Top-rated bathtub installers and replacers.

Get matched with top bathtub installers and replacers in Jarrettsville, MD

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Bathtub installers and replacers in Jarrettsville

Avatar for Coastal Bath, LLC
Coastal Bath, LLC
4.8(
21
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

Coastal Bath Company is dedicated to providing our customers with the best quality and craftsmanship. We are here to build relationships with our customers and communities and to provide our employees with a great place to work.\n \nCoastal Bath Company is a leader in providing our customers with the highest quality products and craftsmanship in an honest, efficient, and professional way. Our pledge is to create successful relationships with our customers, employees, and community by building trust, treating every project with the utmost integrity, and exceeding expectations.\n \nWe look forward to working with you!

My jobs
My jobs
My jobs
My jobs
My jobs

+10

89 neighbors recently requested a quote
Recommended by21%of homeowners
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
335
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"To begin, I want to say that my wife and I were extremely satisfied with the results of the work VKB did for us. Here are a few reasons why: 1. We initially met with our designer, Mr. Junior Wizart and his associate Sharon, to discuss the work we wanted done. Junior visited our home and walked thru and listened to what we wanted. He provided several suggestions and left to formulate their proposal. We met again the following week and Junior and Sharon walked us thru their design proposal which we were very happy with. We made a down payment and 2. Over the following several weeks, we interacted regularly with Junior and Sharon regarding the details of and the selections for each bathroom. We made a down payment on the May 28, 2019 and signed the contract on 5 June which started the ball rolling. 3. Over the next few weeks we made detailed selections for showers, faucets, floors walls, paint, etc. In some cases, our detailed selections exceeded the budget that was allowed in our signed contract, so a mod was required and adjustments made. All the changes were very easy to implement, and were completed quickly. 4. We had a walk thru in early Jul with the Project Manger, Mr. Jason Freeman, and Mr. Wizart to confirm all selections and installation plans. It was quite thorough and painless. 5. Work began on 7 Jul promptly and the Team Lead, Walter, and his team began the demo. We have an electronic door lock and gave the team their own code for the duration of the project. For 95% of the project, they worked without our oversight. They began after we left for work, and would remain on site until one of us returned from work to show us the results of the day. 6. Every day until the job was completed on August 14, the VKB crew was here working. They were very professional and very thorough. They alerted us when they needed decisions made (height of shower head, placement of body washers, etc. They also asked if they could work on a Saturday to maintain their schedule. 7. Almost every day Jason, our project manager, checked it to see if all was going well and if we had any issues. We had to make several minor adjustments to the design plan, and when we did, it was completed painlessly. The team kept the walkway into the house covered and cleaned up daily. Trash was picked up regularly and there was no need to a dumpster. 8. We were so happy with the performance of the bathroom work, that we hired VKB to renovate our kitchen backsplash. Junior helped pick out the colors and style of tile, and Jason's team did the installation in two days. 9. The entire 3.5 bath renovation work was completed and the final payment made on August 14th. We we so pleased with the work VKB performed for us that we hired them to renovate our basement that was damaged severely due to a failed sump pump and the resulting water backup."
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
6 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for West Shore Home Mechanicsburg
West Shore Home Mechanicsburg
4.7(
1,106
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 2006

Free estimates

Warranties offered

"My mom and brother needed to have their bathtub replaced with a step in shower. Johnny, Brandon, and Brett came and did a great job with the installation. They came on time, answered all our questions, had to quickly catch up with a recent change order we had done with the main office in Mechanicsburg, and did the removal and install in a day. Everything was handled with efficiency. The installers who worked on our project were wonderful. We love the new shower. It is beautiful. I would highly recommend this company."
Levine
Levine
Levine
Levine
Levine

+45

Response time50 mins
418 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Long Home
Long Home
4.3(
211
)

Serving Jarrettsville, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1945

Free estimates

Credit card accepted

"It was a great experience. We are very happy with our new tub/shower. Quality materials and awesome service from beginning to end. Installation took a day and the installers were knowledgeable and had excellent customer service skills."
Wet Area Replacement
Wet Area Replacement
Response time6 hrs
415 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Perryhall Remodeling
Perryhall Remodeling
4.9(
327
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 1980

Free estimates

Warranties offered

"Gary Jr. was my contact through the process and managed the replacement very well. He was personally on the job and communicated with me from start to finish. I am very happy with the results and will hire again."
Additional Photos
Additional Photos
Foyer-after
Additional Photos
Fireplace Before

+23

Response time1 day
2 neighbors recently requested a quote
Recommended by99%of homeowners
Avatar for Premier Home Pros, LLC
Premier Home Pros, LLC
4.1(
104
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"We had our shower area replaced and the install took 1 day. The team was very knowledgeable and helpful and the shower was customized to my liking!! Would highly recommend !!"
Beautiful Shower
Stunning Tub
Beautiful Bathrooms
Beautiful Bathrooms
Beautiful Bathrooms

+3

196 neighbors recently requested a quote
Recommended by39%of homeowners
Avatar for JD Michael Construction Inc
JD Michael Construction Inc
4.9(
57
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 1989

Free estimates

Warranties offered

"JD Michael Construction supported all activities associated with our new build from property review, site selection, demolition, land survey, all facets of permitting for new home construction, all aspects of subcontractor management, overall project management, architectural review, framing, drywall, painting, cabinet installation, siding, window installation, trim and door installation, custom built stairs, kitchen/bathroom design, driveway installation, concrete slab construction, local public works liaison, plumbing, electrical and post production activities. This is our fourth project with JD Michael Construction and we look forward to many more in the near future."
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Additional Photos
Additional Photos

