Top-rated vinyl siding repair or partially replacers.

Get matched with top vinyl siding repair or partially replacers in Massapequa, NY

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Vinyl siding repair or partially replacers in Massapequa

Avatar for Brothers Aluminum Corp
Brothers Aluminum Corp
4.7(
158
)

Serving Massapequa, NY and surrounding areas

Approved

In business since 1980

Free estimates

Warranties offered

"I cannot thank Paul specifically for putting up with me! From the beginning I had a vision along with a number of pics from Pinterest of what I wanted my house to look like. For starters my home was covered in old stucco and a lot of rotted wood underneath which was a messy job to remove. His team actually not only replaced all the damage but even removed my front living room window, reframed and replaced, as well as sheet rocked, spackled and painted the inside seamlessly. Paul stated the entire process would take 2-3 weeks. Well not only did this transformation complete in just under two weeks but either Paul himself or someone from his team stopped by daily to check on the job. Any questions or concerns were answered immediately and his crew were an absolute pleasure to deal with. I can sincerely recommend Brothers Aluminum to anyone looking to have any construction done to their home!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Response time1 day
18 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for BuildingLI.com - BLI Facilities LLC
BuildingLI.com - BLI Facilities LLC
5.0(
25
)

Serving Massapequa, NY and surrounding areas

Approved

In business since 2017

Free estimates

Emergency services offered

"We were extremely happy with the work performed by H&M. Moises, Hector and crew were courteous and did whatever needed to please us. They did most of the renovation in our condo......painting, installation of bathroom cabinets, sink, installed tile floor, etc. They also installed vinyl flooring in our kitchen, living and dining rooms. They had a plumber replace our heating baseboard, I would highly recommend H&M if you want excellent work done!!"
before demo
kitchen demolition
demolition complete
kitchen tile job in progress
kitchen tile

+168

Response time7 hrs
Recommended by76%of homeowners
Avatar for Premium Roofing & Siding, Inc.
Premium Roofing & Siding, Inc.
4.9(
159
)

Serving Massapequa, NY and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Premium Roofing staff were amazing. Originally hired to fix vinyl siding and the team discovered an issue with the chimney and fixed professionally. Quality work was great, and timely. I would highly recommend the Premium to any of my neighbors "
chimney LEAD flashing
chimney flashing
repair
repair
repair

+106

Response time9 hrs
20 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Selective Remodeling
Selective Remodeling
4.8(
78
)

