Top-rated shower installers and replacers.

Get matched with top shower installers and replacers in Nashville, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Shower installers and replacers in Nashville

Avatar for Premier Home Pros, LLC
Premier Home Pros, LLC
4.4(
90
)

Serving Nashville, IN and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"Our installers Raphael and Verushka were absolutely amazing. Hard working very lovely people who know exactly what they are doing. They get a 10++. Chris that came out with them was also a very nice person. On our frosted shower doors I give nothing. I am so upset with them I don't have words. You see them from the side view walking into my small bathroom and all I see is green. I was told that is how they come and cannot replace them unless we come up with over $1000.00 for clear. (sorry but can't imagine how they could cost that much just for doors only. They have to come back out anyway because you guys packed the wrong shower handles). You should train your salesmen to let people know that frosted glass on shower doors have that awful green hue and at a sideview it will be apparent. If looking at them straight in they wouldn't be bad but sideways they are awful. I am so upset after finally saving enough in our retirement to get this shower that it looks like that."
White Stone Walk-in
Shower/Tub Combo
Glass Door walk-in
Accessibility
Stand-alone tub

+1

170 neighbors recently requested a quote
Recommended by77%of homeowners
Avatar for Mad City Windows & Baths
Mad City Windows & Baths
4.4(
827
)

Serving Nashville, IN and surrounding areas

Approved

Super Service Award Winner

In business since 2001

Free estimates

Warranties offered

"Replaced a walk-in shower. Removal of the old and installation of the new took approximately 8 hours. We are pleased with the product and the installation"
windows
siding
siding
siding
windows

+20

Response time10 mins
6211 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Superior Bath System
Superior Bath System
4.6(
79
)

Serving Nashville, IN and surrounding areas

Approved

Super Service Award Winner

In business since 2006

Free estimates

Warranties offered

"Wonderful experience, superior bath replaced a bathtub with a walk-in shower. This is the second replacement shower done with them in the last two years and both look amazing. Installers were professional, courteous, kept the work area clean during the installation process. Very satisfied."
Carmel #1
Carmel #2
Shower Arera
Bathroom
Vanity

+15

Response time1 day
132 neighbors recently requested a quote
Recommended by49%of homeowners
Avatar for Witsman's Home Improvement
Witsman's Home Improvement
4.8(
2
)

Serving Nashville, IN and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

Witsmans Home Improvement should be your top choice when it comes to all of your electrical needs. We specialize all aspects. including new construction and panel upgrades. We provide all of our customers with a strong combination of excellent customer service and top quality products! Let us accommodate your needs with our qualified staff. When you are looking for the best, don't settle for less!! Call on Wink Electric when you want the job done right the first time, every time!

Recommended by100%of homeowners
Avatar for Mgm pro remodeling
Mgm pro remodeling
New to Angi

Serving Nashville, IN and surrounding areas

Approved

Free estimates

Emergency services offered

Hello, I’m Moses. I’m proud to be part of a dedicated and skilled team that truly understands the importance of keeping your home comfortable and safe. We specialize in plumbing, HVAC, and electrical services, and we’re here for you around the clock. Whether it’s a leak, a sewer backup, or an HVAC emergency, you can count on us to respond quickly with care and expertise.\n\nWe recognize that unexpected issues can be stressful, and we strive to alleviate that burden by offering competitive prices because we value your hard-earned money. Our goal is to provide you with not just solutions but also peace of mind. Don’t hesitate to reach out to us; we’re committed to delivering outstanding customer service and high-quality work that you can trust.

2 neighbors recently requested a quote
Avatar for Top Notch Tile Inc
Top Notch Tile Inc
4.8(
59
)

Serving Nashville, IN and surrounding areas

In business since 2003

Emergency services offered

"I hired Top Notch Tile to build a shower base and install tile as part of our new home construction.   They demonstrated professionalism and expertise from the start during the assessment and quote process.  After getting quotes from others, I found Top Notch's quote to be very competitive.  They recommended tiling the shower walls all the way to the ceiling (9 ft walls) and also tiling the shower ceiling, whereas some of the competitiors only wanted to tile the walls up to about 6.5 feet.  When I made the decision to go with Top Notch, we were on a time crunch to get the house finished and move in.  Dennis agreed to work the July 4 holiday weekend, including Saturday.  I really appreciated this.  The workmanship they did for us is excellent.  We are very pleased with the outcome.

"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Recommended by96%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Nashville, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
...
Showing 1-10 of 53
FAQs for shower installation and replacement projects in Nashville, IN

Replacing your tub with a shower can modernize your bathroom and improve accessibility, often providing a high return on investment. However, if it's the only bathtub in your home, removing it may decrease resale value, as many buyers look for at least one bathtub. Consider your long-term plans and consult a real estate professional if resale value is a concern.

While showers cost slightly more to install than tubs, the overall expense depends on various factors such as materials, size, and features. A tub installation costs $2,400 to $8,800 on average, whereas showers average $2,000 to $9,400. Custom designs, luxury fixtures, or extensive plumbing work can increase costs for both options. It's important to assess your specific needs and budget when deciding between installing a shower or a tub.

Converting a tub to a shower generally takes between one and three days. The timeline depends on the complexity of the project, materials chosen, and whether plumbing modifications are necessary. Installing a standard prefabricated shower can be completed quickly, while custom tile work or extensive plumbing changes may extend the project's duration. Planning accordingly can help minimize disruptions during the conversion.

Converting a tub to a shower offers several benefits, including saving space and making your bathroom feel more open and modern. Showers improve accessibility, especially for those with mobility challenges, by eliminating the need to step over a high tub wall. Additionally, updating to a stylish shower can enhance your bathroom's aesthetic appeal and may increase your home's resale value if another tub is available elsewhere in the house.

Choosing between a shower stall and a custom shower depends on your budget and preferences. Prefabricated stalls are less expensive and faster to install but offer limited styles. Custom showers allow personalization of size, materials, and features but cost more and require professional installation. Evaluate your needs and budget to select the best option for your space.

If you’re converting a tub to a shower, you may want to consider remodeling your whole bathroom. The ROI on bathroom remodels is high (over 70%), so you can enjoy an upgraded bathroom while you live in your home and get your money back if you decide to sell later. The average cost to remodel a bathroom is around $6,600 to $16,600, so factor in this price range when you’re budgeting for your project.

Converting a tub to a shower alone isn't easy to DIY, so look for a bathroom remodeler near you if you decide to take on a larger bathroom remodel to ensure it's done correctly.

The Nashville, IN homeowners’ guide to shower installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.