Top-rated excavation pros.

Get matched with top excavation pros in Markleville, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Excavation pros in Markleville

Avatar for American EarthWorks
American EarthWorks
5.0(
8
)

Serving Markleville, IN and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"We had such a great experience! They made room in their busy schedule & went above and beyond to create my vision & meet my crazy deadline. I will definitely be hiring them again for more landscaping projects!"
Response time5 hrs
Response rate91%
Recommended by100%of homeowners
Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)

Serving Markleville, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"My family experienced water and wind damage earlier this year. We had to be placed in a hotel. After reaching out to numerous companies, we chose Maynor construction. I am glad we did!! If it wasnâ t for Maynor and his staff, I wouldnâ t have made it. The process was long and depressing because of being away from home. However Maynor and his staff reassured me. They showed patience with me and worked hand and hand with my insurance company with getting my home repaired in a timely manner. Thank you Maynor! I truly feel like we are family!"
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
10 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Silvers Concrete and Paving, LLC
Silvers Concrete and Paving, LLC
4.2(
12
)

Serving Markleville, IN and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

"They were very professional and knowledgeable. I've been on concrete pours and the personnel were well trained on what to do, and how to do it. I would recommend this company to any of my friends and family. Thanks for a job well done."
Driveway
Driveway
Stamped Patio
Stamped Patio
Brushed Patio

+2

Response time4 hrs
Response rate95%
Recommended by80%of homeowners
Avatar for Sweet's Land Clearing & Forestry
Sweet's Land Clearing & Forestry
5.0(
2
)

Serving Markleville, IN and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"Very responsive, professional and honest. Explained the process, made sure I was happy with the completed work and even made suggestions which decreased the original estimated cost of our project. We will be using them again."
Response time2 days
17 neighbors recently requested a quote
Recommended by50%of homeowners
...
Showing 1-10 of 89

FAQs for excavation projects in Markleville, IN

Depth depends on the type of installation and the regulations in your area. Water supply lines typically require 24 inches, while drainage pipes are often installed 36 inches below grade. For most general projects, a depth of 12 to 24 inches and a width of about eight inches is sufficient. Sticking to these specs keeps your utilities safe, code-compliant, and easier to maintain later.

When you need to run utilities underground, you’ve got two main options: boring or trenching. Boring employs directional drilling to install utilities without exposing a continuous channel, while trenching requires excavating an open channel to place utilities securely. Directional drilling preserves landscape integrity, whereas trenching provides direct access for installation, albeit with greater surface disruption. This clear comparison helps you select the method best suited to your project.

Plan on 12 hours to dig 100 linear feet when the soil is cooperative and you can work continuously. This timeframe applies when work is performed consistently and methodically. Factors such as rocky soil, tree roots, obstructions, and frozen ground increase the overall duration, demanding extra planning and effort. Comprehensive operational planning ensures that every challenge is managed efficiently and the project is completed on schedule.

If you want your yard to look untouched, laying fresh sod over the trench is the quickest fix. New sod needs 30 to 45 days to root and blend with the rest of your lawn. A local sod pro can provide you with a firm timeline and tips to ensure the grass takes hold and maintains your curb appeal.

The Markleville, IN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.