How much will your project cost? Get Quotes Now

Bathroom Remodelers in Mobile, AL

Where do you need a Bathroom Renovation Contractor?

Reviews of Mobile Bathroom Remodelers

Know any great Bathroom Remodelers in the Mobile area? Let us know about them and you might be eligible to receive a Amazon.com gift certificate. Refer A Pro today!

Are You a Quality Pro? Join Our Network

Recent Job Requests for Remodel a Bathroom Contractors in Mobile, Alabama:


New Lead
Project Location: 36695
Date: 08/16/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes

New Lead
Project Location: 36695
Date: 08/14/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

New Lead
Project Location: 36693
Date: 08/14/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes

New Lead
Project Location: 36604
Date: 08/14/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Replace shower unit including shower base using cultured marble. Repair water damage. Replace sink and vanity tops to match shower. Remove wallpaper and refinish and paint walls. Replace vanity and sink lighting fixtures and possibly mirrors above vanity and sink. Replace shower and sink fixtures. Add additional electrical outlets in bathroom and closet.

New Lead
Project Location: 36609
Date: 08/14/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Cabnet to look like a piece of furniture counter top granite new fixtures new flooring paint tub and surround tile 8x15

New Lead
Project Location: 36695
Date: 08/14/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Have 2 other bathrooms after master to remodel

New Lead
Project Location: 36695
Date: 08/13/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

New Lead
Project Location: 36695
Date: 08/11/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Remove tub and install a tiled shower.

New Lead
Project Location: 36606
Date: 08/10/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Bath gut already done, 1st rough plumbing done, need finish ( durorock, sealer, drywall, tile. Have materials. Have plumber.

New Lead
Project Location: 36603
Date: 08/10/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months

Project Location: 36605
Date: 08/04/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: We need tile work on floor and wall.

Project Location: 36607
Date: 08/03/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project Location: 36606
Date: 08/02/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: I hired Lowes to design and remodel my only bathroom. The designed left her job and the contractor was fired. However, I purchased all the materials and they are sitting in my house. I would say that stage one has been done, green board installed on walls and floor by the tub, the tub has been installed. I cannot move into the house because it only has one bathroom. The water and power have been off for more than two months. I need a crew to come in and use the materials there, so labor only. Please respond.

Project Location: 36693
Date: 08/01/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months

Project Location: 36693
Date: 07/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 36618
Date: 07/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes

Project Location: 36695
Date: 07/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: I own a house in which my parents live. The "master" bath is very small and in need of updating. There is a window that I would like to replace in order to move the shower to that wall. I would still like to have a window, but perhaps a long rectangular window up by the ceiling. I want to create a layout which will accommodate moving the entry door in the future. But for now, keeping the entry door in the bedroom, moving the shower to the opposite wall, move the toilet to be next to the shower, and then the vanity on the opposite side of the toilet.

Project Location: 36693
Date: 07/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 36695
Date: 07/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 36604
Date: 07/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Moving the west wall, out approximately 2', which will take up the pantry area presently being used for storage, to give the bathroom more depth. Moving the shower plumbing to the east wall, shower type layout, this will entail removing the existing tub and replacing it with a shower type system with glass panels and seating area for comfort of showering. Moving the toilet proportional to the wall movement, westward. New mirrors and lighting, recessed type lighting. Adding a pocket door, east wall entrance to the bathroom area. The pantry has a door opening into the hallway which needs to be removed and sheet rock finished and trimmed out to match existing. Tile flooring needs to be discussed with contractor, we presently have left over tile from our kitchen remodeling project. Electrical switches will have to be move to make room for the pocket door and update the exhaust fan in the bathroom, repainting, will be discussed with the contractor. I am sure there are more items for discuss
 

Unscreened Addition & Remodeling Contractors in Mobile, Alabama

Butcher Remodeling
958 Cloverdale Drive
Mobile, AL 36606
Greg Murphy Contracting, Inc.
62 N. Sage Ave.
Mobile, AL 36607
Grady Dortch & Sons, Inc.
2435 Denmark St.
Mobile, AL 36617
Bayside Property Consultants, LLC
2200 Highway 98, Suite 4, Pmb
Daphne, AL 36526
All-American Siding & Windows, Inc.
5219 Highway 90 West
Mobile, AL 36619
L A Image Home Improvements
103 Tibiedow Circle
Daphne, AL 36526
Kenney-Moise, Inc.
2205 Sterling Court
Mobile, AL 36695
At Your Service
P.O. Box 83
Fairhope, AL 36533
Copeland Custom Homes, Inc.
3414 Forest Ridge Court
Saraland, AL 36571
 

References Available
Tell us your zip code to view pricing & schedule
Tell us your location to view pricing & schedule
Choose your project to view pricing & schedule

Please enter valid zip.

Please choose a location.

We're sorry but the time you have chosen is no longer available.
Please select a new time below:
does not provide service to View pros who serve this zip
There was an issue connecting to the server. Please try again or call Customer Service at 1-877-800-3177.
We're sorry but the time you have chosen is no longer available.
Please select a new time below:

Select your appointment type and time:

Final Step - Confirm Your Appointment:

Confirm your appointment with on , - Change


Required
 
Required
Required
Required