Top-rated excavation pros.

Get matched with top excavation pros in Addison, MI

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Top-Rated Excavation pros in Addison - Updated Nov 2026

Avatar for Warner Excavation LLC
Warner Excavation LLC
5.0(
9
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Addison, MI and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

"Beyond impressed with this company!!!! They went above and beyond what I was expecting and made my yard look incredible with the removal of several trees, stumps, and power raking my entire property ridding it completely of poison ivy and poison oak. I would HIGHLY recommend them."
Response time2 days
Response rate91%
Recommended by88%of homeowners
Leland Prebble Construction
4.0(
2
)
Excavation - Major Grading or Resloping

Serving Addison, MI and surrounding areas

In business since 1976

Free estimates

Leland Pebble Construction is dedicated to providing its customers with the very best in excavation and building site preparation services. With over 30 years of experience, no project is too big or too small. We operate 24/7 and are always here to take a call. Contact us directly to schedule an appointment today!

Response time3 days
Recommended by100%of homeowners
Showing 1-10 of 30

FAQs for excavation projects in Addison, MI

Depth depends on the type of installation and the regulations in your area. Water supply lines typically require 24 inches, while drainage pipes are often installed 36 inches below grade. For most general projects, a depth of 12 to 24 inches and a width of about eight inches is sufficient. Sticking to these specs keeps your utilities safe, code-compliant, and easier to maintain later.

When you need to run utilities underground, you’ve got two main options: boring or trenching. Boring employs directional drilling to install utilities without exposing a continuous channel, while trenching requires excavating an open channel to place utilities securely. Directional drilling preserves landscape integrity, whereas trenching provides direct access for installation, albeit with greater surface disruption. This clear comparison helps you select the method best suited to your project.

Plan on 12 hours to dig 100 linear feet when the soil is cooperative and you can work continuously. This timeframe applies when work is performed consistently and methodically. Factors such as rocky soil, tree roots, obstructions, and frozen ground increase the overall duration, demanding extra planning and effort. Comprehensive operational planning ensures that every challenge is managed efficiently and the project is completed on schedule.

If you want your yard to look untouched, laying fresh sod over the trench is the quickest fix. New sod needs 30 to 45 days to root and blend with the rest of your lawn. A local sod pro can provide you with a firm timeline and tips to ensure the grass takes hold and maintains your curb appeal.

The Addison, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.