Top-rated major renovation multiple room pros.

Get matched with top major renovation multiple room pros in New-richmond, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Major renovation multiple room pros in New-richmond

Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)

Serving New-richmond, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"I rarely, if ever give 5 star reviews. But, I DO recommend Maynor Construction (MC)! But, 5 = perfection, and nothing is perfect : ) I hired MC for cement siding and sunroom addition project, beginning in June of 22, ending Sep, 22. I will review the Good, the Bad, and the Ugly. But, this doesn't cover everything, because Home Advisor only allows so many characters. Finally, this was my first (major) home improvement project and likely the largest investment I will ever make in my home. The Good - Maynor (owner) is a very knowledgeable and a skilled builder, with many years of experience. I appreciated that he was actually on site many days, not only supervising, but also working along side his team. - The administrative staff was magnificent. Responsive, knowledgeable, friendly, and available. Having the right people in the front office can make or break a business. Hire the right people to manage the office and it will pay dividends toward the success of your company...in my humble opinion. - I had fiber cement siding installed on my home, and a sunroom that replaced an old, broken-down outdoor breezeway. This was no easy project and teams of highly-skilled workers were at my home daily, typically from before 8am until nearly sundown - and even partially on Saturdays. We were blessed with very little rain through the 3 months, which accelerated the work. Maynor's team worked very hard, moved efficiently, and maintained a great level of skill throughout the process. The Bad - For the most part, none of my utilities were affected all that much. Utility boxes were moved away at the beginning, were moved back at the end, and worked just fine. I also had a lot of electrical added and moved throughout the project, but alterations and small inconveniences were to be expected. However, there was a problem when it came to Maynor's (unintended) disruption of my ATT Fiber. While there was no cutting of that fiber, the siding was installed over the fiber and it shut down my internet. Maynor's workers claimed innocence, but it was clearly something for which they were likely responsible. The fiber cable box was moved back into place, and when I got home the internet wasn't working any longer. This required ATT to come out and reinstall the fiber cable and box that came into my house from the outside. - Kitchen flooring fix. I have a very small special strip of (tiled) kitchen flooring that had to be removed during the remodel because I wanted a small portion of a wall removed. Years ago, this strip was created with very cool, colored, (intentionally) broken glass tiles. But, sadly those tiles are no longer available. Happily, I found some of the original kitchen tile that Maynor could break-up into pieces and install into the strip. I approved a change order for Maynor to fill-in that strip of flooring, which required some pretty major cutting of the floor and sub floor. However, they cut the floor crooked and at an unpleasing angle. And, while it is not terrible, it is very noticeable to me and I wish Maynor had done a better to cut the area straighter. I can live with it, but someday I will need to replace the entire kitchen floor to maintain the professional look. The Ugly - While I live in a populated area, with restaurants, a gas station, hotels, etc... workers, laboring in extremely hot summer conditions, even with lots of shade, require lots of hydration. Those fluids need to go somewhere! Unfortunately, there were at least two instances (likely more), I personally witnessed workers finding their own ways to relieve themselves - not inside my home, nor at the gas station just next door. I complained to Maynor and they promptly brought in, at their expense, a Porta Potty, which would remain for the duration of the project. But, I had to ask them to include and only after I discovered what was happening on my property. Ove..."
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
10 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for The Refiner's Collective
The Refiner's Collective
5.0(
1
)

Serving New-richmond, IN and surrounding areas

Approved

In business since 2015

Free estimates

Credit card accepted

At The Refiner’s Collective, we take pride in being a central Indiana, third-generation construction company with a rich heritage and a commitment to excellence. We are a collective of people, skills, and strengths who are passionate about revitalizing old spaces and building new ones. Whether you need a room remodel, a complete home renovation, or are building a new home, our team has the expertise to take your vision to reality. At the core of our philosophy is an unwavering commitment to honesty and reliability. We understand that building or renovating a space is a significant investment. That’s why we always strive to deliver exceptional workmanship, use high-quality materials, and maintain open, transparent communication. We know every project will have it’s challenges, and no home is perfect. What matters most is that those challenges are handled with transparency, care, and high-level problem solving.\n

Response time3 days
Nunez General Construction Llc
New to Angi

Serving New-richmond, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

Avatar for Innovative Cabinets & Closets
Innovative Cabinets & Closets
4.9(
389
)

Serving New-richmond, IN and surrounding areas

In business since 1985

Free estimates

Credit card accepted

"From start to finish , it went really well. I wasn't sure how to use my 8x4 closet space to its maximum. Willie came in and his eye for what would work for me was wonderful. His designs were great. The cabinet in dining room turned out perfect too. The installers were great also. Highly recommended."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
BEFORE

+37

Recommended by97%of homeowners
Avatar for Top Leader Construction, Inc.
Top Leader Construction, Inc.
4.9(
122
)

Serving New-richmond, IN and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"We can't say enough about Top Leader Construction. Like many people, we had to make a decision on if we should renovate our existing home or sell and try to find a new home. Ultimately we made the decision to hire Ron to design and build our dream home, specifically renovating the kitchen, adding a new family room addition, and building a master suite. From day one we knew we were in good hands. Ron listened to our needs and came up with a great plan from concept to design. Work began and the amount of care for our home, lifestyle, and craftsmanship was evident from the beginning. We are now using our completed kitchen and family room every day and it has become the center of our home. The attention to detail and building exactly what we wanted was unmatched. The team communicated with us constantly and everything was completed on time. As happy as we are that the job is done, we will miss seeing the entire team. We could not be happier with how the entire project went and would highly recommend to anyone."
Complete Kitchen remodeling
Modern KItchen Remodeling
Restroom Remodel
Kitchen remodel
Kitchen Remodeling

+388

Response time3 hrs
Response rate98%
Recommended by91%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving New-richmond, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for Wood Renovation Inc
Wood Renovation Inc
4.6(
38
)

Serving New-richmond, IN and surrounding areas

In business since 1987

"I hired Wood Renovation to power wash and stain my deck as well as replace some rotted boards. They did a good job replacing the boards, but they also missed a rotted board, which was not replaced. They did a good job power washing and staining the floor of the deck, but they only used one coat of solid stain on the floor, which was not enough. The Sherwin Williams stain they used even says to use two coats. The ornamental caps that sit on top of the balusters were covered with old, chipping paint, and they did not sand them prior to staining. The owner, Steve, indicated that he normally doesn't include sanding in a bid, but he did come out and try to sand off some of the chipping paint. They also used a paint sprayer for the deck railings, which did not completely cover any of the railings and instead got on my landscaping. I had to have Steve come back out two different times to touch up every railing. Fortunately, he was very nice and accommodating about it. Overall, the quality of the work was not worth $996."
Recommended by88%of homeowners
...
Showing 1-10 of 132

The New-richmond, IN homeowners’ guide to major renovation multiple room services

From average costs to expert advice, get all the answers you need to get your job done.