Serving Massapequa, NY and surrounding areas

Approved

In business since 1996

Free estimates

Warranties offered

"With me, it’s not just about the job, it’s about how these guys made me feel. I feel important to them, respected and a priority. I feel as if they are interested in my daily opinion. They want to please me as a customer. They respect my feelings, my suggestions and opinions. From start to where we are now, I am ahead of schedule on the kitchen. They are here when they say they will be here. They understand I am living out of the garage and dining room. They respect that I have a child who has needs while they are here. They stay past 5pm until the work is done. They check up on my progress daily. Mike and Dominick come to see the work often. I can trust their workers with my house/property when I am not home. I can go to work and not worry about what’s happening with my house. I also don’t have to pay all at once. They broke up the entire amount into percentages so I pay as we go through the weeks. They schedule all the work/specialists so I don’t have lag time or issues getting steps completed. They make sure my job is up to code. And most importantly, they clean up before they leave, inside and outside. I can’t tell you how important that is with a child and a cat. I don’t have to worry about him getting into the tools or garbage. I also trust that they will do what it takes to keep me satisfied as a customer. They listen to my concerns/comments as you can see each day whether at my home or over text (my preferred method of communication). They came up with a timeline that was loose so we could tweak plans when necessary and so I could plan my life around the renovations. I am pleased at the progress made so far and look forward to using my new kitchen! See what's gone on below! WORK SCHEDULE SO FAR July 17, 2016, Monday 6:45am Dumpster arrives July 18, 2016, Tuesday 8am the crew of 5 men arrived. The put plastic up around the back room and doors so the sawdust would be contained. They had the entire kitchen demolished by 3pm. The dumpster was filled. They vacuumed and left. What was planned for 2 days took 1. July 19, 2016, Wednesday Electricians and Plumbers came 8am. They found some areas not up to code and fixed the problems. Left at 4pm. I believe Mike arranged to have the specialists come at close times. It seemed when one left, someone else pulled up 30 seconds later. Talk about SERVICE! HVAC came at 4:45pm to look at what items would be needed and promised to see me the next morning. I was amazed so much got accomplished in such a short time. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. I gave him another check after he reviewed some of the financials with me. He makes it easy to not have to have all funds upfront. I feel more comfortable with this way. He plans it in percentages. Sometimes there are additional expenses such as more electrical work than was planned/billed for so that was an addition but these things are expected. I am trying to go with the flow. Changes happen. July 20, 2016, Thursday HVAC Mike came at 7am so that the wall guys would not have him in the way. We decided together to move two vents from the floors to the walls. He updated the heating vents and spent 3 hours making it to code. Walls went up as HVAC Mike worked. Ceilings were put up and 2 coats of Spackling. James, Jorge and Freddy did a terrific job. Neat, fast and looked great. I was very pleased with the work. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. Framing and Sheet rocking was planned for 4 days. It took 2. We were ahead of schedule. July 21, 2016, Friday James did a third coating of Spackle. He painted a first coat of my Soft Fern green color and the ceiling white. Dominick came by to check on the work/progress and see how we were doing. James vacuumed and cleaned up before he left. My husband found some areas he wanted addressed and I texted his concerns to Dominick. Dominick shared it with Mike. I didn’t want to bother Mike since it was the weekend, but Dominick felt our concerns were important. They were addressed Saturday morning. July 22, 2016, Saturday 8:30am. Eddie and Javier arrived to work on the floors. They nailed down the wire mesh which was a job that took all day. Tile needed to be cut as well. They left the place clean and neat. July 23, 2016, Sunday DAY OF REST July 24, 2016, Monday 8:45am. Eddie and Javier needed to mud the floors to make them level which they were not. One side needed to be higher than the other. Eddie and Javier worked very hard and left at 7pm after they cleaned up. It was a very long day for them. Mike made arrangements with the appliance store to deliver on August 1. July 25, 2016, Tuesday 8:45am. Eddie measured and laid the time on the leveled floors. It was a terribly hot day and Javier had to lug cement and cut tile in the heat. I felt so bad for him. He never complained and worked so very hard. The floors looked great but Eddie felt like it was not looking right so he lifted three rows of tile and did them again to get it right. He felt he wanted perfection and I appreciated that. I complimented him and shared that with Mike when he came to see the progress. They left at 5:30pm and planned to come back for the Backsplash when it was time. 4 days were planned to do the job. It took 3. July 26, 2016, Wednesday Freddy and Jorge came to work on making saddles and putting up molding around the doors and window. Freddy was so funny. He kept cleaning and I told him to not worry about the dust on the doors, that I would take care of it later. He was so concerned about keeping the place clean for me. I told him it was impossible since there was so much cutting of wood. Jorge spoke to me about the saddles and I made suggestions. He asked my opinion and he made it to my specifications such as overlapping the saddle to the stair for safety. They cleaned up and I was pleased to find out we had several days off to have family time instead of having construction. July 27, 2016 Thursday Jorge and Freddy came to complete the saddles and woodwork. Once again, outstanding! I left them alone all day while I went to work. I had no worries. I also knew Mike stopped by often at the site to check on progress but I trusted them completely. July 28-31, 2016 REST August 1, 2016, Monday Cabinet specialists Anthony and Paul arrived. They worked from 8:45-5pm. They put cabinets up, cut and measured over and over. They said, "Measure three times, cut once." They were very nice, knowledgeable, spoke kindly to my son and had a smile and a kind word to me most often during the day. August 2, 2016, Tuesday Cabinet guys arrived at 8:45am. I went to work and when I came back most of the cabinets were up. Since the floor was 3 inches higher than anticipated, they called Scott at Selective Sculptures to order a smaller cabinet so they would not have to cut it. The cabinet would arrive Thursday. August 3, 2016, Wednesday I called Mike to tell him I am taking a day of rest. August 4, 2016, Thursday Cabinets are done! Paul and Anthony arrived at 8:30 and they were completed by 5pm. They vacuumed and touched up the cabinets. They put the shelves in for me and discussed how to care for my cabinets. They put up the crown molding and asked my opinion about where I wanted the handles to go on the cabinets. Mike came by to see how it was progressing, to get a check from me and to plan the coming week of work. He's planning on my refrigerator and stove going in and working on Monday. As you can guess I'm tired of washing dishes in my bathroom and am grateful it's going to happen so quickly!"
Towers Renovations
Beier Bathroom
Deleon Kitchen
Deleon Master Bathroom
Deleon Master Bathroom

+279

Response time3 days
2 neighbors recently requested a quote
Recommended by93%of homeowners
ALB Home Improvement, Inc.
4.9(
185
)

Serving Massapequa, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Customers say: True professional

"Albert & Johnny replaced siding on my house From the time they came to give me an estimate to the time the job was complete was only 2 days. They explained the process of how they were going to do the repair, was able to match the new siding to the existing siding and they did an amazing job! They were very professional, friendly ,reasonable, reliable and very neat. They did not leave until we were completely satisfied with their work. I would highly recommend them. Great job!!"
Roof repair
Roof repair
Install new System
Install roof
Roof repair

+97

Response time5 hrs
Response rate98%
214 neighbors recently requested a quote
Avatar for Four Seasons Roofing
Four Seasons Roofing
4.8(
137
)

Serving Massapequa, NY and surrounding areas

Approved

In business since 1983

Free estimates

Emergency services offered

"Four Seasons Roofing installed a Diamond Roofing System on my house on 10/23/18. The whole experience was exceptional. Bill Taylor arrived on time on 10/13/18 to provide a free estimate for the roof removal and replacement. He explained the entire job in detail and was very knowledgeable and attentive to our needs. In addition to roof replacement, the chimney needed a new crown and regrouting. Also new gutters needed to be installed. I had received a call from their office staff to schedule installation date and expected time of arrival. The crew and material arrived 7:00AM as expected and work started immediately. This team was very professional and hard working. I was very impressed with the quality of work ethic and product they provided. I would highly recommend them for anyone who requires roof repairs or replacement."
GAF Preferred Contractor Badge
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Response time2 days
12 neighbors recently requested a quote
Recommended by92%of homeowners
Avatar for Non Stop Home Improvements Inc
Non Stop Home Improvements Inc
5.0(
56
)

Serving Massapequa, NY and surrounding areas

Approved

In business since 2004

Free estimates

Emergency services offered

"Was able to schedule same day appointment to repair a large piece of siding that was about to fall off due to wind. Easy to schedule. Came on time and delivered as promised. Would hire again."
New Roof - Setauket
New Roof - Setauket
New Roof - Setauket
New Roof - Setauket
New Roof - Setauket

+12

Response time1 day
10 neighbors recently requested a quote
Recommended by98%of homeowners
Showing 1-10 of 31

The Massapequa, NY homeowners’ guide to vinyl siding repair or partially replaces

From average costs to expert advice, get all the answers you need to get your job done.