3(
9
)

Serving Clendenin, WV and surrounding areas

Angi Approved

In business since 2005

Free estimates

Emergency services offered

"They were late first day. General boss was here he never came in or was telling us what was going on when the guys arrived. Guys showed up really had no clue except for a sheet a paper with little information. They area the guys were going to work on would create huge dust I warned then earlier it would be overwhelming worse than drywall. The equipment did not even have a bag to filter fine dust so it just sprayed everywhere. Im not talking light really heavy dust everywhere. Chad refused to supply dumpster even though was on his bid paper when confronted about it he backed out of the contract. House in complete mess an everything just backed out an quit."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

12 neighbors recently requested a quote
Recommended by77%of homeowners
FAQs for bathroom remodel projects in Clendenin, WV

You can buy a replacement vanity by selecting a pre-made unit with an integrated sink from a local home improvement supplier. Pre-made vanities are designed for easy installation and compatibility with your existing plumbing. If a ready-made option doesn't meet your needs, consider hiring a custom builder to create a vanity that fits your space and style.

You can purchase a bathroom vanity from major home improvement retailers like Home Depot and Lowe’s or online stores like Wayfair, which offer a variety of pre-made vanities. Visiting local showrooms and bathroom supply stores can also provide professional advice and help you choose the right vanity for your space.

Installing your bathroom vanity flush against the wall enhances stability and prevents shifting. This placement also eliminates hard-to-clean gaps and keeps your vanity securely in place. Building codes often require a minimum clearance of four inches from bathtubs and at least 21 inches of free space in front of the sink for accessibility and safety.

You can upgrade a single vanity to a double vanity by installing additional cabinets, a second sink, and matching fixtures. This process requires additional plumbing adjustments, countertop modifications, and careful alignment to ensure both sinks function correctly. Upgrading to a double vanity enhances bathroom functionality and offers more space, which is especially beneficial for shared bathrooms.

The best vanity top material depends on your budget, style preferences, and maintenance willingness. Materials like quartz or solid surfaces are excellent choices for durability and low maintenance. If you're on a tighter budget, laminate is affordable but less durable. Consider how much traffic your bathroom gets and choose a material that balances cost, appearance, and upkeep.

Installing a bathroom vanity takes between three and six hours. Simple installations may be completed in under three hours, while more complex projects requiring adjustments or plumbing modifications can take up to six hours or more. The installation process includes assembling cabinets, placing the countertop, installing the sink if necessary, and connecting plumbing.

The Clendenin, WV homeowners’ guide to bathroom remodels

From average costs to expert advice, get all the answers you need to get your job done.