Top-rated kitchen remodel pros.

Get matched with top kitchen remodel pros in Flora, MS

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Kitchen remodel pros in Flora

Avatar for Ball Maintenance and Remodeling
Ball Maintenance and Remodeling
5.0(
7
)

Serving Flora, MS and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Very good. Performed repairs and remodeling in a timely manner. When we had questions, they were answered thoroughly. Recommended many different suppliers, not just one."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Response time2 days
8 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Flora, MS and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
United Roofing & Construction Co McCoy Homes
4.6(
122
)

Serving Flora, MS and surrounding areas

In business since 1985

Emergency services offered

"6/21/2017 – I called United Roofing to get a bid on roof replacement for a small house, 22 squares. Jon McCoy answered and said he would be here to look at the roof on 6/272017. 6/28/2017 I had the written bid in hand. It looked pretty thorough, covered everything we had discussed. I am not in the business and doing the best I can to make sure everything I want is included in the bid. Jon seemed like he knew roofing and he had good reviews. He said that repairing the soffit and fascia boards was not included and added a charge for this after sending him pictures. We agreed to an Additional $1,200 charge. The day of the job, he asked if we had agreed to $800, I said no, it was $1,200. The day after the job, he stated we had agreed to $1,500, I again said no, it was $1,200. Point being – get it in writing. I understood Jon would be providing the wood and labor. I ended up providing the wood just so that the wood matched, otherwise, he was using whatever was available aka scrap. The bid included: a) Tear off all old shingles to the existing wood deck 1 layers You can see from the attached pictures, they first attempted to only partially remove the tar paper and nails. Glad I was on site, Jon was not, and I asked the crew to remove down to wood. I called Jon, he said we do sometimes, sometimes we don’t. So, unless you are there watching, you will never know what you get…. b) Replace all felt underlayment with 30 lb. synthetic type Well, this was completed, but you can see from the pictures – it was completed, but very sloppy. Look at the roof edges. Wood is exposed as the cuts we not very precise. Sometimes they ran the felt through the valley and sometimes not. c) Haul away all old shingles and materials. Well, they got most of it. See (d) below. d) Clean yard of all debris and trash / run magnet I will let the pictures do the talking. Shingles and tar paper is still in bushes and nails in driveway and yard. A box of trash was left in the apartment and chicken boxes left in the yard. e) Replace all vent pipe collars with lead permanent type I do not think this was done. I asked, and he gave me an excuse why he couldn't do it, but would leave collars for the plumbers. I have not found them. The only vent provided was for the ac. However, they disconnected the new ac plumbing to the vent and did not reconnect. **See pictures. f) Install new hot water heater low profile vent (main house) This was not done that I can find. g) Remove and add decking / old existing floor furnace vent (main house) I believe this was completed. h) Install ice and water shield to all valleys I believe this was completed. i) Ventilation: whirly birds (2 on main house) This was completed, but only after I said, where are the whirly birds. Jon did not provide. I made a trip to the local supply house, but they only had one. Jon did supply the next day. j) Install 3- 2x4 rafters, install 3 sheets of decking and add flashing with 1ply base and one ply ice and water (cap sheet ) to back porch extension roof to cover existing step down fascia board to extend under main roof shingles Note: there is a $250.00 charge for item (j) included in the final roof quotes - This was completed but not to these specs. Only replaced one 2x4 and partial decking. I went and purchased a long 10 foot 2x4 and a sheet of decking to finish. One piece of decking fell off the next day – apparently. Maybe the roofers removed but did not replace, I am not sure. **See Pictures Okay, now for the really fun stuff. One of the crew decided to go number 2 in the bathroom. Problem is, the water was turned off and we discovered this the next day. I bought a pale of water over for them to flush. I made no less than six trips to buy supplies that were not supplied on site. Otherwise, they would use what was available – old terrible looking wood. Jon is not on site to oversee the job, he does drop by. He has not come by since the job was completed, to my knowledge. Caveat emptor One of the roofers got stopped by police. I ended up paying the bail bond to get one of the roofers out of jail. I was paid back. Agreement says rotten wood extra - I understood I would pay for the rotten wood decking, the wood, it does not say wood and labor. Typically, in prior roofing jobs I have had, the labor is included but not the wood. Jon brought some scrap wood, looked like from a broken desk, to use for decking. I went and purchased real roof decking to match what we had, but he charged me $425. I already paid for the wood, so I am not sure what this charge is for. The quote included flashing; I understood that flashing or drip rail would be provided. It was not. Jon said if I would buy it, they would install for no additional charge. Yet, he added $100 charge for drip rail installation. They did not want to install drip rail, and did not do a very good job. **See pictures. Other: Left wood nailed up on side of house for ladders - to keep from crushing the drip rail. Summary. I had to spend a lot more time than I preferred - making sure things were done correctly, but overall they did a fair job. When they finished, I made a punch list, they came back and made the requested adjustments. I appreciate that they fixed all the remaining issues without excuses, just jumped in and made it right. I hired a different company to do my next roof and they did a much better job and completed the entire job in two days."
Recommended by96%of homeowners
...
Showing 1-10 of 74
FAQs for kitchen remodel projects in Flora, MS

Your galley kitchen needs adequate clearance around any island installation to maintain functionality. Most galley kitchens lack sufficient width for traditional islands, as these layouts prioritize efficiency in smaller spaces. 

If your kitchen has an unusual width, consult with a kitchen designer who can evaluate your specific dimensions and recommend appropriate solutions. For narrower spaces, consider alternatives like rolling carts or narrow work tables that provide additional surface area without permanently restricting movement.

Kitchen remodels require six to 10 weeks for completion, though timelines vary based on project scope and material availability. Simple updates like cabinet refinishing and countertop replacement might finish within a few weeks, while comprehensive renovations involving structural changes often extend beyond two months. 

Planning stages add approximately four weeks before construction begins. Maintaining clear communication with your contractor and ordering materials early helps prevent unnecessary delays.

Common errors include insufficient clearance between opposing countertops, inadequate lighting that creates shadowy work areas, and poor storage planning that leaves countertops cluttered. Some homeowners select oversized appliances that overwhelm the space or invest in expensive features that don't address fundamental workflow issues. 

Careful planning, accurate measurements, and consultation with experienced professionals help avoid these pitfalls and ensure your renovation successfully addresses your kitchen's specific challenges.

Whether expansion makes sense depends on your home's layout, your budget, and your long-term plans. Combining a galley kitchen with neighboring spaces creates more open, flexible layouts that many buyers prefer. However, removing walls involves substantial costs, particularly if they contain plumbing, electrical systems, or structural elements. 

Sometimes, optimizing your existing galley layout through better storage solutions and lighting proves more cost-effective than expansion. Consult with a contractor to evaluate specific costs for your situation.

Effective galley kitchen lighting combines multiple sources to eliminate shadows and create visual spaciousness. Overhead fixtures provide general illumination, while under-cabinet lighting illuminates work surfaces directly. Consider recessed ceiling fixtures that don't protrude into limited headspace. 

Lighting with dimming capabilities allows adjustment for different activities. Reflective surfaces like glass tile backsplashes or glossy cabinet finishes help bounce light throughout the space, reducing the corridor effect common in galley layouts.

The Flora, MS homeowners’ guide to kitchen remodels

From average costs to expert advice, get all the answers you need to get your job done.