Top-rated outdoor lighting plan and installers.

Get matched with top outdoor lighting plan and installers in Shelton, WA

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Outdoor lighting plan and installers in Shelton

Avatar for Harts Plumbers, Electricians, & HVAC Technicians
Harts Plumbers, Electricians, & HVAC Technicians
4.6(
1,463
)
Outdoor Lighting - Plan and Install

Serving Shelton, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2013

Emergency services offered

Warranties offered

"Jesse was great! Although I just needed to replace a toilet, and some parts in another toilet, he did a thorough check of sinks, water heater and crawl space too. While in the crawl space he discovered the hose bib for the outdoor faucet was leaking in the crawl space, so I had him fix that as well. He was friendly, explained everything, and gave prices up front before the work was done. Would definitely recommend."
Prep Area
Waterfall Finished!
Excavation jobs and more!
 install grease trap for commercial kitchen
Delivery of Shoring

+334

63 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for Expedeck
Expedeck
5.0(
24
)
Outdoor Lighting - Plan and Install

Serving Shelton, WA and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"Sta-Built did a fantastic job on our projects. We interviewed 3 companies before we choose Sta-Built. All the companies bids were very similar in price, but the professionalism of Sta-Built was far beyond everyone we interviewed. Ryan came out and helped us design our projects. My husband and I wanted different designs and Ryan was able to show us what he thought would look best in the space we had to work with. So happy we went with Ryan's design. Both projects turned out fantastic. The crews that came out to do the work were very professional. Ben and Johnathan are meticulous and so is the rest of the crew. Our wall and walkway turned out great. I wish all contractors were this professional. Some before and after pics. Not in the right order. But you get the idea."
Andrew Farjo
Landscape Lighting with retaining walls
Accent wall / Seating wall with LED lighting
Andrew Farjo
Andrew Farjo

+31

Recommended by100%of homeowners
Avatar for Exact Electric
Exact Electric
4.7(
141
)
Outdoor Lighting - Plan and Install

Serving Shelton, WA and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"Andrew did and excellent electrical installation. He was on time, personable and very knowledgeable. The office staff person, Teresa, communicated regularly with us and kept us informed of our scheduling options. We are very satisfied with Exact Electric and plan to use them again whenever we need electrical services."
Finished Kitchen
Bathroom
Living room
Service
"Floating Cloud" Metropark

+2

Recommended by93%of homeowners
Avatar for J & R Rockscapes
J & R Rockscapes
4.5(
57
)
Outdoor Lighting - Plan and Install

Serving Shelton, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"Ryan and crew came to our home for a fairly big job.  Pull tree stumps, grade yard, transplant bushes and shrubs and install 8 cycle sprinkler system and install fire pit.  We couldn't have been happier as Ryan and crew were very punctual and very friendly to work with.  I would and have recommended them!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+74

Recommended by97%of homeowners
Avatar for Santos Landscaping & Maintenance LLC
Santos Landscaping & Maintenance LLC
5.0(
3
)
Outdoor Lighting - Plan and Install

Serving Shelton, WA and surrounding areas

Free estimates

Emergency services offered

Small jobs welcome

If you need a landscaping service provider, get in touch with Santos Landscaping & Maintenance LLC. High-quality services, really good prices and attitude which deserves admiration.\n\nWe serve in Bremerton, WA, Tracyton WA; Port Orchard WA; Poulsbo WA; Vashon WA; Parkwood WA; and the surrounding areas.\n\nLandscaping Contractor, Landscaping, Lawn Care Companies, Affordable Landscaping, Four Seasons Lawn Care\nLandscaping Company, Quality Landscaping, Landscaping Specialist\n\nFor more information visit our website: https://santoslandscapellc.com/

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Response time1 day
Recommended by100%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Outdoor Lighting - Plan and Install

Serving Shelton, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Showing 1-10 of 28
FAQs for outdoor lighting plan and installation projects in Shelton, WA

Permit requirements for outdoor lighting vary depending on your location and project scope. Simple fixture replacements don't require permits, but projects involving new electrical circuits, extensive trenching, or significant system expansions often do. Local building departments establish these requirements, and many professional electricians handle permit applications as part of their service package.

The timeline for outdoor lighting installation varies based on project complexity. Basic systems might require only one to two days for complete installation, while extensive lighting networks with numerous fixtures and complex wiring needs could extend to a week or longer. Weather conditions, property accessibility, and soil characteristics can all influence how quickly professionals can complete your installation.

Outdoor lighting offers both practical and aesthetic benefits that many homeowners find valuable. Beyond enhancing nighttime visibility and security, well-designed lighting can highlight architectural features and extend outdoor living hours. While installation represents a significant investment, quality lighting may potentially increase property appeal and could contribute to overall home value.

Some outdoor lighting projects are suitable for homeowner installation, particularly simple solar fixtures or low-voltage systems that plug into existing outlets. However, projects requiring new electrical connections, permanent wiring, or integration with home electrical systems demand professional expertise. Electrical work carries inherent safety risks, and improper installation could create fire hazards or code violations.

The operating cost for outdoor lighting depends primarily on your fixture types, bulb selection, and usage patterns. Energy-efficient LED fixtures consume significantly less electricity than traditional incandescent or halogen alternatives. Controlling your lighting with timers, photocells, or motion sensors can further reduce energy usage by ensuring lights operate only when needed or beneficial.

The Shelton, WA homeowners’ guide to outdoor lighting plan and installations

From average costs to expert advice, get all the answers you need to get your job done.