Top-rated acoustic ceiling tiles install pros.

Get matched with top acoustic ceiling tiles install pros in Hillsboro, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Acoustic ceiling tiles install pros in Hillsboro

Avatar for C & A's Chimney Sweep & Lawn Maintenance Services
C & A's Chimney Sweep & Lawn Maintenance Services
4.7(
1,376
)

Serving Hillsboro, IN and surrounding areas

In business since 2009

"They were very professional and thorough. They laid down tarps from the front door to the fireplace to keep all the debris off the carpet. He did a great inspection and then cleaned the chimney thoroughly. Will hire again!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by92%of homeowners
Avatar for Floors Decor & More LLC
Floors Decor & More LLC
5.0(
8
)

Serving Hillsboro, IN and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"There were a few obstacles once the work began. They found some rot under the doors and there was an electrical problem. The guys did a great job and worked until things were right. I am very happy with the results."
Soffit was damaged from the tree.
Before the makeover.
Dura rock with mortar joints. This is the beginning of the process.
Before picture.
Before picture

+31

Recommended by100%of homeowners
Avatar for Hoosier Permanent Coatings
Hoosier Permanent Coatings
4.4(
130
)

Serving Hillsboro, IN and surrounding areas

In business since 2003

Free estimates

Credit card accepted

"We live in an older home, built in 1947. After much research we decided to make the switch from regular paint to the newer, more permanent coating style of paint. We selected Hoosier Permanent Coatings as our supplier  last October---and weather turned against us before  we could get the job completed last year. Hoosier Permanent Coatings, held our price for 2014 and stayed in touch with us as the weather began to warm in the spring (this year) to get us on the schedule at a time that was convenient for us. In addition we had significant window repair and replacement being done (by another contractor) that had to be coordinated along with the painting job. In short I cannot say enough good things about Hoosier Permanent Coatings (HPC) and particularly their Office Manager, Rosemary. While I was having serious challenges with the window contractor, HPC was with us every step of the way. When it finally became time for them to do their job---they arrived on time, worked extremely long days, all with great care, and did the most beautiful job!  Rosemary communicated regularly regarding what would happen each day...and that's exactly what happened. Their crew supervisor (I forget his name)--was terrific as well. Very respectful and professional. Everyone of the crew was thoughtful and courteous. A manager came by the job each day--to be sure I was satisfied and to see if I had any additional questions.
I cannot say enough nice things. I would heartily recommend Hoosier Permanent Coatings to everyone that is considering this service. Our house has never looked better!
"
Br. before
Br. after
B. after
B. before
Bu. before

+27

Recommended by88%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Hillsboro, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
This Clean House Corp With Niecy Frazier
4.9(
24
)

Serving Hillsboro, IN and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"I recommended Niecy Frazier and This Clean House to our church board because her crew cleaned a rental house for me earlier this year.  I was impressed with the work she did, and it was a delight doing business with her.  They vacuumed floors (scrubbed, in the kitchen), dusted and wiped or washed everything, chased out cobwebs that were older than they were, dusted the books in the library, made the restrooms sparkle, and the kitchen shine.  The board asked me to write the review because I have an Angie’s list account.  This Clean House is now on the church list of preferred providers, and we will definitely call Niecy again when it’s time for another round."
Recommended by95%of homeowners
Showing 1-10 of 48

FAQs for acoustic ceiling tiles install projects in Hillsboro, IN

Ask the following questions to make sure you know what’s involved and that you’ve hired a good team:

  • Is your company licensed, bonded, and insured?

  • What is the best tile size for my project?

  • What fire rating do my ceiling tiles need?

  • How long will it take to install the drop ceiling?

  • What is the height of the finished drop ceiling?

Most residential building codes require a minimum ceiling height of 7.5 feet from the floor to the finished drop ceiling, ensuring adequate headroom and safety compliance. Since requirements can vary by location, consult your local code enforcement office or a professional installer to confirm the specific clearance needed for your project.

Installing a drop ceiling results in a loss of ceiling height ranging from 3 inches to 8 inches. The exact amount depends on factors like the size of the fixtures above, such as ductwork or lighting, and the manufacturer's recommendations for installation. Local building codes also dictate minimum ceiling heights, so it's important to consult with a professional installer to determine the optimal drop distance for your specific space.

Installing drywall costs between $1.50 and $3 per square foot for materials, labor, and finishing—significantly less than the $9 to $13 per square foot average for a drop ceiling. While drop ceilings come with a higher initial cost, they offer greater design flexibility, easy access to utility lines, and are simpler and less expensive to repair. To minimize expenses, consider budget-friendly fiberboard panels, though their appearance may be less appealing to some homeowners.

Drop ceilings offer several advantages and disadvantages.

Pros:

  • Easy to install and repair

  • Conceal stains, ductwork, and other unsightly elements

  • Provide quick access to ducts and wiring for maintenance

  • Available in various styles to suit your design preferences

Cons:

  • Reduce ceiling height

  • Tiles may require replacement after a few years

  • Less sturdy than traditional ceilings

  • Installation can be more time-consuming than drywall

Removing a drop ceiling costs between $2 and $7 per square foot, which includes disassembling the rail system and removing tiles. Factors such as ceiling size, accessibility, and disposal fees affect the total cost. If you're removing a drywall ceiling, expect costs of $2 to $4 per square foot. Hiring a professional ensures safe removal and proper disposal, preventing damage to underlying structures.

The Hillsboro, IN homeowners’ guide to acoustic ceiling tiles installs

From average costs to expert advice, get all the answers you need to get your job done.