Recent Job Requests for Remodel a Bathroom Contractors in Seattle, Washington:
Project Location:
Seattle,
WA
98133
Date: 05/19/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Comment: bathroom needs a complete remodel
Project Location:
Seattle,
WA
98115
Date: 05/19/2013
Consumer Owns Home: Yes
Desired Completion Date: 5 - 6 weeks
Project Location:
Seattle,
WA
98155
Date: 05/18/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: Remove old bath tub and tile, change small window, tile the shower, change counter top to match tile in shower, new toilet.
Project Location:
Seattle,
WA
98199
Date: 05/14/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Comment: Replace shower in bathroom with tile or stone, replace one small bathroom floor and laundry room with tile
Project Location:
Seattle,
WA
98133
Date: 05/14/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Comment: Removel of snik and extend the wals about 6 feet. Put in shower and some other pluming.
Project Location:
Seattle,
WA
98126
Date: 05/11/2013
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: House built in the 40s, bathroom not remodeled since the 70s or 80s. I think I'd like to take down the plaster walls to redo the electrical, insulation and drywall. 5' x 5' floor space, plus tub that can stay. I'd like to put sub-floor heating in and re-tile the floor and walls within the tub/shower space. The toilet was updated when I moved into the house and tub does not need replacing. Other than that is a complete remodel. I redid the electrical myself on a 3-room remodel, and may be interested in taking on the electrical to cut cost.
Project Location:
Seattle,
WA
98166
Date: 05/07/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Project Location:
Seattle,
WA
98178
Date: 05/06/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Project Location:
Seattle,
WA
98107
Date: 05/06/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: Bathroom remodel
Project Location:
Seattle,
WA
98146
Date: 05/03/2013
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Project Location:
Seattle,
WA
98115
Date: 05/02/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: bathroom build in a basement
Project Location:
Seattle,
WA
98119
Date: 04/2013
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: It's time to update. Molding around bathroom floor in master needs to be replaced also. Flooring dates back to 1992...vinyl...would like to replace with marmoleum if possible or tile.
Project Location:
Seattle,
WA
98188
Date: 04/2013
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Comment: Tile on three sides of shower needs to be replaced.