
Serving Oak Harbor, WA and surrounding areas
Approved
In business since 2012
Free estimates
Warranties offered
"Nice and very solid installation"


Serving Oak Harbor, WA and surrounding areas
Approved
In business since 2012
Free estimates
Warranties offered
"Nice and very solid installation"
Serving Oak Harbor, WA and surrounding areas
In business since 2016
Small jobs welcome
Credit card accepted
"On time, more than reasonable, very knowledgeable."





+35

Serving Oak Harbor, WA and surrounding areas
In business since 2010
Free estimates
Emergency services offered
"Wonderful job. Great people to work with. I'd recommend them to anyone."





+15

Serving Oak Harbor, WA and surrounding areas
In business since 2020
Free estimates
Emergency services offered
"Scotty and his team did a great job on our handrails. Scotty made sure that we were completely satisfied with the new handrails. I would recommend this company to anyone needing handrails. They did a great job!"



Serving Oak Harbor, WA and surrounding areas
In business since 2017
Credit card accepted
Offers commercial services
"1. They gave me a price for a repair and it was competitive. 2. They were honest to tell me that I only need to repair and not to replace my entire roof. 3. They did a quick and good work. (No leaks since then). 4. We financed the work. 5. Excellent communication."

Serving Oak Harbor, WA and surrounding areas
In business since 2022
Free estimates
Credit card accepted
"I hired upper left handyman services to come repair my fence. Chris did an amazing job for a good price. He made sure my animals could still go outside while he did the fence and was super nice. I would call back for any repairs needed!"





+14

Serving Oak Harbor, WA and surrounding areas
In business since 2020
Free estimates
Emergency services offered
"Company was very good. They are very conscience about the job was done. Great overall service."





+7

Serving Oak Harbor, WA and surrounding areas
In business since 1995
Free estimates
Credit card accepted
"They did a great job! It was quick, and they cleaned up. They put ashalt shingles on a 12x12 gazebo. In and out. It looks really nice. Thanks again, Miguel."





+14
Serving Oak Harbor, WA and surrounding areas

Serving Oak Harbor, WA and surrounding areas
In business since 2005
Free estimates
Credit card accepted
"TLDR; Driving progress is up to you. Painter is incompetent. Will miss every deadline. No green building acumen.
I hired Joe to add a bedroom to my house and pour a concrete pad for another room. It was a straightforward project he estimated would take 2.5 months (10/1-12/15). He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25. From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered. Within a month the trusses and roof were on and the windows were installed. So far, so good, but this was all done by one sub.
Then things started going in slow motion. I moved out for the month of November so they could get the dusty indoor work done without disturbing my family. There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall. Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates. Although he said he could provide one, he never did.
He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump. I had to push out that date by 2 weeks. Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect. The first one, the sider didn?t show. I wasn?t around for the 2nd one. The third time he sent a sider who had never worked with outsulation before. To his credit, he paid for the 3rd meeting. Although the architectural drawings went into explicit detail, the sider required handholding to understand them. My architect was visibly frustrated explaining the installation process to him over the language barrier. The sider charged $8000 for 4 days of work. It was $2900 over Joe?s original bid. This seemed high for 2 reasons. 1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600. 2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help. When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price. Not buying this explanation, I called the sider myself. I asked him if he had provided Joe with a bid before he started working and he said no. I asked him if Joe had asked him to come down in price and he said no. So Joe essentially wrote him a blank check with my money.
By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained. I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out. I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible. Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines. Joe went back into slow motion. I?ve attached a full timeline so you can get a taste of this.
Probably the biggest debacle of the project was the exterior painting. I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice. Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.? More and more rain kept coming, so they covered their sprayer to protect it while they continued painting. Then it started a downpour. All the paint washed off. They returned the next day to continue. It rained again that day. They didn?t prime any of the bare wood and painted it while it was soaking wet. Not surprisingly, very little of it adhered to the wood. I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining. But the paint job looks terrible. There remain bubbles, drips, uneven coloration and almost bare wood in places. (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right. Joe has repeatedly told me he would make it right, but hasn?t delivered. I scheduled a meeting with the painters to come out and review their work, but they never showed. Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
Twice during the project I was approached by his subs asking for money. Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs. First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy. The door guy said, it takes a long time for Joe to pay. It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete. The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture). Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
From average costs to expert advice, get all the answers you need to get your job done.


Discover the average cost of a steel fence and how prices vary depending on the fence’s height, installation difficulty, number of gates, and more.

Learn what affects the cost to repair a wood fence, from rotted posts to sagging gates. Get expert tips on common issues, maintenance, and when to hire a pro.

This guide outlines the cost to install a black chain-link fence as well as the factors the influence cost, including materials, labor, fence height and length, and location.

Estimate the total cost to repair a chain link fence, including labor rates and wire mesh options for addressing rust damage, sagging sections, and more.

How much a privacy fence costs is based on several factors, including the fence’s height and length, materials, site prep, labor costs, and more.