+13

Response time2 days
4 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for David Rutch's Precision Remodeling Inc
David Rutch's Precision Remodeling Inc
4.8(
123
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"When we first met with Dave the consult was very informative and relaxing. There was no pressure and Dave listened to what we wanted in our kitchen and how we envisioned the final product. My wife's primary request was to have an island as the focal point of the kitchen, Dave simply said tell me what you what and we'll make it happen. Once we discussed our ideas, Dave explained the complete process and scheduled a time to meet with his design team. The design phase was the most enjoyable part of the project, we picked out cabinets, flooring and counter tops and were able to see the kitchen come to life in front of us. We absolutely loved the design and his design team were able to meet all of our requests. After a few days Dave was able to provide us a final estimate and a time table for the project. The first estimate was a little over our budget however Dave was wonderful working with us to make changes in order to get the project within budget. He was extremely patient and actually provided 6 different estimates in order for the project to meet our needs. After we agreed to move forward we met with Dave again to discuss final details and the time table for the remodel. He explained the complete process, including demolition, would take 3-4 weeks. A big concern with a two and five year old was not having a kitchen sink for weeks on end, Dave assured us that we would have a working sink within 2 weeks. When the project began Dave and his crew arrived at 8am and got right to work. Dave's crew was extremely friendly and very informative during the whole process. With two small children and two dogs they very conscience with safety and cleaned up every evening when they were finished working. Through out the install Dave was fantastic about sending texts every night with progress updates and what was in store the next day. The demolition was complete within two days, that's even with a surprise of having to remove four layers of flooring under the existing floor. After the first week, flooring and electrical was complete and cabinets were installed the second week. When unpacking the cabinets Dave's crew pointed out two slight defects with the cabinets; to us it wasn't a big deal but the professionals that they are, they refused to install them and insisted the factory ship two new cabinets sections. It took a few days for the new cabinets to arrive and they were able to swap out the defective units with no delays to the project. During the third week granite was installed and the plumbing was complete; we finally had our sink back, to the day that Dave promised. By the end of the week the kitchen was almost complete, electrical was finished and lighting was installed. During the final week the painting and back splash was finished, hardware was installed on the cabinets and with that, our dream kitchen was complete. The finished product was even better than we could have envisioned, the transformation from before to after was amazing. So again, if you're looking to remodel your kitchen the search can stop here, Dave Rutch's Precision Remodeling is truly the best of the best......as you can see the finished product speaks volumes."
Additions
Additions
Additions
Additions
Additions

+142

Response time2 days
10 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for WALTERS HOME IMPROVEMENT
WALTERS HOME IMPROVEMENT
4.7(
27
)

Serving Jarrettsville, MD and surrounding areas

Approved

In business since 1980

Free estimates

Emergency services offered

"I hired Walter Howard to renovate the master bathroom.  He was professional in every respect from the initial estimate to final completion of the job.   The job required removal and replacement of shower, toilet, sink, cabinets, and all fixtures; installation on new lighting, ceiling fan, new GFCI, tile floor and trim and new paint.  He and his team arrived promptly, did their work in a competent and confident manner and ensured the job site was clean before they left for the day.  He completed the job on-time and on budget, and my wife is delighted with the results.  I was so pleased with the work he did on this project, that I hired him to do our hall bathroom.  If you are looking for an experienced, reliable and high quality contractor, I strongly recommend Walter's Home Improvement.  His prices are reasonable and the work is first rate.

"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

3 neighbors recently requested a quote
Recommended by86%of homeowners
...
Showing 1-10 of 195
FAQs for bathtub installation and replacement projects in Jarrettsville, MD

Most tubs last an average of 20 years, or closer to 10 to 15 if they’re acrylic or fiberglass. If you’re seeing persistent leaks, cracks, stubborn stains, or mold that won’t scrub away, it’s time to start shopping for a replacement. Out-of-date features and visible water damage are other red flags. Swapping the tub now protects your bathroom from bigger (and pricier) repairs down the road.

You should install your tub in a location that complements your bathroom's layout, plumbing connections, and personal preferences. Consider placing it near existing plumbing to minimize installation costs. Many homeowners position their tubs to take advantage of natural light or scenic outdoor views, enhancing relaxation. 

Ensure there's sufficient space around the tub for easy access and safety, especially if accessibility is a concern. Ultimately, the ideal spot is where the tub fits seamlessly with your bathroom design and provides the most comfort and convenience for your needs.

Replacing a bathtub takes just one or two days if you hire a pro to handle the job. They'll remove the old tub and install the new one efficiently. If you're considering doing it yourself, be prepared for it to take much longer, possibly up to a month. That's because you'll need to remove the old tub and drywall, install the new tub, repair the walls, and maybe tackle new tiling. Weigh the time commitment against potential cost savings to decide what's best for you.

Converting your tub to a shower transforms your bathroom with a modern and accessible design. The average cost to convert a tub to a shower ranges from $2,000 to $10,500, based on the required plumbing, tiling, and structural modifications. This upgrade maximizes space while boosting functionality and aesthetics in your bathroom.

The Jarrettsville, MD homeowners’ guide to bathtub installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.